Oct 22 Group Leaders Planning meeting

Slides:



Advertisements
Similar presentations
Ad Hoc Bulk Electric System Task Force Update RPIC February 19, 2009.
Advertisements

6-Nov-06 FALC Resource Board Global Design Effort 1 Report from the GDE Barry Barish Caltech / GDE 6-Nov-06.
Global Design Effort BDS KOM Opening remarks/comments from EDR Project Management SLAC Marc Ross / Nick Walker.
S L H C – P P Management Tools Kick-off Meeting April 8 th, 2008 Mar CAPEANS CERN This project has received funding from the European.
Controls & LLRF ILC Controls Telecon September 20, 2006 John Carwardine 1.Reports from ESRF Meetings 2.Misc. Items 3.Participant “Radar” Items.
IEEE /r3 Submission September 2008 John Notor, Cadence Design Systems, Inc.Slide 1 IEEE IMT-Advanced Review Process Date:
27-March-10 LCWS10 - Beijing Global Design Effort 1 Barry Barish LCWS10 - Beijing 27-March-10 “Cost Containment” for the TDR.
24-Aug-11 ILCSC -Mumbai Global Design Effort 1 ILC: Future after 2012 preserving GDE assets post-TDR pre-construction program.
Global Design Effort DR Session Introduction S. Guiducci (LNF) ILC10, Beijing 27 March 2010.
ML Planning for ILC08 First Pass + SCRF agenda Chris Adolphsen Hitoshi Hayano.
Philip Burrows SiD meeting, Chicago 15/11/081 Progress on the LoI Philip Burrows John Adams Institute Oxford University Thanks to: Hiro Aihara, Mark Oreglia.
Global Design Effort Accelerator System Kick-off Meeting e- source SLAC Marc Ross.
AS TAG Leaders Meeting PM Report. Topics R&D Plan release 4 ADI WebEx meetings (cost and design) Central region integration face-to-face meetings.
1 Global Design Effort: Controls & LLRF Controls & LLRF Working Group: Tuesday Session (29 May 07) John Carwardine Kay Rehlich.
October 25, 2007 A. Brachmann Slide 1 ILC polarized Electron Source EDR Work Packages ALCPG/GDE Meeting Fermilab, October 25, 2007 Axel Brachmann.
SCRF Cavity WebEx Meeting May 17, 2010 Reports from PM (10 min.) – Brief report from ILC-PAC – Industrialization workshop as IPAC satellite meeting, Kyoto,
DRWS07 KEK Global Design Effort ILC Damping Rings Mini-Workshop December, 2007 High Energy Accelerator Research Organization KEK,
Global Design Effort Main Linac Technology System Kick-off Meeting Cavity Summary 20 Sept 2007 DESY Marc Ross.
Project X Collaboration Plan Steve Holmes Accelerator Advisory Committee Meeting May 6-8, 2008.
PM Report AS ILC PAC (19-20 May) Agenda: –Akira, Rongli, Hitoshi H, Marc, Nick, Toshiaki, Mark P., Peter G. –Nick will report on Design –Marc.
CFS / Global – 09 June, 2010 PM Report: SB2009: –4 two-day workshops form the core of ‘TOP LEVEL CHANGE CONTROL’ –  as advised by AAP, PAC and etc –Written.
Main Linac Technology (MLT) Meeting To be held through WebEx July 13, 2007.
Global Design Effort Accelerator System Kick-off Meeting e- Summary Day 1 25 Sept 2007 SLAC Marc Ross.
ML-SCRF: Monthly WebEx Meeting April 4, Reports from PMs (20 min.) GDE activity and meeting plan Summary document of SCRF-Baseline Technical Review.
Global Design Effort RTML KOM Close-out Ross, Walker.
TDR Technical Editorial Board Webex meeting, 16 th Dec 2011 Report from the Chair (John) Technical Editing reports (Benno, Maura) Review of TDR Outlines.
Global Design Effort Controls LLRF EDR Kick Off Meeting View from the Project Management Office Fermilab / ANL August 20, 2007.
SCRF Monthly WebEx Meeting March 9, Report from PMs (15 min.) 1.Acknowledgements for completing S1-Global cold/RF test (A. Y.) 2.GDE meeting plan.
The SiD LOI Proposed Milestones and Schedules SiD Collaboration Phone Meeting September 6, 2007 John Jaros.
PM Report CFS /Gbl ILC PAC (19-20 May) Agenda: –Akira, Rongli, Hitoshi H, Marc, Nick, Toshiaki, Mark P., Peter G. –Nick will report on Design.
Plan for the First Baseline Assessment Workshop (BAW-1) Akira Yamamoto, Marc Ross, and Nick Walker ILC-GDE Project Managers to be discussed at GDE/ADI.
July 11, 2008M Ross for PM - ILC GDE - ILCDR08 closeout 1 GDE Program for the ILC Technical Design Phase Marc Ross for: Akira Yamamoto, Nick Walker GDE.
Project Management 6e..
ARIES WP2 Task 2.2 kick-off Coordination, support and enhancement of communication/outreach activities for accelerators in Europe Jennifer Toes (CERN),
On Campus Internship Work Plan Creation
Agenda items TEB activities at KILC TDR SVN repository roll-out
Project Management 6e..
Stakeholders Meeting High-Level Update on the Forthcoming Consultations Incorporating ComFrame Text with Revised Insurance Core Principles (ICPs) La.
SCRF WebEx Monthly Meeting Agenda and Reports from PM
Implementation Review Team Meeting
Software Configuration Management
EDR Planning, Cost Review and Technical Risk Analysis
ILC Project Management Status
Global System Kick-off Meeting
Report on plan to produce an Engineering Design Report
ILC-EDR Kick-off Meeting, Cryomodule and Cryogenics
ILC PROJECT ENGINEERING DESIGN REPORT CFS Europe – KICK OFF MEETING
Yamamoto WG3: ML-SCRF Parallel Session,
Conventional Facilities and Siting Global Group (CFS) SLAC Update December 10, 2007 Acknowledgment: Jerry Aarons, Clay Corvin, and Esther Kweon Fred Asiri.
Technical Design Report preparation
CLIC/ILC Collaboration Meeting: Objectives & Organization
Health Resources and Services Administration (HRSA)
Broward County Consolidated Communication Committee Update
PCS CCB Group 22nd February, 2017.
Continuity Guidance Circular Webinar
Project Management Process Groups
Amendment Invoice Task Force Progress Report
X-DIS/XBRL Phase 2 Kick-Off
Exit Capacity Substitution and Revision
Finance & Planning Committee of the San Francisco Health Commission
IEEE IMT-Advanced Review Process
IEEE IMT-Advanced Review Process
IEEE IMT-Advanced Review Process
Amendment Invoice Task Force Progress Report
Comments on IMT-Advanced Review Process
Ctclink executive leadership committee May 31, 2018
DR Session Introduction
Preliminary Project Execution Plan
(Project) SIGN OFF PROCESS MONTH DAY, YEAR
CalACES JPA Board of Directors Meeting February 22, 2018.
Presentation transcript:

Oct 22 Group Leaders Planning meeting collect draft work package descriptions, including proposed institutional assignments, by the last day of the meeting. Now initial work package information should be available and where we can have a general question / answer session. Be prepared to talk about the manner in which the community was canvassed and expressions of interest were solicited. Talk about the agenda and goals for your parallel session, including joint sessions (usually done). Falc rg Akira accom M. Ross Oct 08, 2007Global Design Effort

Oct 22 Group Leaders Planning meeting begin planning for the next set of multi-day group-by-group meetings, to take place in the coming winter and spring. be prepared to describe how best to organize these and an appropriate charge. we would like to review your plans, leading to the next GDE meeting (Tohoku, Sendai – March 3, 2008), for developing the EDR schedule. The EDR schedule, with resource information, will be published at that meeting. Also, today we talked about a kick off meeting summary. Falc rg Akira accom M. Ross Oct 08, 2007Global Design Effort

M. Ross Oct 21, 2007 Global Design Effort Timeline – May 2007 to March 2008 May 24 PM Troika announced June 11 PM troika meet – Group Leader plan July 09-11 First EC review of PM, FALC meeting August 15 ILCSC EDR Plan Presentation Aug 20 – Nov 7 EDR Kick Off Meetings October 21-26 EC review of PM, ILCSC update – PP1 December 18 WP Matrix to FALC RG; ‘R & D Plan’ January 18 FALC presentation of R & D Plan March 03 – 06 Presentation of EDR plan – PP2 M. Ross Oct 21, 2007 Global Design Effort

