HPV Route Assessment The South Australian Experience

Slides:



Advertisements
Similar presentations
ADA Requirements Well-designed sidewalks meet ADA requirements:
Advertisements

Railway Grade Separations Issues. Railway Grade Separations 1.Introduction Qualifications/experience to undertake bridge planning for railway grade separations:
Louisiana Safe Routes To School Program
KS 2 Being responsible for driving safety What responsibility do other road users have towards me? What responsibilities do I have towards other road.
SHARING THE ROAD WITH HEAVY VEHICLES You don’t have to be told there are a lot of trucks on the road. But do you always drive or ride with trucks in mind?
Capilano Road Improvement Project WELCOME TO THE OPEN HOUSE.
NH Route 28 Corridor Safety Audit Preliminary Analysis of Historic and Existing Conditions.
The Integrated Transport and Land Use Plan and Regional Mining and Infrastructure Planning Project Rod Hook Chief Executive Department of Planning, Transport.
TRANSPORTATION CORRIDOR OVERLAY DISTRICT ROUTE 29.
Lane Width Reallocations Based on 5-Year Crash Data Richard C. Moeur, PE ADOT Traffic Design March 2007 edition.
Chap 4 Cross Section Elements (pp.4-1 – 4-66 ) The following topics (pages) are covered in this lecture: Pavement (p.4-1 – 4-7) Pavement (p.4-1 – 4-7)
Florida Department of Transportation, November 2009
River Road West Penrose Street Bridge Street Road Safety Scheme May 2014.
Brief Overview of New ALCAM
Main Roads WA Perth Bicycle Network - Operational Overview Cycling Safety Forum 14 th May 2011.
CHARACTERISTICS OF TRAFFIC ENGINEERNG
Safety Audit Components Safety assessment for risk Management.
TRANED2010TRBPPTjgs MOBILITY SCOOTERS AND USER CHARACTERISTICS AT CROSSINGS AND INTERSECTIONS John G. Schoon University of Southampton, Transportation.
Intersection Control Evaluation (ICE). Outline  Background  ICE Process  Impacts  Current Status.
1 Development of countermeasures Hossein Naraghi CE 590 Special Topics Safety March 2003 Time Spent: 6 hrs.
Dissemination to support Research & Analysis John Cornish.
HPV Route Assessment The South Australian Experience John Olson Managing Director HDS Australia Pty Ltd.
Road Access Challenges and Solutions More Efficient Freight Operations National Opportunities Gerard Waldron Managing Director ARRB Group.
BROKENHEAD OJIBWAY NATION COMMUNITY MEETING June 23, :00 PM – 7:00 PM Information on the PTH 59N and PTH 101 Interchange.
Lesson 2 | Road Safety Issues 2-1. Learning Outcomes Define RSA. Explain the need for tools to improve road safety. Explain the role of GORE. Identify.
Access Management: South Carolina’s Experience Rick Werts Director of Traffic Engineering South Carolina Department of Transportation.
Federal Highway Administration University Course on Bicycle and Pedestrian Transportation Lesson 13 (Some of these pictures show bicyclists not wearing.
April 9, 2011 Mike Wieszchowski, P.E., PTOE Professional Traffic Operations Engineer Road Use Planning Guidelines to Protect Your Roadways.
Presentation PBS 2007 and beyond George Konstandakos.
Safe Road Infrastructure George Mavroyeni – Executive Director, Major Projects (former Executive Director, Road Safety and Network Access) May 2011.
The Fargo/Moorhead Area Interstate Operations Study Opportunities and Planned Activities Presentation for the Mn/DOT Travel Demand Modeling Coordinating.
Section III Day 4 Passing SOL’s
Complete Streets Training
Chris Feltham Head of Road Safety Engineering London Road Safety Unit Transport for London Road Safety Audit and Pedestrian Guardrailings.
Overview Interim Advice Note 85/06 Minor Improvements to Existing National Roads Development of Approach / Issues Identified NRA TA 85/11 Guidance on.
T-5.0 Topic 1 Processing Information Topic 2 Intersections, Curves, and Hills Topic 3 Passing Information Processing: Moderate Risk Environment WV Driver.
12/07/2006 Rev B1 T-1160 Work Permits This work has been produced by DGL (Aust) Pty Ltd This Learner’s Tool is about the skills and knowledge required.
Raumati Road Corridor Consultation and Corridor Assessment
PO Box 787, Five Dock, 2046ABN We acknowledge and pay respect to the traditional owners and custodians of the land on which.
An Overview of Stakeholder Roles and Federal Legislation at Grade Crossings May 18, 2016 presentation to CPWA Saskatchewan Chapter, Saskatoon Railway Safety.
LRTAWA - Annual Conference Heavy Vehicle Access & Working with Local Government.
Moloto Road (R573) Safety Investigations
Safe System – Comparisons of this approach in Australia
Presentation to Environment Portfolio Committee
Adjusting Speed Limits
Table 3 – Value of Dimension D
Routing Texas into the Future
Why is Rail Safety Important to me?
Portable Ladder Safety
Road Safety Audits in Europe
Interdisciplinary teams Existing or new roadway
Investigation of Road Project
Pedestrian Safety.
INTERSECTIONS CHAPTER 10.
Risk Evaluation for In-vehicle Sign Information
Importance of Geometric Design
Towards the Ideal Roundabout Design
Midblock Crossings Lesson 12 Publication No. FHWA-HRT
Safety Audit Components
Emily Guenther Zach Olson Laura Scott Cameron Wein
Traffic Study Presented by Keith Wenners, pe, ptoe
TOOLBOX TALKS Introduce yourself and the talk
Safe, Smooth, Sustainable Access Can we really have it all?
Transportation Workshop
School of Civil Engineering
This work has been produced by DGL (Aust) Pty Ltd
Do Roads Connect or Divide? The Other Side of the Road
SESSION 2B – TRAFFIC MANAGEMENT, SAFETY AND SECURITY 9 JULY 2019
Rural Transit Stop Design Guidelines Prof Omer maaitah
SIGHT DISTANCE Spring 2019.
Presentation transcript:

HPV Route Assessment The South Australian Experience John Olson Managing Director HDS Australia Pty Ltd

Outline DTEI Route Assessment Guidelines Role of the Authorised Route Assessor Issues

Role of the Authorised Route Assessor Engaged by Applicant (not DTEI/Council) Obtain statistical data and records relevant to the assessment from DTEI, incl: previous assessments traffic counts crash history road drawings Conduct the route assessment, determining impact of the RAV operating along a proposed route in terms of: effect on amenity, environment and impact on local communities ability of proposed RAV to be physically and safely accommodated along route Identify/assess risks using risk assessment model, then categorise as P1 (very high risk), P2 (high risk), P3 (moderate risk) and P4 (low risk) Prepare Route Assessment Report and Recommendations, including management of risks (accept, treat, transfer, avoid) Submit report to Applicant

Technical and Physical Criteria Assessment Connections with existing Gazette Route Traffic volumes Road width Township roads Overtaking provision Overtaking sight distance Low speed off tracking and intersection design Pavements and road surfaces Bridges and structures Railway level crossings Height clearance Crash statistics, highlighting “hot spots” Traffic counts Speed environment Adjacent land use / planning zones Other vehicle types

Issues Applicant costs – “user pays” principle: Initial application to DTEI Authorised Route Assessor fee Route upgrade requirements !! (may be shared with DTEI / Council) First user disadvantaged PBS requirements too severe – risk assessment and management process (e.g. for low volume routes) Lack of appropriate tools (e.g. turning path software) to test routes for PBS vehicles, particularly L2, L3 and L4 Operators running RAV’s illegally Old gazetted routes not suitable for newer heavy vehicles PBS take up in SA is low – only two types, including Heavy Mineral Concentrate (HMC) Triple Road Train (L3) in use through Ceduna to Thevenard Port Facility by Iluka Resources.

HPV Route Assessment The South Australian Experience Thank You Questions during Panel Discussion