LIU Consolidation project (INDICO ) E. Blanco BE/ICS

Slides:



Advertisements
Similar presentations
TE / CRG / Paulo Gomes The Control System for the LHC tunnel cryogenics, p. 1 CERN Portuguese Teachers Programme, 7 Sep 2011 Dr. Paulo Gomes on behalf.
Advertisements

PSB extraction and transfer kickers 01/10/2014 LIU-PS ABT review1 L. Ducimetière, L. Sermeus.
FUNDAÇÃO PARA A CIÊNCIA E TECNOLOGIA FCT Trainee Program Follow Up João Rodrigo Alvelos Ferreira | Started March 2013 October 2014 TE-VSC-ICM.
CERN Ivan Romera MPE-Technical meeting Status on CERN-ITER collaboration for Machine Protection Acknowledgments: J.Burdalo, R.Schmidt, S.Wagner, M.Zaera.
TE-MPE-TM 09/08/2012, TE-MPE-MS section WIC: Overview of on-going projects + Outlook to LS1 activities: - Short introduction to WIC systems - Booster renovation.
Status of the PSB 2 GeV Upgrade and the RCS Study SGUI Meeting B. Mikulec, 07 July 2011.
Power converters implications for Booster Energy Upgrade Jean-Paul Burnet, Serge Pittet LIU day, TEEPC.
Accelerator Consolidation Workshop TE/EPC consolidation plan 2 Jean-Paul Burnet ACC consolidation day, 12/09/2013.
LIU-IONS Linac3 meeting LIU Project – Planning and Installation Julie Coupard EN/MEF-OSS.
FAIR Accelerator Controls Strategy
IT-4082 Design, Supply, Installation and Commissioning of the ventilation of the BAF3 building Alexandre Broche EN-CV-PJ.
880.P20 Winter 2006 Richard Kass 1 The Large Hadron Collider LHC is located at CERN CERN is located near Geneva Part of CERN is in France The LHC collides.
Work Effort in the LHC Injector Complex for the Upgrade Scenarios B. Mikulec Thanks to all the valuable input from the LIU project leaders and LIU work-
Extraction Michael Bevins May 17, GeV Upgrade - Beam Transport Injection, Linac, Extraction, & Correctors Preliminary Design and Safety Review.
LINAC4 and the Upgrade of the LHC Injector Complex R. Garoby 26 February, 2013.
Planning of Injector Activities for Linac4-to-PSB Connection and LS2 Thanks to all the valuable input from the LIU project leaders and LIU work- package.
The Control System for the LHC tunnel cryogenics Controlling Cool Accelerators Controle da Criogenia de Aceleradores de Partículas Dr. Paulo Gomes CERN.
SPS 200 MHz RF Upgrade Eric Montesinos LIU-SPS coordination meeting 15 th August 2012.
LIU EL-FC ACTIVITIES Georgi Minchev Georgiev EN-EL-FC EDMS
CV Activities for PSB-LIU POPS-B (new MPS for the PSB-LIU) B 245 PSB Demi water cooling plant Stefano Moccia, EN-CV Meeting 07/03/16.
1 Cryogenics Instrumentation & Controls Commissioning for the LHC AB/CO viewpoint Enrique Blanco AB/CO IS.
LIU Configuration Management EDMS Documentation, Layout and ECRs This presentation follows the LIU-PSB specific presentation done on 9 th October 2014.
PSB extraction and transfer kickers LIU TE-ABT review, 20 November L. Sermeus.
LIU Critical Key activities in Long Shutdown 1 (2013) LIU-PSB: assuming LINAC4 connection in LS2 –Beam dump consolidation If not done: operation will be.
ELENA installation progress F. Butin / ELENA collaboration.
LS1 Day: The Injectors S. Baird EN/MEF Thanks to R Brown, N Gilbert, D McFarlane & V Chohan, IEFC workshop…. LS1 Day: The Injectors 1.
Main MPE Activities during YETS/EYETS/LS2 and the Provision of Resources Andrzej Siemko Andrzej Siemko TE-MPE1.
LS2 Safety Preparation Thomas Otto, LS2 Safety Support Officer for LHC
Report Technical Director Storage-Ring-Installation Completed
Combining safety and conventional interfaces for interlock PLCs
Survey on “Chargés de Consignation” Status Update
LIU and TE/VSC activities LIU-SPS aC coating & flange impedance reduction Paul Cruikshank LIU & TE/VSC activities, 23/6/2016 Paul Cruikshank.
LIU and TE/VSC activities Status September 2016 LIU-SPS aC coating & flange impedance reduction Paul Cruikshank on behalf of TE-VSC LIU & TE-VSC, 19/9/2016.
YETS & LS2 Works EN-EL / Power distribution
The CERN Linac4 history, performance, perspectives
Status & Plans for WA105 Control System
Status, Schedule and EVM for the test facility project
LIU – EVM status and next steps
BE-ICS activities for LIU Project
Controls & software Andy Butterworth.
Status of HESR 18th March Gießen Dieter Prasuhn.
PSB Lock Out Test, Follow-Up AP. Bernardes-/EN-STI, K
BE-ICS Activities during the LS2 Period (15 min)
Injector De-cabling Project
TE-MPE LS1 review Vision from EN-EL(CF)
CMS gas systems meeting
AD consolidation activities in LS2
LIU–PLI report LIU PSB meeting.
Planning and Installation
BE-ICS activities for LIU Project
BE/RF-IS Contribution to LIU C. Rossi and M. Paoluzzi
EN 4946 – Refurbishment of Electrical Substations
TE-ABT Activities for LS2
Installations, modifications, consolidation in 2005:
TE/EPC activities for YETS & LS2 LINAC 2-3, PSB, PS & TT2
PSB/PS/TT2/Linac2-3 YETS 2017–2018 & LS2 preparation meeting
SPS EN-CV Planning LS (initial draft)
SPS Planning for the EYETS Meeting 8 (07/12/2016)
LIU, ABP-CWG, PBC, miscellaneous
HL Consolidation Day Analysis of needs from BE-ICS
SPS activities during LS2 TE-EPC (Power Converter Group)
YETS & LS2 Works EN-EL / Power distribution
East Hall under construction
PLAN Results K. Foraz on behalf of LS2 team
CERN with UNICOS M. Pezzetti AT_ECR_CE 27 June 2005.
III. Correction Dipoles MDG Accessories for all Magnets V. Summary
Extraction Michael Bevins May 17, 2007
Implementation of RP training ranks in SPS and NA_target
SNS-PPU upgrades the existing accelerator structure
ILO Industrial Opportunities Days, 6-7 June 2019
Presentation transcript:

LIU Consolidation project (INDICO 665320) E. Blanco BE/ICS 28/09/17 Industrial Controls

Industrial controls activities E. Blanco, BE/ICS 28/09/17 Identified projects: PLAN: 10697 : POPS-B - New project PLAN: 10835 : LIU-SPS RF power upgrade BAF3 PLAN: 11054: GCS LINAC4 PLC and supervision code consolidation and upgrade

PLAN 10697 : POPS-B - New project E. Blanco, BE/ICS 28/09/17 Project (EDMS 1643409) New main power system for the supply of the Main ring Dipole and Quadrupole magnets. It will need a complete industrial control system. (The current PSB Main Power Supply is not suited to provide the voltage and current profiles required by the increased extraction energy from 1.4 GeV to 2 GeV) It will be based on CERN UNICOS framework and SIEMENS CPU S7-1500. In terms of additional functionality that is required by the UNICOS framework, it had been summarized in the document sent to BE-ICS on 13th of June 2017. Project development by TE-EPC* BE-ICS contribution Specific development to be done for the framework adaptation. Under study Not critical for the success of the project. Dates LS2 * Communication by M. Dudek

PLAN: 10835 : LIU-SPS RF power upgrade BAF3 E. Blanco, BE/ICS 28/09/17 Project Associated by EN-CV to the ventilation renovation for the BAF3. Process responsibility: EN-CV* BE-ICS contribution Process control project for the ventilation of the BAF3. Already developed and sent to EN-CV Dates To be commissioned in November 2017 * Communication by R. Barillere

PLAN: 11054: GCS LINAC4 PLC and supervision code consolidation and upgrade E. Blanco, BE/ICS 28/09/17 Project Linac4 hydrogen source. (Hydrogen Gas Delivery System for the LINAC 4 Ion Source) Consolidation of control logic. Still not specified. Upgrades of SCADA and UNICOS components. Nothing major (except maybe a check on risk analysis) Process responsibility: EP-DT (Gas team)* BE-ICS contribution Process control project Control components upgrade Dates LS2 (TBD) *(Communication by R. Guida)