Tasks assigned to AS Group Leaders: Short Term Milestones (Nick): Complete WBS matrix Review/refine WBS (WP definitions) templates Consolidate EoI Understand resource base Document RDR baseline in EDMS All relevant documentation in EDMS structure Re-establish traceability between design and cost information Specifications etc. Begin first iteration of accelerator design Lattice review Aim for partial EDR freeze by Tohoku Need to review the effort required for the above tasks M. Ross Oct 08, 2007Global Design Effort

‘Technical / Global Systems’ (from RDR) Vacuum Magnet Systems Dumps/Collimators Instrumentation (RF Power, Accel. Phys., Cavity, Cryomodule carried forward) Global Installation Availability and Operations (CFS, Cryogenics carried forward) Alignment Role: Development of standards and review Passive, not directly connected to the TA Group Leaders M. Ross Oct 08, 2007Global Design Effort

M. Ross Oct 08, 2007Global Design Effort ‘Technical Systems’ We will: collect and review work package proposals from Groups have broad spectrum of effort, in some cases from a broader base than that used in RDR Try not to arrange technical leadership in an ad hoc fashion RDR Technical was quite US-centered in practice instead ‘cross-collate’ the WP we receive and block out / propose Engineering Leadership from these we present this now, together with the concept of in-kind; plug compatibility etc. John Carwardine will help coordinate M. Ross Oct 08, 2007Global Design Effort

Meetings and Reporting towards EDR Primary function of the kick off meeting was communication Routine telecon meetings to begin following ALCPG07 Routine reporting to be introduced tomorrow (monthly email report from Group Leaders and PMO) Important topics: review process planning value engineering planning ILCSC MAC? AAB? M. Ross Oct 08, 2007Global Design Effort

Regular Meeting schedule Wednesday is EDR Teleconference Day (GL = Technical Area Group Leaders) Incl. PMO, APM M. Ross Oct 08, 2007Global Design Effort

ED PROJECT PHASES, MILESTONES, DELIVERABLES Four phases: Planning Implementation Report Preparation Completion Project (non-technical) Milestones and Deliverables (presented to EC / ILC Daegu, Aug 14/ 15, 2007) M. Ross Oct 21, 2007 Global Design Effort

Planning Phase (July 07 - March 08) Milestones Project Management Team releases all necessary project guidance, tools, and organizational information to Technical Area Group Leaders. Technical Area Group Leaders provide WBS dictionary, preliminary list of work packages, and preliminary list of issues, decision points, and resource requirements. Interim Deliverables (Oct 07) pp1 Engineering Design Project Management Plan version 1 WBS template and guidance document for Technical Area Group Leaders Basic design parameters and interface (lists) and possible ACD Change control template and guidance document for Technical Area Group Leaders Deliverable (March 08) pp2 ED Project WBS dictionary for Levels 1-3 Preliminary outline of Engineering Design Report Preliminary list of final deliverables for the Engineering Design phase Preliminary resource plan Prioritized list of issues and decision points to be addressed during ED Phase Consolidated RDR documentation in EDMS M. Ross Oct 21, 2007 Global Design Effort

Implementation Phase – after Tohoku (March 08 – July 09, 12 months prior to EDR release date) (Engineering Design and associated R&D) Milestones Level-2 and Level-3 technical responsibilities & interfaces reconciled between accelerator, global, and technical systems groups. Accelerator area designs frozen and released to engineering groups. Level-2 to Level-3 technical parameters & requirements for Engineering Design released to Technical Area Group Leaders. Key technical issues answered for Engineering Design Completion of integrated cost value engineering exercise Deliverables Technical information that is needed for BCD/ACD down-select decisions. Revised (Updated) engineering design data from all accelerator leaders Supporting evidence that design can be realized and meet technical requirements. First draft M. Ross Oct 21, 2007 Global Design Effort

M. Ross Oct 08, 2007Global Design Effort Planning M. Ross Oct 08, 2007Global Design Effort

M. Ross Oct 08, 2007Global Design Effort Implementation M. Ross Oct 08, 2007Global Design Effort