Meeting at Erice Great success!

Slides:



Advertisements
Similar presentations
Seog Oh/ Duke University/June, 2003 TRT/ ATLAS week at CERN Duke Production Status.
Advertisements

T1 status and plans INFN Genova November 2014 Collaboration Meeting.
Link Board Upscope Frascati group Napoli group Warsaw group.
Slide 1 Anthony Affolder US Silicon Meeting, March 9, 2004 Equipment Status ARCS equipment status à Single module and 4 hybrid DAQ equipment status à Vienna.
Coincidence group report Analysis meeting, 13/04/20151.
Experimental Beampipes: Status and Outlook Ray Veness / AT-VAC For the beampipe team With many thanks to the experiment’s installation and coordination.
Installation and Commissioning Planning Leslie Camilleri Calorimeter Commissioning Meeting 5 th September 2006.
Ronald Lipton PMG June Layer 0 Status 48 modules, 96 SVX4 readout chips 6-fold symmetry 8 module types different in sensor and analog cable length.
RPC Upscope : An overview with Indian perspective L. M. Pant Nuclear Physics Division Bhabha Atomic Research Centre L. M. Pant India-CMS Meeting, BARC.
Status report on the development of a readout system based on the SALTRO-16 chip Leif Jönsson Lund University LCTPC Collaboration Meeting
GEM R&D Update Kondo Gnanvo. Outline  GEM R&D and assembly facilities at UVa  Cosmic test results  Update on the 40 × 50 cm 2 GEM prototype  Plans.
1 DT critical items status: HVBoards Control and Trigger Boards Assembly in Torino fgasparini june 2004.
Status of NA62 straw electronics Webs Covers Services Readout.
1 HBD update Itzhak Tserruya DC Upgrades meeting, January 14, 2005 NIM paper II: Generic R&D ~ completed Full scale prototype construction Pending issues.
15/07/2008 EMCAL Meeting Nantes A. Palmeri - F. Noto I.N.F.N. Catania1 EMCAL CATANIA A. Palmeri - F. Noto.
CMS Experiment at the LHC, CERN Date Recorded: :21 CET Run/Event: / Candidate Collision Event Report from Belgium Michael Tytgat.
1 ME1/1 ODMB Production Readiness Review: Schedule and Budget Darien Wood Northeastern University For the ME1/1 Electronics Project.
D0 Status: 04/01-04/08 u Week integrated luminosity –1.7pb -1 delivered –1.5pb -1 utilized (88%) –1.1pb -1 global runs u Data collection s global data.
PSD upgrade - schedule/resources: electronics and cooling system F. Guber INR, Moscow NA61/SHINE upgrade workshop, CERN 3– 5 March, 2014.
1 HBD: Update and Schedule Itzhak Tserruya DC Meeting, BNL, April 13, 2005 Outline:  Full scale prototype status  Light source test  Construction Schedule.
Status of Muon Activities W.Baldini, N. Bondar, O.Maev, B. Schmidt LS1 Meeting Dec. 20-rd 2013.
CMS 1.Goal of the experiment CMS is a general purpose apparatus for LHC designed to study the physics of p-p collisions at the center-of- mass energy of.
9/12/2003Ivan Hruska1 First box prototype –Box design in July ‘03 –Box produced during August ’03 Tested last week in few fingers Small changes necessary.
HMPID maintenance activities during LS1 during LS1 Cosimo Pastore HMPID PLENARY MEETING March 22th, 2013.
High power RF tests places at CERN O. Brunner, CERN 4th SPL Collaboration Meeting jointly with ESS.
All Experimenters MeetingDmitri Denisov Week of July 22 to July 29 D0 Summary  Delivered luminosity and operating efficiency u Delivered: 3.1pb -1 u Live:
Brief Status of LHC Experimental Vacuum Project Ray Veness CERN TE/VSC.
DESY TestBeam preparation CERN ) Michele Bianco, Marcin Drozdwa Byszewski, Givi Sekhniaidze, Joerg Wotshack.
ID week 27 th of April 15 C3F8 cooling- Compressors & C3F8 status O. Crespo-Lopez EN/CV.
T2 Status Report IP5 Installation Future plans. IP5 installation The mechanical structure has shown problems on installation and should be changed slightly.
Planning 2009 JRA1 Meeting, Strasbourg March 4 th 2009 Ingrid-Maria Gregor DESY.
News from PNPI Presented by N. Bondar for B. Bochin Cagliari 8/10/2015.
CYLINDRICAL GEM I.T. FOR BESIII meeting. Meeting Agenda (morning)
News about the WA104 Programme C. Montanari – INFN and CERN technical working group meeting, September 16,
CMS – RPC GIF++ G. Pugliese on behalf of the RPC Collaboration 1.
Straw Working group Ferrara 4/9/2014. Outline Status and Plans Installation of Chambers 1-3 Chamber 4 Vacuum test SRB Readout, monitoring and software.
David BAILLEUX On behalf of the Caltech group Issues for the Laser Monitoring System M&O - US CMS ECAL IB meeting 19 March Chilled water supply.
September 5, Burkhard Schmidt Integration and Installation Outline: Integration and Infrastructure issues -Suspended platforms -Cable chains -Beam.
Extreme Energy Events M. Abbrescia Extreme Energy Events Meetings  Our technical meeting in Grosseto postponed: Morning 15 April  same day.
Extreme Energy Events M. Abbrescia Extreme Energy Events Two contributions at recent conferences:  Paola La Rocca: “Operation and performance of the EEE.
Detector status and commissioning: LUCID
Extreme Energy Events collaboration
LAV front-end and readout status
- STT LAYOUT - SECTOR F SECTOR A SECTOR B SECTOR E SECTOR D SECTOR C
HF Test station at P5 A.Mestvirishvili.
RD51-WG X June test beam experience: useful information for October
Plots for the performance paper
on behalf of the RF group
News Reconstruction with Analyzer v 2.0 going on
ITK Strip Module Meeting; 12st October 2015
Mini-drawers, FE-ASIC , Integrator
ELENA electron cooler and SEM grids status
NA61 news and plans News from other labs/experiments
Far Detector Activities Late 2017 – Early 2018
Proton Source and LEBT Luigi Celona & Lorenzo Neri
Multigap Resistive Plate Chambers for EAS study in the EEE Project
The CosMic Telescope Construction of a self-triggering prototype telescope at GHz funded at the Università del Salento (Lecce) – 2 years project (end 2013)‏
CMS Goal of the experiment
construction and tests
Talk general structure
PNPI – M3R4 – Panels 70% - HV bars 100% - FR4 frames 100%
Spare Chambers Proposal: send them at INFN Bologna
PolarQuEEEst First batch of patches (produced by PolarQuest) already out of stock because distributed in various events Produced additional 100 PolarQuEEEst.
Welcome back from holidays! …for a new year of exciting data taking
Analysis working groups
Equipment Status ARCS equipment status DAQ equipment status
Info and news EEE has been contacted by the TRADALBAGAS collaboration
The gas crisis Centro Fermi, Rome, 4 July 2019.
Report from the Editorial Board and Conference Committee
Liceo Scientifico “A. Volta”
Presentation transcript:

