EN-HE group meeting 29.03.2012.

Slides:



Advertisements
Similar presentations
Eric Montesinos LIU-SPS coordination meeting 23rd May 2014
Advertisements

Program Shift Update December 2009 CARE Egypt, Kosovo and Caucasus.
SPS 200 MHz RF Upgrade Eric Montesinos LIU-SPS coordination meeting 18 December 2013.
CMS and Atlas cranes characteristics In the framework of WP8 TAS/Q1 region Gilles Roche & B. Feral – EN-HE-HM 02/06/2015.
CERN Career Transition Measures for Staff members on LD contracts New programme implementation from 1 January 2015.
Collimation Remote Handling Highlights from work for collimation remote handling and remote survey. Plans Keith Kershaw EN-HE 14 June 2011.
Accelerating Science and Innovation. Science for Peace CERN was founded in 1954 as a Science for Peace Initiative by 12 European States Member States:
Interaction of ST & TIS in matters of safety Mandate & OrganisationMandate & Organisation InteractionsInteractions Basis for cooperationBasis for cooperation.
IEFC Workshop 2011 David Mcfarlane Superintendent for SPS EN/MEF/ABA 1.
LHC machine Schedule, coordination & WAT K. Foraz March 22 nd, 2011 IMWG - LHC machine1.
DTO Day – Report for EN Ofelia Capatina, DTO of EN Department.
Bidders’ conference IT-4123 Supply, Replacement and Repair of Crane Rails Introduction to CERN and rails consolidation program Handling Engineering Group.
Users’ Office News Doris Chromek-Burckhart Head of Users Office New Users’ Office Web Pages Release of Pre-Registration Tool in July 2014 Insurance for.
EN-GMS Group Meeting S. Prodon – CERN News (scientific matters) 1 st collisions at 13 TeV on 20 May Stable beam as from 3 June = start of.
- Hearing Session - Marion Picard - July 28 th, 2011 S TATUS OF H I R AD M AT S AFETY F ILE Outline  Safety file Descriptive part Hazard inventory  Demonstrative.
EHN1 Extension overhead crane coverage Keith Kershaw CERN EN-HE.
Organization, Projects and Activity Forecast 2012 Oliver Böttcher, 29 th of March 2012 EN-HE-HM Handling Maintenance Section at CERN.
Safety during LS1 EN-STI Group meeting 1st February 2013 AP.Bernardes EN/STI.
6th ST workshop, Thoiry, 1-3 April ST-HM Design Section Strategy and working methods 3rd April 2003 C. Bertone ST-HM.
1 Final Conference, 19th – 23rd January 2015 Geneva, Switzerland Puresafe contributions to telerobotics WP2 and WP3 results Manuel Ferre Universidad Politécnica.
Hélder Lourenço March 29,  Portuguese  Born & raised in Lisbon  31 years old (October 28th 1980)  Single, but committed About myself.
© Euresearch  Katja Wirth Bürgel  4 November 2009  European Research Council  1 Dr. Katja Wirth Bürgel  National Contact Point European.
RSSO refresher meeting J. Pedersen M. Tavlet, T. Otto.
Plan. 12/05/ Who are we? PM (Project Management and Resource Planning) – APT – IMPACT – PPTEU2 – Plan LS1 – 2012 –…–… Plan V2 – From LS1 to LS2.
Marc Tavlet - GLIMOS1 Paperwork needed to come and work at CERN 1. Access Rights – Registration 2. Tests with Beams 3. Safety Procedures to work at Point-2.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
LS1 – EN-HE Transport and Handling related issues 12 th June 2012 I. Rühl / EN-HE.
BIDDERS’ CONFERENCE IT-3976 Provision of Specialized EOT Crane Maintenance Services on the CERN Site May 5 th 2014 Handling Engineering Group2 Service.
Project Management and Quality Assurance Support Pierre Bonnal on the behalf of the members of the newly created EN-MEF-QOP section.
EN-HE Group meeting 19 th June 2015 I. Rühl / EN-HE.
GMS (General Management & Secretariat) Group Meeting 10-jan-12.
Last but not least : LS2 General Safety 1 Thomas Otto, LS2 Safety Coordinator for LHC Ana-Paula Bernardes, LS2 Safety Coordinator for Injectors.
Damien Lafarge on behalf of MMP Engineering Department Work Organization, Maintenance Planning and Maintenance Experience session Pierre Bonnal Christophe.
L. Serin CNRS/IN2P3 AIDA Second Annual Meeting 1 Deliverables M1 - M128 M13-M246 M25-M367 M37-M4833 Y1 : All achieved, a few ones with 6 months delay Y2.
BUDGET 2012 EN-HE 29/03/ EN-HE CONTRACT LIST - OPERATION7’190 KCHF - PROJECT1’738 KCHF - CONSOLIDATION 4’239 KCHF JMS.
SAFETY SERVICES PROVISION I. Bejar Alonso. Transfer Executive Safety Tasks from SC to Departments In application of the document “Safety policy at CERN”
BIDDERS’ CONFERENCE IT-3981 Dismantling, Refurbishment, Replacement and Supply of Electrical Overhead Travelling Cranes Over 10 Tons Capacity January.
BIDDERS’ CONFERENCE IT-3976 Provision of Specialized EOT Crane Maintenance Services on the CERN Site May 5 th 2014 Handling Engineering Group2 Introduction.
CTM new programme implementation Learning & Development CERN.
BIDDERS’ CONFERENCE IT-3972 Provision of Maintenance Services on the Industrial Trucks at CERN April 24th 2014 Handling Engineering Group2 Introduction.
1 st of April st LS2C LS2 Committee Mandate and Organization 2 Chairman:Jose Miguel JIMENEZ Deputy:Jean-Philippe.
Logo area Handling Engineering Requirements EN-HE Group Bruno Feral – EN/HE EDMS HL-LHC CE Consultant Kick-Off Meeting – 31/05/2016.
LS2 Safety Preparation Thomas Otto, LS2 Safety Support Officer for LHC
Cryogenic safety organisation at CERN
Train for RP survey and visual inspection in LHC Workshop on "Remote manipulations / diagnostics in radioactive areas and handling of radioactive material"
Being TSO at CERN Safety at CERN Being TSO at CERN Safety at CERN.
Health and Safety Self Assurance Toolkit 2017
Some arrangements for personnel safety 1- Procedures for access
Asset & Maintenance EN-HE group
EN-Handling Engineering Group
How far have we come? The implementation of the 2008
Accelerator Operations Department Readiness (Part 2)
EN-GMS Group Meeting S. Prodon –
Forecasts for waste and radioactive material storage
Safety in Construction and Upgrade Phases
EN-HE Group meeting 4th December 2015
CATIA Design Requirements applied to Handling & Transport at CERN 26th CATIA Forum Jean-Louis GRENARD on Behalf of EN-HE design office 18-May-2017.
10 Years Gentner Programme
EN-HE SPS works during EYETS
CERN Recruitment Policy
EN-HE L2 – PS – PSB – TT2 works during YETS
IT-4328: Technical Specification
Session 45: ITS Integrator Roadmap for HR and Payroll Systems
Infor EAM in the Handling Engineering Group at CERN
Technical Working Group meeting 21 March 2012 Brussels
EN-HE SPS during LS2 J-L GRENARD on behalf of EN-HE 23/1/2019.
Review of CERN Fire and Rescue Service 1st June 2018
ESHAC #8 Safety Readiness Review Thomas Hansson, ESH
Powering and Safety day Underground access during powering tests
Work and Service Supervisor
Presentation transcript:

