Market Notice Regarding Off-line Units

Slides:



Advertisements
Similar presentations
EMMS R4 GARF Addendum Ryan Aldridge, ERCOT Wholesale Market Development
Advertisements

NPRR 532 Performance Measurement & Verification and Telemetry Requirements for Load Resources providing Non-Spin David Kee CPS Energy Energy Supply & Market.
1 Generation Adequacy Task Force Report to TAC April 7, 2005.
ERCOT Update on PUCT Posting changes DEWG Meeting 11/27/07 Matt Mereness.
Loads Acting as a Resource Relationships with QSEs and LSEs
ERCOT Tool to manage unexpected incremental load November 16, 2006.
NSRS deployment April John Adams ROS – May 12, 2005.
Special WMS Meeting PRR 525 December 3, 2004 Austin Energy Proposal Leonard Stanfield.
Demand Side Working Group Load Resource Performance Subgroup April 9, 2010 Mary Anne Brelinsky EDF Trading North America.
1 Welcome to Load Participation Orientation Elev MenWomen Phones Info Presentation and other Load Participation information will be posted at:
Lead from the front Texas Nodal 1 Texas Nodal Load Frequency Control (LFC) EDS 3 Release 6 - Handbook EDS 3 Release 6 MP Planning.
1 Compliance Update May Control Performance Highlights  NERC CPS1 Performance Performance further declined in March  March performance comparison.
QSE Managers Working Group Meeting Notes 7 November, 2008 Report to WMS 19 November, 2008 David Detelich - Chairperson.
Grabbing Balancing Up Load (BUL) by the Horns December 2006.
1 Market Trials Open Market Participant Call Weekly Kick Off March 01, 2010.
1 WMS Report TO TAC January In Brief Two Working Group Reports Two Working Group Reports Two Task Force Reports Two Task Force Reports One PRR.
Congestion Management and Ramp Rate for Delivering Ancillary Services Resmi Surendran.
COPS – ERCOT PROJECTS UPDATE WHOLESALE MARKET DEVELOPMENT Paula Feuerbacher February 22, 2005.
Graph Trend Definitions Telemetered SCE: Sum of all QSE’s Telemetered SCE (uses “Left” scale). Regulation Deployed: Sum of all Regulation Ancillary Service.
Application of High Sustainable Limit With PRR 666/676 WMS November 15, 2006 Ino Gonzalez ERCOT Settlements.
Final Report Weather Sensitive Emergency Response Service (WS ERS) Pilot Project Carl Raish, ERCOT Technical Advisory Committee November 7, 2013.
Operational Issues & Risks ERCOT Operations Planning August 22, 2008.
Outstanding Issues & Action Items 1.Obligations to Honor Ancillary Services Commitments 2.Variable ERCOT Bias 3.Sign reversals of the Regulation Signal.
Operations Report Kent Saathoff System Operations ERCOT.
2003 State of the Market Report ERCOT Wholesale Electricity Markets.
Protocol Revision Subcommittee Report to ERCOT Technical Advisory Committee December 5, 2002.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Load Frequency Control (LFC) Business Requirements Energy.
14 Minute Ramp Period Testing Workshop June 30, 2009.
PRR525 SCE Method Comparison ERCOT Compliance December 3, 2004.
Overview of Governing Document for Weather-Sensitive ERS Pilot Project Stakeholder Workshop Mark Patterson, ERCOT Staff March 1, 2013.
DSWG Update to WMS 2/9/2011. EILS Procurement Results from 1/31 Business Hours 1 HE 0900 through 1300, Monday thru Friday except ERCOT Holidays; 425 hours.
Frequency Control Task Force Presentation to the ERCOT Technical Advisory Committee June 1, 2006.
1/07/2014 QMWG – RUC and AS update QMWG – ERCOT Update ERCOT Market Analysis.
Protocol Revision Subcommittee Report to ERCOT Technical Advisory Committee September 4, 2003.
Operations Update ERCOT Board Meeting March 18, 2003.
PDCWG Report to ROS January 13, 2011 Sydney Niemeyer.
Operations Update Kent Saathoff TAC Meeting March 6, 2003.
QSE Managers Working Group Meeting Notes 9 June, 2009 Report to WMS 17 June, 2009 David Detelich - Chairperson.
PRR 525 Update Prepared by ERCOT Compliance December 2005.
Real Time Balancing (RTB) & Resource Plan Statuses Change to the QSE practice of showing offline units as online and available ERCOT Presentation to ROS.
OOMC and Local RPRS Settlement Alignment January 2007 WMS Meeting Ino Gonzalez ERCOT Settlements.
07/27/2006 Overview of Replacement Reserve Procurement ERCOT Staff PRS RPRS Task Force.
1 TAC Report to the ERCOT Board July 18, TAC Summary 4 PRRs for approval (3 unanimous) 4 PRRs for approval (3 unanimous) 5 Nodal PRRs for approval.
Weather-Sensitive ERS Pilot Project Proposal March 7, 2013 TAC Meeting.
Alerts & Reserves. December, Objectives Maintain reliability –Ensure that adequate reserves are available Market Clearing Price of Energy is synchronized.
PRR619 Procedural History DSWG discussed the need to reduce market exposure to default should negative bids be selected and result in negative $/MW MCPC.
OOM During Alerts ERCOT TAC June 7, 2007 Dan Jones Potomac Economics.
Technical Advisory Committee Presentation to the ERCOT Board of Directors April 18, 2007.
ROS Presentation: Dynamic Scheduling and EEA Austin, TX September 10, 2009 Steve Isser Vice President and General Counsel Good Company Associates
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee June 05, 2008.
NSRS in Nodal Proposal for Deployment & Recall Procedures ERCOT ROS 10/12-13/2006 By: S.Niemeyer R.Jones R.Wheeler B.Green J.Dumas P.Breitzman.
Market Trials Open Market Participant Call
Protocol Revision Subcommittee
TAC Report to the ERCOT Board
TAC Report to the ERCOT Board
Current FRRS Language & Explanation of Posted Data
ERCOT Pilot Project for Fast Responding Regulation Service (FRRS)
Pilot Project Concept 30-Minute Emergency Response Service (ERS)
Pilot Project Concept 30-Minute Emergency Response Service (ERS)
Congestion Management and Ramp Rate for Delivering Ancillary Services
TAC Report to the ERCOT Board
ERCOT – Southern Cross Transmission ROS/WMS Working Group Assignments
PDCWG David Kee, Chair Sydney Niemeyer, Vice Chair
David Kee Chair CPS Energy Sydney Niemeyer Vice Chair NRG Energy
Paul Wattles, Sai Moorty ERCOT Market Design & Development
Review of Abnormal MCPEs
The New Texas Wholesale/Retail Market
Compliance Report to ERCOT TAC February 2007
Sandip Sharma ERCOT Manager, Operations Planning
Load Participation in SCED v1 Overview & Refresher
Presentation transcript:

Market Notice Regarding Off-line Units

What it Did Issued April 14, 2005 Requested to QSEs to cease showing off-line units as on line in their Resource Plans starting May 15, 2005 unless they met interim qualification test Provided reasons for request Established interim qualification test

Development History Presented to ROS February 10, 2005 Discussed at WMS February 28 and March 16, 2005 Discussed at QSE Project Managers Working Group Changes made to initial proposal based on comments received Market Notice sent out April 14, 2005 establishing interim qualification requirements PRR 588 approved unanimously by PRS on May 19, 2005 adopting unit qualification standard consistent with interim requirements

Goal Set qualifications for off-line units that can be shown on-line in Resource Plans (typically quick-start gas turbines) and thus eligible to provide Balancing Energy Qualification based on Balancing Energy dispatch requirements in Protocols: Deployment sent out by ERCOT 5-7 minutes before start of ramp (10-13 minutes before start of interval) Balancing Energy must be completely ramped in 10 minutes (5 minutes after start of interval)

Why Needed If off-line units are shown on-line in Resource Plan and bid into Balancing Energy, but can not respond fast enough to provide Balancing Energy according to Protocols: Regulation requirement is increased with risk of depletion, increasing exposure to frequency control problems, impact of unit trips and Responsive Reserve deployment QSE might provide Balancing out of it’s Responsive Reserve obligation to avoid SCE, making ERCOT deficient Incorrect unit status in Resource Plan affects procurement of Non-Spinning Reserve, OOMC, OOME now, and Replacement Reserve after Release 4

Results QSEs have complied with the request in the Market Notice and no longer show unqualified off-line units as on-line One QSE requested interim qualification test for 312 MW That QSE was qualified for 304 MW As much as 2,000 MW of off-line capacity was shown on-line in past. Unknown how much was bid into Balancing