China MM-Wave (CMMW) Study Group IEEE aj Sept Meeting Logistic

Slides:



Advertisements
Similar presentations
Doc.: IEEE /0443r0 SubmissionBruce Kraemer, MarvellSlide 1 +1 (321) Marvell Lane, Santa Clara, CA, Name Company Address Phone.
Advertisements

Report doc.: IEEE r1 May 2014 Jon Rosdahl, CSRSlide 1Jon Rosdahl, CSRSlide 1 Treasurer Report May 2014 Date: Authors: Ben Rolfe,
Doc.: IEEE /1349r0 Submission November 2008 Eldad Perahia (Intel)Slide 1 Dallas Liaison Report Date: Authors:
Doc.: IEEE /0398r0 Submission March 2012 Slide 1 Date: Authors: CWPAN Response to IEEE China MM-Wave (CMMW) Study Group.
Report doc.: IEEE r0 Ben Rolfe, BCA September 2015 Slide 1 Treasurer Report Sept 2015 Date: Authors: Jon Rosdahl, CSR-Qualcomm.
Doc.: IEEE /1212r3 Submission Jan 2015 Xiaoming Peng (I2R)Slide 1 Date: Authors: IEEE aj Task Group Sept 2012 Report.
Franklin Twp. Youth Soccer Online Registration Tutorial.
Doc.: IEEE /0887r0 Submission July 2012 Eldad Perahia, Xiaoming PengSlide 1 Date: Authors: China MM-Wave (CMMW) Study Group July 2012.
Doc.: IEEE /1474r0 Submission Nov 2013 Xiaoming PengSlide 1 Date: Authors: IEEE aj Task Group November 2013 Closing Report.
Doc.: IEEE /0027r0 Submission Jan 2014 Xiaoming PengSlide 1 Date: Authors: IEEE aj Task Group January 2014 Closing Report.
Doc.: IEEE /1200r0 Submission Sept 2012 Xiaoming Peng / I2RSlide 1 Date: Authors: IEEE aj Sept 2012 Closing Report.
Page 1 EEE 802 IEEE 802 November 2015 Plenary doc:802 EC-15/091r1 Report Executive Secretary Agenda Items November-2015-plenary Jon Rosdahl IEEE 802 Executive.
Doc.: IEEE /1212r2 Submission Sept 2014 Xiaoming PengSlide 1 Date: Authors: IEEE aj Task Group Meeting Schedule.
Doc.: IEEE /0956r1 Submission July 2014 Xiaoming PengSlide 1 Date: Authors: IEEE aj Task Group July 2014 Closing Report.
Report doc.: IEEE July 2012 Ben Rolfe (BCA), Jon Rosdahl (CSR)Slide 1 Treasurer Report Jully 2012 Date: Authors: Ben Rolfe.
Doc.: IEEE /0982r1 SubmissionBruce Kraemer, MarvellSlide 1 WG11 Plenary - Supplementary Information - September 2012 Date: Authors:
Step-By-Step: How to Register for a Controlled Course (paying by credit card) April
Michael D. McInnis The Boeing Company
China MM-Wave (CMMW) Study Group Comments on aj PAR & 5C
CWPAN Response to IEEE China MM-Wave (CMMW) Study Group
IEEE aj Task Group Meeting Schedule
China MM-Wave (CMMW) Study Group May 2012 Closing Report
CWPAN Response to IEEE China MM-Wave (CMMW) Study Group
TGad Process Overview Date: Authors: January 2009
Introduction of Online Payment System for I/B Demurrage
IEEE aj Process Overview
April 2007 doc.: IEEE /0570r0 July 2010 Response to ITU-R Liaison to IEEE on “Multiple Gigabit Wireless Systems in frequencies around 60 GHz”
TGad March 2010 Closing Report
TGad September 2010 Closing Report
Proposal for TGad Selection Procedure and Timeline
April 2007 doc.: IEEE /0570r0 July 2010 Response to ITU-R Liaison to IEEE on “Multiple Gigabit Wireless Systems in frequencies around 60 GHz”
CWPAN Opportunity - November 2011
VHT SG September 2008 Closing Report
China MM-Wave (CMMW) Study Group - Introduction of CMMW PAR and 5C
March Liaison Report Date: Authors: March 2008
Submission Title: [WG-Treasurer’s Report September 2010]
Reservation Guideline
How to Make YCMOU Online Fees Payment
CMMW Logistics Options- March 2012
Hawaii Liaison Report Date: Authors: September 2007
TGad September 2009 Closing Report
doc.: IEEE /xxxr0 Subir Das sdas at appcomsci dot com
VHT SG September 2007 Closing Report
Liaison statement from Wi-Fi Alliance on Non-OFDM Use Cases
Waikoloa Liaison Report
IEEE aj Process Overview
Investigation of PA Model Sample Rate for TGac
VHT SG July 2008 Closing Report
IEEE aj Process Overview
Backward Compatibility Feature for aj
TGad July 2010 Editor Report
China MM-Wave (CMMW) Study Group May 2012 Report
TGad May 2009 Closing Report
IEEE aj Task Group Nov 2012 Closing Report
IEEE aj Task Group Nov 2012 Closing Report
China MM-Wave (CMMW) Study Group March 2012 Closing Report
TGad Editor Report Date: Authors: May 2011 April 2007
Treasurer Report May 2012 Date: Authors: July 2012
VHT SG November 2008 Closing Report
Hotel Reservation Receipt
TGad March 2011 Closing Report
VHT SG January 2008 Closing Report
China MM-Wave (CMMW) Study Group March 2012 Report
Treasurer Report March 2014
TGad May 2011 Closing Report
China WPAN mmWave Liaison w/
TGad January 2009 Closing Report
Simulation Scenario Floor Plans
China MM-Wave (CMMW) Study Group July 2012 Report
Treasurer Report May Atlanta
Presentation transcript:

China MM-Wave (CMMW) Study Group IEEE 802.11aj Sept Meeting Logistic April 2007 doc.: IEEE 802.11-07/0570r0 July 2012 China MM-Wave (CMMW) Study Group IEEE 802.11aj Sept Meeting Logistic Date: 2011-07-18 Authors: Xiaoming Peng, Eldad Perahia Eldad Perahia, Intel Corporation

IEEE 802.11aj Sept Meeting Logistic July 2012 IEEE 802.11aj Sept Meeting Logistic Meeting: IEEE 802 Interim Meeting (The 1st 802.11aj TG meeting) Meeting Date: Sept 26-27, 2012 Meeting Venue: Beijing China Meeting Registration fee: US$250 Other logistics: Two tea break, lunch, Wi-Fi access Meeting Hotel: Hotel Nikko New Century Beijing http://www.newcenturyhotel.com.cn/ Hotel expense: <US$160/day Hotel Reservation info will be put in the IEEE 802 website once CESI confirms with the hotel Reservation can be done online w/o giving credit card information The payment of hotel and registration fee will be deduced upon your check in at hotel Event: Forum of Chinese Milli-meter Wave 2012 Jointly organized by CESI & IEEE 802 (pending confirmation) Event date: Sept 25, 2012 Xiaoming Peng, Eldad Perahia