EN-HE group meeting 29.03.2012

Agenda New group structure I. Rühl New roles K. Kershaw special projects I. Rühl JM. Soudan group administrator / budget I. Rühl General topics and objectives I. Rühl New recruitments H. Lourenco P. Vallet Section reports AW J. Sakkinen HH C. Bertone HM O. Boettcher HT B. Feral LM A. Calderone La réunion sera suivie d’un pot dans l’atelier 7/R-001

HE - Handling Engineering Group Leader: Ingo Rühl Deputy: Keith Kershaw Secretariat: Françoise Girard-Madoux (50%) Assistance Works (HE-AW) Antonio FORESTE Handling Maintenance (HE-HM) Oliver BOTTCHER Lift Maintenance (HE-LM) Antonino CALDERONE Heavy Handling (HE-HH) Caterina BERTONE Handling Technologies (HE-HT) Bruno FERAL SAKKINEN Juha VINCENT Patrick CHEVALLEY Jean Maurice CORNU Chloe (ADMI) GRANCHELLI Jean-Pierre LAFARGE Damien ROCHE Gilles SOUDAN Jean-Marc VELEZ LOURENCO Helder Miguel LAPPE Jean-Pierre PEREZ Nicolas BERNARD Yves BRUN Richard BRUNERO Pascal Philippe DUGUE Eric FUMEY Sylvain MAZZARINO Thierry PELLETIER Serge SERAPHIN Yann Denis Robert VALLET Patrick DE MAN Sven FABRY Thomas (FELL) FENIET Thierry GRENARD Jean-Louis HAZELAAR-BAL Cathelijne NATTANMAI PARASURAMAN Ramviyas (FELL)  

New group structure B. Feral was appointed ‘Handling Technologies’ section leader as of 01.01.2012 K. Kershaw was appointed ‘special project manager’ as of 01.01.2012 JM. Soudan was appointed as group administrator as of 01.01.2012 C. Bertone will be the new deputy group leader as of 01.04.2012 Thanks to K. Kershaw for his loyal support over the last years in his function as deputy group leader I. Rühl assisted by H. Lourenco assumes the section leader role ‘ad interim’ of the ‘Handling Maintenance’ section since 15.03.2012 O. Böttcher is in charge of the entire EN-HE equipment consolidation program as from 01.04.2012 New recruitments