Meeting at Erice Great success! Many many congratulations to all the people involed (masterclasses, organization, agenda…)

New stations Chambers Spare chambers All chamber approved, after tests, except: LAMP-01: gas leak problems GENO-01: efficiency tests still not performed LODI-03: leak + efficiency tests still not performed Plan to test all chamber end of June – middle of July Spare chambers To be built in July: one time from Lodi + Albania Additional spare chambers needed: maybe Savona?

New stations Transportations Spare chambers Transportations being organized for Cariati and Siena by CERN Wooden boxes being the limit: boxes for Cariati and Sieni have to be sent back Transportations then for Torino and Genova If somebody can send INFN vans at CERN very welcome Spare chambers To be built in July: one team from Lodi + Albania Additional spare chambers needed: maybe Savona?

Material for new stations Gas systems One being sent from CERN to Cariati Other six already ordered, to be shipped 30 June Pressure reductions coming with bottles Additional pipes? Daniele HV boxes Six ordered last year (for upgrading old stations) At Lecce waiting for the mechanics (already ordered at an external firm) We need more (40): the whole process just being started

Material for new stations DC-DC converters Components ordered from CERN for 60+60 DC-DC converters For the first six telescopes to be assembled at INFN sections For the rest looking for external firm(s) VME electronics Ordered for 20 stations First six to be delivered for 30 June The rest in July and October Some electronics spare

Material for new stations Weather stations Old ones out of production Fabrizio designing new ones, waiting for news Trigger/GPS cards Trigger part ready GPS part under test at LECCE + CERN, waiting for news

Contribution for MC2 Requested a contribution for a didactic journal Many thanks to all people who collaborated: Daniele, Ivan Lorenzo, Marcello, Rosario, Silvia Sent to prof. L. Cifarelli for approval

Paper on long distance correlations Prepared by Franco, first reviewed by Francesco Nof., Ivan, Francesco Noz., Rosario, Luisa, MA Ready to be circulated in the collaboration

Data taking Run-3 “officially” stopped Stations free to keep on data taking Beware of high temperatures! Please fix all problems during shutdown Run-4 to start on 2 October One week of commissioning