E. Noah, A. Blondel, P. Benoit, F. Cadoux, A. Dudarev, L. Nicola, H

Slides:



Advertisements
Similar presentations
How to check close-to-the-line arrows F E D E R A T I O N I T N E R N A T I O N A L E D E T I R A L ' A R C a b TOP VIEW FRONT VIEW a b c d e c d e.
Advertisements

SBS Design Status Robin Wines. SBS Design Transfer in process of yoke steel from BNL, but BNL is having issues with their magnet tagging system – update.
January 6. January 7 January 8 January 9 January 10.
The CERN-JINR Collaboration J. Engelen March 27, 2006.
Tagger and Vacuum Chamber Assembly Procedure. Preassembly of second bottom yokes and poleshoes. a) Install special support. b) Place the second bottom.
Tagger and Vacuum Chamber Design. Outline. Design considerations. Stresses and deformations. Mechanical assembly.
EMCal Meeting CERN – July 2 nd 2007 LPSC Status 1 J-F Muraz LPSC Status LPSC Status.  Assembly Hall. - Removal starts and is in progress. - Main infrastructure.
MICE Collaboration Meeting March 29 - April 1, CERN MICE Integration Edgar Black/IIT March Room.
RD51 Common Test Beam: Status RD51 collaboration week Kolymbari, June 2009 Yorgos Tsipolitis NTUA.
EA meeting, Wednesday 6 Dec 2006 TT installation, Jeroen van Tilburg 1 TT installation Installation of the TT station.
June 2004 Andrea Gaddi, PH-CMI USC Installation Commissioning Task Force 1st Run Meeting, June 3rd, 2004.
BDS Design Studies John Amann ILC Mechanical Engineering 10/24/06.
Baby MIND Magnet 10 th June Meeting E.N.. Meeting goals 10 th June meeting goals: – Magnet design endorsement – Choice of coil option – Steel procurement.
FUNCTIONAL SPECIFICATION Dorothea Pfeiffer Dennis Haasler GIF++ User Meeting
Notes After TIG 17/7/08 HF+ Move out of garage: Aug 15* Platform+table+collars+racks+BP support (jack up for platform) = 3 days Controls for motors = 1.
AIDA 1 Mezzanine board Contacts for underside connectors Thermal contact pads.
GIF in EHN1- layout, construction and schedule Adrian Fabich, EN-MEF-LE GIF users meeting, 12 th February 2014.
SiD Conceptual Engineering Status Report Kurt Krempetz (Layer 5) (Layer 1) VXD.
Baby MIND coil modules assembly the aluminium folded strip solution 1 Alexey, Philippe, Gabriella, Helder, Herman Baby Mind Magnet CERN June.
Baby-Mind Magnetic Module Design A. Dudarev, G. Rolando, E. Noah, H. Pais Da Silva and H.H.J. ten Kate Baby-MIND update meeting #1 July 29,
19 January 2006VELO installationEddy Jans 0 VELO-installation meeting CERN, January 17, 2006 preparation IP8-area SX8 moving SX8 -> IP8.
E.Guschin (INR) 21 November 2003Integration EDR PRS/SPD static envelop, assembly and installation Detector layout Static envelop along the beam Detector.
LAV construction: Status and overview Matthew Moulson (Frascati) for the LAV Working Group NA62 Photon-Veto Working Group Meeting Brussels, 8 September.
SBS Magnet and Infrastructure Status Robin Wines July 2015.
Proposed Conventional Sextupole for Installation at A0 Introduction (Dean Still) Reasons for installation- Reduce I in S6 feeddown sextupole circuit at.
Booster L12/Noker-L13/Absorber Update PIP Update Talk August 15, 2012 Salah Chaurize.
