FACILITIES. FACILITIES FACILITIES YEAR 1 PRIORITY 1 San Benito CISD will utilize the efficiency audit, prioritize reported items and enlist the Maintenance.

Slides:



Advertisements
Similar presentations
Technology Use Plan Methacton School District Patty McGinnis ED TECH 501.
Advertisements

Construction Report July 28, Projects KMS Phase IIClose out –KMS CafeteriaClose out –KMS Renovations & AdditionsClose out –Royalwood Elementary.
Del Mar Union Schools Facilities Master Plan Update September 19, 2012.
Measure G Overview March 9, Measure G School Facility Improvement East Side Union High School District To provide greater security and safety, relieve.
Greenbush School Maintenance Calendar. JULY Week 1 ❏ Check clock systems ❏ Fertilize athletic fields ❏ Drag and roll baseball/softball fields ❏ Clean.
Managing the Information Technology Resource Jerry N. Luftman
Facilities Report Zionsville Community Schools. Facilities & Grounds Overview by the Numbers  Acres—558 Farm Lease--200  Buildings—11 School Buildings—8.
Atlanta Public Schools Athletic Audit Update March 2010.
Information Technology Services Technical Support Services Summer 2009 Accomplishments Fall 2009 Current Projects.
Every student prepared for a world yet to be imagined Seamless Technology and Services that are available every time, without fail Provide excellent, distinctive.
SUPPORT SERVICES SUMMER 2014 UPDATE August 14, 2014.
Term 2, 2011 Week 3. CONTENTS The physical design of a network Network diagrams People who develop and support networks Developing a network Supporting.
Presented by- Kelley F. Davis Lamar University Educational Technology.
Technology Planning. Primary Elements Stakeholders Leadership team Needs assessment Technology components Work plan Budget Policies Evaluation.
Information Technology Study Fiscal Crisis and Management Assistance Team (FCMAT) Las Virgenes Unified School District Presented By: Leslie Barnes Steve.
Scott Butson District Technology Manager. Provide professional to all district staff Professional development has been provided on a regular basis to.
Project 3 Supporting Technology. Project Proposal.
Budgeting Technology. Start with a Plan Learners Learning Environments Professional Competency System Capacity Community Connections Technology Capacity.
April 28, A shared commitment to provide the most effective education to all students so they live successful lives. In order to accomplish the.
February 28, 2012 Presented By: Eileen Rohan, Superintendent Sean Maher, Network Manager Katie Frank, White Hill Michael Bessonette, Brookside Upper Ron.
Estates across STFC This presentation is to give PPD the opportunity to respond to proposals for the future management of Estates across STFC The proposals.
MODERNIZATIONS MEASURE G OVERSIGHT COMMITTEE September 8, 2015.
Lincoln Public Schools Lincoln, Nebraska Lincoln Public Schools Work Session 10-Year Facility and Infrastructure Plan Update October 22, 2013.
FY2017-FY2026 GDRSD Capital Plan-June 22, 2016 Jared Stanton, Director of Business and Finance.
E-Rate and District Technology Plan By Gwen Davis.
Author name here for Edited books chapter 9 Facility Maintenance 9 chapter.
FACILITIES FACILITIES YEAR 1 PRIORITY 1 PRIORITY 1 San Benito CISD will utilize the efficiency audit, prioritize reported items and enlist the Maintenance.
Development of a Comprehensive Modernization Project at Burroughs Middle School Community Meeting January 20, 2016.
April 23, A shared commitment to provide the most effective education to all students so they live successful lives. We envision using technology.
White Pigeon Community Schools
Francis Howell School District
FHSD Proposition Howell Information.
Capital Facilities Program Update San Rafael City Schools
Allen Independent School District November 7, 2016
WILMINGTON PUBLIC SCHOOLS
Technology Department Annual Report
Capital Construction Bond Program
Strategic Planning & Operations
FACILITIES. FACILITIES FACILITIES YEAR 1 PRIORITY 1 San Benito CISD will utilize the efficiency audit, prioritize reported items and enlist the Maintenance.
FACILITIES. FACILITIES FACILITIES YEAR 2 PRIORITY 1 San Benito CISD will utilize the efficiency audit, prioritize reported items and enlist the Maintenance.
Information Technology (IT) Department
ESPLOST I REVIEW.
Dr. Joseph Meloche Superintendent of Schools Mrs
SCSU Technology Update FY05
CMGT 445 Competitive Success/snaptutorial.com
CMGT 445 Education for Service/snaptutorial.com
CMGT 445 Teaching Effectively-- snaptutorial.com.
FIVE YEAR CAPITAL FACILITIES PLAN (Five Year Plan)
Fort Cherry School District
UNION GROVE ELEMENTARY REFERENDUM
Effective Use of Existing Buildings for
Measure E Technology Update
Safety and Security- From Assessment to Implementation
ISO-9001 Quality Management System
Measure N Update Board Items for June 07, 2017
Perkins September 2014.
CURRICULUM & INSTRUCTION
FINANCE. FINANCE FINANCE YEAR 1 PRIORITY 1 PRIORITY 1 San Benito CISD will work to provide a full day pre-kindergarten program with highly qualified.
Effective Use of Existing Buildings for
P-20. P-20 P-20 YEAR 1 PRIORITY 1 PRIORITY 1 SBCISD will implement a developmentally appropriate and aligned curriculum for Prekindergarten and Kindergarten.
1 Stadium Company Network. The Stadium Company Project Is a sports facility management company that manages a stadium. Stadium Company needs to upgrade.
Carleton College Facilities Management
Charter Oak Unified School District
Capital Outlay Workshop
Superintendent’s Goals October 20, 2015
Technology Department Annual Update
New York State Smart Schools Bond Act
How Do I Write a Good Technology Plan?
Capital Facilities Program Update San Rafael City Schools
FY Capital Improvement Program Draft
Presentation transcript:

FACILITIES

FACILITIES YEAR 1 PRIORITY 1 San Benito CISD will utilize the efficiency audit, prioritize reported items and enlist the Maintenance and Energy departments to target and complete tasks addressed. YEAR 1 GOAL YEAR 1 GOAL: To develop goals, assess needs, and implement changes. STATUS (MARCH 2017) A committee consisting of David Garcia (Director of Buildings & Grounds), Chris Cole (Lead Technician), Hilda Rendon (Executive Director of Finance & Operations), Margot Torres (Executive Director of Human Resources), Leonila Pena (Director of Technology) and Adan Mares, Jr. (HR Specialist) have met to discuss goals, needs and changes. Several meetings were held through out November 2016 – March 2017. District Roof analysis was taken to committee and tabled. Continue with cost analysis for the A/C Department. Estimated costs are as follows: A/C department = $235,000.00 (Note: Appropriations have been allocated) – A/C Timeline Dr. Garza Chiller 95,000.00 Summer 2017 Landrum Café A/C 35,000.00 Landrum Elem 5 DX Sys 25,000.00 Dr. Cash chiller 80,000.00 235,000.00

FACILITIES YEAR 1 PRIORITY 1 CONTINUATION STATUS (MARCH 2017) Continued Summer work schedule is being developed based on campus needs assessment to include: waxing of floors, painting of rooms, pressure washing chiller coils and cooling towers, grounds, etc. Inspections of all playgrounds are being conducted on a monthly basis and evaluated for possible replacement. Upgrade for Landrum Elementary Cafeteria DX System. Chiller project was completed at Riverside MS December 2016. An RFP was released/closed for the canopies at 3 elementary schools and the High School: and are in the process of being evaluated and taken to Finance Committee. An RFP was released/closed for a district architect to assist district in long range facility planning and is currently being considered by the Board. NEXT STEPS Purchase A/C equipment and install at Dr. Garza Jr. Elementary, Landrum Elementary and Dr. Cash Elementary. If approved, canopy project will commence. Schedule roof project within next 60 days at Dr. Garza Elem. Considering an RFP for a district wide pest control management plan. Long range Facilities assessment plan based on District needs.

FACILITIES YEAR 1 PRIORITY 2 San Benito CISD will develop a detailed comprehensive long range plan, for the future development and renovation of the campus / district facilities and to provide a 21st Century learning space that ensures student readiness for higher education. YEAR 1 GOAL FA.P2-YEAR 1 GOAL: Strategic Planning Committee shall introduce highlights to community via presentations and social media. STATUS (MARCH 2017) Maintain the web page to showcase completed projects of the Buildings & Grounds and Construction & Energy departments on the San Benito CISD Website. [Buildings & Grounds link (http://bng.sbcisd.net/ ), Construction & Energy link (http://construction.sbcisd.net/)] We obtained a score board assessment and received proposals for the repair/replacement of the score board at Bobby Morrow Stadium. Track resurfacing has been completed as of February 2017. Portables at Sports Complex have been repaired to include: sidewalks, walkways, railings and painting. Playgrounds have been completed to include fitness gyms at the following campuses: La Encantada Elem., Rangerville and Ed Downs. Fencing has been completed for the following campuses: Dr. Cash/Miller Jordan, Landrum Elementary, Fred Booth Elementary, La Encantada Elementary Portables buildings at PRC have been assessed and determined that maintenance on buildings are not cost effective. Lighting retrofit has been completed with energy efficient T5 lighting for the following: VMA Gym, Angela Leal Elementary indoor gym and Transportation area at UTEX building

FACILITIES YEAR 1 PRIORITY 2 CONTINUATION NEXT STEPS Continue development of a long range District Facilities plan. Continue assessment of District wide portable buildings to determine condition and reparability. Discuss possible solutions for non-repairable portable buildings District wide. (i.e. PRC) Obtain quotes for bleacher replacements for San Benito High School Gym. Obtain quotes for Marquee signs at campuses where needed.