Thomas Fabry EN-HE-HT - Fellow Ramviyas Parasuraman EN-HE-HT - Fellow Chloe Cornu EN-HE-HM – Adm. St. Patrick Vallet EN-HE-HH - Staff Helder Velez Lourenco EN-HE-HH - Staff

HE - Handling Engineering Group Leader: Ingo Rühl Deputy: Caterina Bertone Administrator: Jean-Marc Soudan Special Projects: Keith Kershaw Secretariat: Françoise Girard-Madoux (50%) Assistance Works (HE-AW) Antonio FORESTE Handling Maintenance (HE-HM) Ingo RüHL Lift Maintenance (HE-LM) Antonino CALDERONE Heavy Handling (HE-HH) Caterina BERTONE Handling Technologies (HE-HT) Bruno FERAL SAKKINEN Juha VINCENT Patrick BOETTCHER Oliver CHEVALLEY Jean Maurice CORNU Chloe (ADMI) GRANCHELLI Jean-Pierre LAFARGE Damien ROCHE Gilles VELEZ LOURENCO Helder LAPPE Jean-Pierre PEREZ Nicolas BERNARD Yves BRUN Richard BRUNERO Pascal Philippe DUGUE Eric FUMEY Sylvain MAZZARINO Thierry PELLETIER Serge SERAPHIN Yann VALLET Patrick DE MAN Sven FABRY Thomas (FELL) FENIET Thierry GRENARD Jean-Louis HAZELAAR-BAL Cathelijne NATTANMAI PARASURAMAN Ramviyas (FELL)  

K. Kershaw – Special Projects Putting in place the new EDMS structure; EDMS advisor and quality manager PURESAFE supervisor EN representative for PEERS committee Member of EN MARS panel CMS, Cessy link person for EN LC studies (ILC, CLIC) Project leader for AGV ISOLDE ‘target chamber <-> hot cell’

PURESAFE Prevention hUman intervention for incREased Safety in inFrastructure Emitting ionizing radiation RP 6 Generic mobile platform developments for radiation survey and inspection. Early Stage Researcher (ESR) : Ramviyas Nattanmai Parasuraman, Supervisor K Kershaw. RP 13 Augmented reality and data fusion for 3D radiation mapping. Early Stage Researcher (ESR) : Thomas Fabry, Supervisor B Feral.

EN-HE-HM Section Leader: I. Rühl assisted by H. Lourenco 166012 Contact person(s) for all maintenance requests on cranes and hoists Gilles Roche 164084 CM B1330; B1331 Damien Lafarge 168786 CM E097 Jean-Pierre Granchelli 160251 CM B1304 Contact person(s) for all maintenance requests on forklifts, tractors etc. Jean-Maurice Chevalley 162980 CM E098 Contact person for follow up of consolidation projects and all ‘new’ consolidation requests for cranes and hoists Oliver Böttcher 160011

CERN staff contracts Limited Duration Contracts  Indefinite Contract Long term function/need; LD/IC ratio 30/70% respected; Qualified candidate; Selection Board CERN staff number limited to 2’250 Agreement by member states to increase by 150 staff for project oriented activities that are limited in time (max. 5 years) Limited Duration Flexibility Contracts ≠ Indefinite Contract

MARS, CERN Competency Model, … ………

Likes … Overall good result and feedback regarding Safety records Equipment availability Transport and handling operations Work achievements The main objectives were achieved but not without difficulties…

Don’t likes … EDH leave requests when the supervisor (section leader) is away – EDH routing via group leader ‘Block’ EDH documents when you are not ready to sign them before they are forwarded for signature to your supervisor YOUR behavior influences the work ambiance

Technical Infrastructure Workshop 11/12.06.2012 Review of LS1 projects Equipment readiness for LS1 Organization readiness for LS 1 Consolidation projects LS2, LS3

Technical Infrastructure Workshop 11/12. 06 Technical Infrastructure Workshop 11/12.06.2012 – EN-HE presentations (tbc) HM31 equipment status and maintenance organisation for LS1 D. Lafarge HM31 consolidation projects/efforts O. Böttcher HM32 equipment status and maintenance organization for LS1 H. Lourenco HM32 consolidation projects/efforts JM. Chevalley Handling challenges during LS1 S. Pelletier Transport & handling organization for LS1 C. Bertone Remote handling projects B. Feral LS2; LS3; LIU C. Bertone; I. Rühl

LS1 & LIU Caterina Bertone is in EN-HE link person for LS1 and LIU During December 2012 and February 2013 leave will only be granted in exceptional circumstances

Likes … Overall good result and feedback regarding Safety records Equipment availability Transport and handling operations Work achievements The main objectives were achieved but not without difficulties…

MERCI RV au bâtiment 7 pour un petit ‘Pot’ Et comme toujours … A consommer avec modération SVP!!!