IPN Lyon ILD integration April 2015 Jean-Christophe Ianigro & Imad Laktineh - IPN Lyon -
10/20/2015 TASD and MIND prototype and tests at CERN SPSC Oct Tests of TASD and MIND prototypes at CERN.
Matthew Moulson for the LAV Working Group NA62 Photon-Veto Working Group Meeting CERN, 11 December 2012 LAV construction & installation status.
Baby MIND magnet design or “how to best magnetise a steel plate” Alexey, Etam, Gabriella, Helder, Herman Baby Mind Magnet CERN June 10, 2015.
Baby Mind C OIL DESIGN AND ASSEMBLY SCENARIOS Helder Silva Phillipe Benoit Alexey Dudarev Gabriela Rolando Herman ten Kate Etam Messomo Laurent Nicola.
Baby MIND, Large Area Trigger Counters E. Noah WA105 General Meeting 21 January 2015.
Baby MIND Status 28 April 2015 – Third Hyper-K EU meeting E. NOAH A. Blondel, F. Cadoux, M. Capeans, N. Chikuma, H. Da Silva, A. Dudarev, Y. Favre, P-A.
Baby MIND Scintillator modules 11 November 2015 Revision E. Noah.
Baby MIND Module Cabling Options 27 th January 2016 F. Cadoux, Y. Favre, L. Nicola, E. Noah.
CERN QXF Conductor Procurement and Cable R&D A.Ballarino, B. Bordini and L. Oberli CERN, TE-MSC-SCD LARP Meeting, Napa, 9 April 2013.
Matthew Moulson for the LAV Working Group NA62 Photon-Veto Working Group Meeting CERN, 5 January 2013 LAV construction & installation status.
SPSC recommendations [Installation at PS-T9] Baby MIND weekly meeting 28 th October 2015.
EUDET HCAL prototype; mechanics Felix Sefkow Work by K.Gadow, K.Kschioneck CALIC collaboration meeting Daegu, Korea, February 20, 2009.
CERN Giovanna Lehmann, Xavier Pons
2012 BEST Robotics Design Competition: ‘Warp XX’
SiD Collaboration Meeting SLAC, December 2011
Baby-MIND Modules & Services
CBM magnet overview of the BINP work
Ferrara MECHANICAL SUPPORT for forward tracking detectors Federico Evangelisti INFN - Ferrara GSI – 2-6 march 2009.
PANAGIOTIS FARANTATOS(TE/MSC-MNC)* WP3, ESR 4: New Magnet
Yasuhiro Sugimoto 2012/2/1 ILD integration meeting
VELO-installation meeting CERN, January 17, 2006
LARP Phase II Secondary Collimator RC1
Test beam organization, schedule, requirements and installation This is no talk rather a questionnaire! Installation to T9 Preliminary schedule What do.
Other magnets procurement status:
T2K Upgrade First look at TPC contraints (WAGASCI Constraints)
Preparing Baby MIND for Japan
Scintillator module status
Baby MIND Status on T9 E. Noah 6th July 2017.
Cherrill Spencer, SLAC Member of ATF2 Magnet Team
Spectrometer Solenoid Fabrication Status and Schedule
Baby-MIND for T2K collaboration
Baby MIND beam test status
Test beam setup: status report 10/02/2009
Baby MIND Logistics for Japan
SHMS Downstream Beamline Large SHMS/HMS Angles (Config-1)
Question & Suggestions March 17th
Sebastian Bachmann University of Heidelberg Henk Schuiljenburg NIKHEF
III. Correction Dipoles MDG Accessories for all Magnets V. Summary
RDR Baseline Layouts for Interaction Region
LARP Phase II Secondary Collimator RC-1
STEEL PLATES.
LARP Phase II Secondary Collimator RC-0 and RC-1
PS magnet status D Bodart 25/06/2019.
Presentation transcript:

Installation of ARMCO modules on assembly stands … for integration of Scintillator modules E. Noah, A. Blondel, P. Benoit, F. Cadoux, A. Dudarev, L. Nicola, H. Ten Kate 7th February 2017

Top view of assembly zone Assembly zone occupation: 13 February – 24 March Block 1: Series: 091611 Type I …. x 4 Type II …. x 5 Keep orientation on stands same as positioning at J-PARC for most modules Have scintillator modules in the center for ease of access during pre-cabling! Entrance Block 1: Block 1: Ref. Type II Pos. 09 Ref. Type II Ref. Type I Pos. 07 Pos. 04 Ref. Type II Pos. 01 Block 4!! Ref. Ref. Ref. Pos. 29 Pos. 08 Pos. 06 Pos. 03 Type II Type I Type I Type II Ref. Arrow indicates location of ARMCO magnet plate number which is etched into the side of the plate

Top view of assembly zone Assembly zone occupation: 24 March – 24 April Keep orientation on stands same as positioning at J-PARC for most modules Have scintillator modules in the center for ease of access during pre-cabling! Entrance Block 4: Block 3: v Block 2: Ref. Type I Pos. 26 Ref. Type I Ref. Type I Pos. 14 Ref. Type I Pos. 18 Pos. 10 Block 4!! Ref. Pos. 29 Pos. 22 Pos. 16 Pos. 12 Type II Type I Type I Type I Ref. Ref. Ref. Arrow indicates location of ARMCO magnet plate number

Top view of assembly zone Assembly zone occupation: 24 April – 15 May Keep orientation on stands same as positioning at J-PARC for most modules Have scintillator modules in the center for ease of access during pre-cabling! Entrance Block 4: Extra scintillator modules Ref. Type I Pos. 26 Ref. Type I Pos. 30 Pos. yy Pos. yy Block 4!! Ref. Ref. Pos. 29 Pos. 33 Pos. yy Pos. yy Type II Type II Arrow indicates location of ARMCO magnet plate number

More info…

Assembly zone: 7 February 2017 28 plates: tested 4 plates: welding Support stands: painting Last plate: coil assembly!!

B-field tests: 7 February 2017 status Number of ARMCO magnet modules tested Series Type I Type II Total 091621 6 8 14 091611 5 7 12 479231 2 13 15 28 Series Mean Bmax σ_Bmax Mean Bres σ_Bres 091621 1.564 0.022 1.051 0.038 091611 1.594 0.012 1.117 0.098 479231 1.559 0.007 1.209 0.024 Min: 1.541 Max: 1.619

ARMCO position: position in Baby MIND detector in beam direction Block 1: Top View ARMCO position: position in Baby MIND detector in beam direction 9 8 7 6 5 4 3 2 1 Power supply this side Beam

Block 1: Installation of ARMCO magnet modules on assembly stands ARMCO position in Baby MIND ARMCO module type 1 II 2 I 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 ARMCO position: position in Baby MIND detector in beam direction ARMCO Position Module Type ARMCO Series Plate number Put on stand Orientation on stand Plate reference 1 II 091611 Yes normal Prevessin 2 I No N/A 3 4 5 6 7 8 Rotate 180 about mid-vertical Bellegarde 9

Block 2: Installation of ARMCO magnet modules on assembly stands ARMCO position in Baby MIND ARMCO module type 1 II 2 I 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 ARMCO position: position in Baby MIND detector in beam direction ARMCO Position Module Type ARMCO Series Plate number Put on stand Orientation on stand Plate reference 10 I 091621 Yes normal Prevessin 11 II No N/A 12 Rotate 180 about mid-vertical Bellegarde 13 14 15 16 17

Block 3: Installation of ARMCO magnet modules on assembly stands ARMCO position in Baby MIND ARMCO module type 1 II 2 I 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 ARMCO position: position in Baby MIND detector in beam direction ARMCO Position Module Type ARMCO Series Plate number Put on stand Orientation on stand Plate reference 18 I 091621 Yes normal Prevessin 19 II No N/A 20 21 22 Rotate 180 about mid-vertical Bellegarde 23 24 25

Block 4: Installation of ARMCO magnet modules on assembly stands ARMCO position in Baby MIND ARMCO module type 1 II 2 I 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 ARMCO position: position in Baby MIND detector in beam direction ARMCO Position Module Type ARMCO Series Plate number Put on stand Orientation on stand Plate reference 26 I Yes normal Prevessin 27 II No N/A 28 29 30 31 32 33

Layout driven by transport considerations d: detector module a: ARMCO steel module But can be optimized online for physics! d0 d1 d2 d3 d4 d5 d6 d7 d8 d9 d10 d11 d12 d13 d14 d15 d16 d17 d18 d19 [a1-3] [a4-6] [a7] [a8] [a9] [a10-11] [a12-13] [a14-15] [a16-17] [a18-21] [a22-25] [a26-29] [a30-33] 10 2000 10 500 500 500 200 200 Block 1 Block 2 Block 3 Block 4

Positioning of power supply racks: B2 floor at J-PARC JAPAN Position 2 confirmed by Minamino-san 6 February 2017 Position 2 Position 1 WAGASCI Position 2 is preferred! i.e. left side of Baby MIND on this top view orientation Shaft

Positioning of power supply at CERN T9 beam zone East Area

When standing in front of Baby MIND, looking into it, in direction of beam, … power supply is on right side, both at CERN and in Japan