Safety Clearance of NA62 01/09/14 FV.

Slides:



Advertisements
Similar presentations
Barhale Procedure for Site Establishment
Advertisements

31/03/11FV 1 CEDAR from flammable gas safety point of view.
NA62: Unlocking the Zeptouniverse Timothy Khouw and Madeline McGaughey Supervisor: Dr. Augusto Ceccucci.
Permit to Work Procedure Document Number: KOC.SA.004
ENVIRONMENTAL SAFETY - PATIENT PURPOSE / POLICY Purpose: ▫To outline the mechanism to identify any environmental, mobility, and bathroom safety risks.
H IGH L UMINOSITY LHC WP1 - CERN S AFETY R EQUIREMENTS Stefan Roesler - Phillip Santos Silva – Ralf Trant EDMS# HSE Unit April 2011.
EATM12-08 Contribution NA62 Francois Butin, Lau Gatignon / EN-MEF 4 September 2012.
André Henriques DGS/SEE LIU-PSB OOSTER. HSE S AFETY C ORRESPONDENT 13 TH S EPTEMBER 2012 September 2012.
18 June 20031Integration Review B. Schmidt Outline: Filter design and basic concept to ensure seismic stability Filter Installation and the required tooling.
© Imperial College London 1 Risk Assessments & Standard Operating Procedures Dr Ann Maconnachie CMIOSH Departmental Safety Officer.
Challenges and Overview From Technical Coordination 27/08/2013 -FH1.
POLENKEVICH IRINA (JINR, DUBNA) ON BEHALF OF THE NA62 COLLABORATION XXI INTERNATIONAL WORKSHOP ON HIGH ENERGY PHYSICS AND QUANTUM FIELD THEORY (QFTHEP'2013)
SPSC Questions to the 2014 NA62 Status Report 1 Beam: which is the beam structure expected in October? Which is the intensity you can reasonably expect?
Muon System Safety Issues Burkhard Schmidt.
1 EARLY SAFETY MANAGEMENT OF PROJECTS AND EXPERIMENTS HSE UNIT PH DSO EDMS No
GIF in EHN1- layout, construction and schedule Adrian Fabich, EN-MEF-LE GIF users meeting, 12 th February 2014.
HSE-LSA HSE procedure foresees a Launch Safety Agreement for all new project –this is since several year made systematically for all new projects. The.
CENF – Civil Engineering Extension B887 Status – 02 October 2014 Done: (1/2) Preliminary civil engineering drawing and Functional specification approved.
J. Pedersen EN DSO Performance Scientific performance Measurable, reproducible, controllable: Documented presence! Technical performance Measurable,
HV Connector and Endcaps, Part II After the discussion at this week’s LST meeting we went back to the drawing board and tried to implement Mauro’s suggestion.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
The new approach to the CERN Safety Policy and Safety Organisation A. Goehring-Crinon & R. Trant.
PH Department in context Safety Officers in PH Department
Purpose NEW BEAM DUMP TUNNEL Launch Safety Agreement - conventional aspects LIU-SPS external beam dump meeting - C. Colloca DGS/SEE LSA conventional.
19/11/2015 PSB and PS&TT2 Facilities YETS L. Kobzeva.
CENF – Civil Engineering Extension B887 Status – 18 September 2014 Done: (1/2) Preliminary civil engineering drawing and Functional specification approved.
DGS/SEETerritorial Safety Officer (TSO) - Initial Territorial Safety Officer (TSO) – Initial course SPECIFIC HAZARDS ELECTRICITY EDMS No
Territorial Safety Officer (TSO) - Initial The TSO function2.
ADO-PO Section Meeting Safety Activities Sigi Wenig (LEXGLIMOS) 8 September 2015.
A2-A5: The drawing has been revised (minor changes), the bid has been approved by INFN management and the invitation letter to the companies will be sent.
8/4/2015R. Guida PH-DT-DI1 Info 1)Air conditioning system Status: Adrian Fabich contacted CV and he is waiting for info. Today I’m going to meet experts.
Safety Documentation Formerly an exotic unknown, today part of the work!
22/03/11FV 1 NA62 DCS CAN bus lines. Short reminder General properties of CAN bus o Up to 64 nodes on one bus o Different devices need different buses.
10/09/10FV 1 News and observations from Brussels' meeting.
The NA62RunControl: Status update Nicolas Lurkin School of Physics and Astronomy, University of Birmingham NA62 TDAQ Meeting – CERN, 10/06/2015.
South Tyneside Homes Empty Homes Team Dave Cutting Head Asset Management Mandy Mason Empty Homes Manager Debbie Snell Empty Homes Housing Co-ordinator.
INFORMATION ABOUT ASBESTOS EDMS No General, 2.Materials, 3.Risks, 4.Effects on health, 5.Prevention at CERN, 6.Work management, 7.Your role as.
PROCUREMENT RULES FOR EXPERIMENTS AT CERN Dante Gregorio CERN Procurement Service.
Safety - Lessons learnt from the design, commissioning and operation of the HIE-ISOLDE cryomodules Safety overview ESS 8 June 2016 AP.Bernardes/EN on behalf.
Logo area MQXF Review: Safety Thomas Otto HL-LHC Project Safety Officer With contributions by -Paolo Ferrcin and Ezio Todesco, TE-MSC -Francesca Viggiano,
Test beam check list Michael JECKEL EN-EA-EC. Content: Safety & Radiation Protection Arrival Access Installation Departure Michael JECKEL EN-EA-EC.
The AWAKE Safety Documentation C. ALANZEAU (editor) & Stakeholders –
CNOOC SES Ltd. VQHSE MS Vendor QHSE Management System
THIS MORNING (Start an) informal discussion to -Clearly identify all open issues, categorize them and build an action plan -Possibly identify (new) contributing.
09/09/10FV 1 NA62 common crate project. Crates survey result VF2 09/09/10 VME High populated TELL1 High populated TELL1 (Spare) Low populated TELL1 Low.
01/09/ KTAG 5/8 sectors equipped DCS system in pogress DAQ commissioning in progress Test pressure scan this week (t.b.c) 01/09/20142.
Cryogenic safety organisation at CERN
Test beam check list Michael JECKEL EN-EA-EC.
East Area Renovation Project Team meeting # 2 – EDMS News
Safety in the Neutrino Platform Hall
Strategy for conformity of non-standard cryogenic equipment
PAUL MATLANYANE ACTS NEC SECRETARY GENERAL 2014/15
Francois and Lau EATM 17 July 2012
Technical Scope of Work
DCS WG report 9/09/11 FV.
HSE rules & regulations
The TSO function (Territorial Safety Officer)
East Area Renovation Project team #6 Launch safety agreement
The ELENA Safety Documentation «time to prepare the safety clearance»
M. Sozzi NA62 TDAQ WG meeting CERN – 20/10/2010
EP Experiments safety validation process Safety Permits
DCS WG report 9/09/11 FV.
Proactive Incident Reporting
Lab Cleaning Day.
Technical Scope of Work
INFORMATION ABOUT ASBESTOS
Format of Meeting Information about the DofE Award nationally
1. Process Hazards Checklists
ODS licensing and annual quota system relationship and differences
RIBA Plan Tom Robinson sir david Swindells Vii
Presentation transcript:

Safety Clearance of NA62 01/09/14 FV

Formal framework Memorandum of Mark Hatch / PH Departmental Safety Officer, 25 August 2014 “The conventional safety clearance procedure for NA62 will be doing by DGS-SEE (HSE) Safety clearance for the radiological aspects shall be obtained from the DGS/RP group” Memorandum of Jonathan Gulley /DGS-SEE (EDMS 1403899) This memorandum outlines the conventional Safety checks, that shall be carried out in the frame of HSE Safety Clearance granted by the HSE Unit. Compulsory Safety checks might be required in addition to the HSE Safety Clearance. The HSE Safety Clearance will only be granted once all the conventional Safety checks have been successfully performed 01/09/14 VF

Three main information sources NA62 Safety file Complimentary tests (with subsequent recording in Safety File) Specialized safety visits Final clearance will be obtained after general safety inspection 01/09/14 VF

NA62 Safety file – rather poor state KTAG Mechanical drawing are mainly missing (just 3 files concerning support head) It is important to have a description of grounding scheme inside of Environmental Enclosure CHANTI The file is practically empty (just one document concerning mechanical stability of vessel) GTK It would be nice to have drawings (or reference to drawing repository) of GTK vessels LAV Good file – example to follow 01/09/14 VF

NA62 Safety file Straw tracker RICH CHOD LKr MUV IRC/SAC The file is practically empty (only 3 documents concerning stacking tool) RICH HV splitter documentation is missing CHOD The file is empty LKr MUV Mechanical drawings are missing Cables list is missing IRC/SAC 01/09/14 VF

Complimentary tests Proof test of piping – CEDAR piping Participation of the HSE (Pierre-Yves.Buisson@cern.ch) 01/09/14 VF

Specialized safety visits Electrical safety visit (second or third week of September) - Participation of the HSE Unit (Olivier.Tison@cern.ch). Please: Upload to Safety file your Cable list + description of custom made electrical equipment Ground your detector, equipment and metal structures around Fire inspection of the experimental area (second week of September) - Participation of the HSE (Fabio.Corsanego@cern.ch). Clean area from combustible material General Safety pre-visit (second week of September) - Participation of the PH DSO Office (Mark.Hatch@cern.ch). Clean area from any unused objects 01/09/14 VF

Clearance safety inspection is expected around 20 September Don’t forget to remove from TCC8/ECN3 all your tools, temporarily equipment, personal objects, etc., before the first beam on 6 October 01/09/14 VF