FACILITIES YEAR 1 PRIORITY 3 San Benito CISD will expand the quality of technology infrastructure to accommodate emerging technologies that support academic innovation and technology integration into teaching and learning to prepare students for the 21st Century. YEAR 1 GOAL FA.P3-YEAR 1 GOAL: To conduct a needs assessment to evaluate technology needs. STATUS (MARCH 2017) Walk through for campuses have been conducted and will continue as projects progress. Network hardware inventory for all campuses has been documented and is being maintained as network projects progress. Data from survey, curriculum and efficiency audits has been compiled and reviewed. Highest areas of need include: Network hardware: wireless controllers, wireless access points, network cabling, power management (generator for Administration building, UPS – Uninterruptible power supplies for all campuses), upgrade/replace existing phone system Network Software: user account management, mobile device management (MDM), Microsoft Licensing renewal/upgrade, Virtual Server (VMWare) Environment and Licensing, web content filter upgrade (CIPA) Children's Internet Protection Act appliance 4 elementary campuses need wireless access points plus network drops (83 Aps, 83 drops) 20 sites need network drops for the new APs purchased through Erate FY2015 (627 drops for 627 APs) All campuses need to have the UPS (Uninterruptible Power Supplies) or the batteries for the UPS(s) replaced. 9 campuses need the core switch upgraded. The existing core switch has reached end-of-life and is no longer supported.

FACILITIES YEAR 1 PRIORITY 3 CONTINUATION NEXT STEPS Obtain quotes for hardware and software identified during the needs assessment. Develop three year plan to purchase hardware and software identified during the needs assessment based on priority. Evaluate and utilize E-rate funding and other resources to address any deficiencies identified district-wide.

FACILITIES YEAR 1 PRIORITY 4 San Benito CISD will combine the efforts of the Maintenance/Energy departments to develop and implement a comprehensive preventative maintenance plan. YEAR 1 GOAL FA.P4-YEAR 1 GOAL: To establish a comprehensive maintenance program to correct deficiencies. STATUS (MARCH 2017) Mr. Garcia, Director of Building and Grounds has completed training on IPM, Asbestos and Indoor Air Quality. Sexual Harassment, First Aid and CPR training has been completed for all Maintenance and A/C personnel. Cross training will continue to be ongoing provide Maintenance and A/C employees with the knowledge base of detecting any deficiencies that may be needed. A/C department has developed and implemented a check list for HVAC equipment inspections including a Freon log. Ongoing. Inspections will continue and will be performed on a quarterly basis to help prevent any major repairs and chillers are checked quarterly. Ongoing. Maintain monthly playground inspections and also complete safety inspection checklists. Ongoing. Mr. Cole, Lead Technician, has completed and attained TDLR Environmental A contractor’s license . Manuals and training on standard operating procedures as per efficiency audit has been completed. Request For Quotes (RFQ) for Pest Control Management Plan. NEXT STEPS Continue to monitor ongoing projects and continue to assess campus/district needs.

FACILITIES YEAR 1 PRIORITY 5 FA.P5: San Benito CISD will improve the functionality, energy efficiency and security of all campuses and district facilities. YEAR 1 GOAL FA.P5-YEAR 1 GOAL: To analyze the functionality, efficiency and security of all campuses. STATUS (MARCH 2017) School Fencing will be assessed and estimates for repairs will be compiled. Completed. Miller Jordan and Dr. Cash fencing has been completed. Placement of Surveillance cameras will be assessed to determine how many are needed and locations. Ongoing. Locations that have been completed for Surveillance cameras are as follows: Berta Cabaza MS, VMA Ag Barn, San Benito High School, VMA, Miller Jordan MS Removal of brushy areas and foliage around the school district is ongoing. Continue to address assessments of parking lots for possible repairs. NEXT STEPS Continue implementation of all of the above items. Additional fencing assessments for the following campuses: Dr. Garza and VMA. Video Surveillance cameras are pending upgrades on additional campuses.