EA Renovation –EATM– Project status

Slides:



Advertisements
Similar presentations
Daniel Schoerling TE-MSC-MNC 1 Review of AD-ELENA TL dipole Daniel Schoerling on behalf of WP 2.2 ELENA IIC meeting 27 th February 2014.
Advertisements

1 FUTURE EXPLOITATION OF THE EAST AREA Infrastructure and Equipment - Civil Engineering issues. Jonathan Carr – GS / SE.
Christophe Delamare EDMS Accelerator Consolidation Workshop GS/ASE activities.
Consolidation of access systems for the injector Complex ATOP days 4-6 March 2009 P. Ninin & R, Nunes in behalf of the PS and SPS access project teams…
WP2 Superbeam Work Breakdown Structure Version 2 Chris Densham (after Marco Zito version 1 )
GIF in EHN1- layout, construction and schedule Adrian Fabich, EN-MEF-LE GIF users meeting, 12 th February 2014.
9 th AWAKE Technical Board 11 March Actions from Last Technical Board WP laser and MPP: decide until March 2015 which compressor design will be.
East Area, M2, K12 Lau Gatignon / EN-MEF, EATM
Radiation Protection aspects for SHIP Doris Forkel-Wirth, Stefan Roesler, Helmut Vincke, Heinz Vincke CERN Radiation Protection Group 1 st SHIP workshop,
EAR2 Beam Line Report on the Status C. Weiss EAR2 Beam Line - Report on the Status1.
Risk Analysis P. Cennini AB-ATB on behalf of the n_TOF Team  Procedure  Documents in preparation  Conclusions Second n_TOF External Panel Review, CERN,
EUROnu Costing Workshop May 2011 Beta-Beam Costing Exercise Elena Wildner, CERN 25/05/11 1 EUROnu Costing Workshop, CERN May 2011.
Extraction and beamline progress B.Goddard TE/ABT.
Horst Breuker Review Oct ELENA Safety and Radio Protection ELENA TDR : Chapter 6; Safety Files in preparation; Descriptive, Demonstrative (Risk.
Horst Breuker ADUC Jan Safety and Radio Protection, Consequences for the Experiments ELENA TDR : Chapter 6; Safety Files in preparation; Descriptive,
Radiation Protection studies for the Linac4 / Linac2 interface Joachim Vollaire, DGS-RP 28/09/2015 Linac4 Coordination Meeting.
PS-EA Update RadWG August 23 rd 2012 Radiation 2 Electronics (R2E) LHC Activities RadWG August 23 rd 2012 PS East Area Update M. Brugger on behalf of the.
Proton-Driven Plasma Wakefield Acceleration CERN Project Structure Edda Gschwendtner, CERN Lisbon Meeting, 22 June 2012Edda Gschwendtner, CERN2.
SECONDARY BEAM HANDLING AND INFRASTRUCTURE DESIGN STATUS BRUNO FERAL (CERN/EN) DIAMANTO SMARGIANAKI (CERN/EN) Project Leader: I.Efthymiopoulos (Cern/EN)
Rad. Shield 2 Feb. 06D.LACARRERE1 IP8 POINT 8 – RADIATION SHIELD – UX85 Introduction  History (in brief)  Conceptual Design  Why installation shifted.
Update on the PSB Cooling and Ventilation Systems
East Hall under construction
LIU and TE/VSC activities Status September 2016 LIU-SPS aC coating & flange impedance reduction Paul Cruikshank on behalf of TE-VSC LIU & TE-VSC, 19/9/2016.
NA CONSOLIDATION & SAFETY SYSTEMS
Linac4-PSB 160 MeV connection readiness review
SR1 extension follow up 27-Mar-17 Marco Ciapetti.
PERSONAL SAFETY INTERLOCKS External EHS Expert Panel Workshop
East Area Renovation Project Team meeting # 2 – EDMS News
Update on the Critical Path of the PS Booster Schedule for the EYETS
PSB Lock Out Test, Follow-Up AP. Bernardes-/EN-STI, K
Identification of the unused cables
TAXS and TAXN ABSORBERS - OVERVIEW
BE-ICS Activities during the LS2 Period (15 min)
TE-MSC activities in SPS during LS2
Francois and Lau EATM 17 July 2012
East Hall under construction
EYETS LHC 2016/2017 Works EN/EL/CF
LIU – EVM status and next steps
Configuration Management and Layout Database ELENA Project
East Area Renovation Project team #6 Launch safety agreement
n_TOF “Draft” plans for YETS and LS2
LV Safe Powering from UPS to Clients
Accelerator and Experiment Interface Session: LS2, LS3
PSB/PS/TT2/Linac2-3 YETS 2017–2018 & LS2 preparation meeting
SPS Planning for the EYETS Meeting 8 (07/12/2016)
SPS Planning for the EYETS Meeting 9 (14/12/2016)
RWTCS Steering Commitee
NA CONSOLIDATION & SAFETY SYSTEMS
N-TOF EAR2 - Vertical beam design & construction - Irradiation facility proposal S. Girod EN-EA.
SPS activities during LS2 TE-EPC (Power Converter Group)
East Hall under construction
East Hall renovation East Hall Renovation : Civil Engineering works
EN-HE L2 – PS – PSB – TT2 works during YETS
East Hall under construction
East Hall under construction
GIS Portal Racks Project
TEST PLANS for HL LHC IT STRING
Collimator Control (SEUs & R2E Outlook)
Operations, Risks & Hazards
Experimental Areas – LS2 planning
ESHAC #8 Safety Readiness Review Thomas Hansson, ESH
Access Control for CERN Experimental Areas
East Hall under construction
East Area Renovation Supply of control rooms b.157
East Hall under construction
Safety in the East Area Renovation Project
East Hall under construction
Open Points and More… Giulia / Michael / Sebastien / Maria.
EA Renovation Project – Project Team 29 – 28 June 2019 NEWS
eSPS 2nd CDR meeting – 17th June 2019
Presentation transcript:

EA Renovation –EATM– 15.08.2017 Project status East Hall under construction - 1962 EA Renovation –EATM– 15.08.2017 Project status S. Evrard – EN-EA, on behalf of the Project Team

AGENDA PLAN Civil Engineering: IT preparation RP Assessment for the Civil Engineering Works Risk Analysis Schedule Upgrade of EN-EA equipment Primary dump for T9-T10-T11 S.Evrard, 18-08-2017 EATM

PLAN: overview DASHBOARD EDMS 1739802 12.06.2017 PLAN TOOL Level 1   Level 1 Responsible Group Plan ID EAR 1 Management S. Evrard, M. Lazzaroni EN-EA 11254 EAR 2 Magnets R. Lopez TE-MSC 11255 & 11256 EAR 3 Power Converters K. Papastergiou TE-EPC 11461 EAR 4 Beam instrumentation J. Tan BE-BI 11259 EAR 5 Beam Intercepting Devices M. Calviani EN-STI 11182 & 10026 & 10009 & 10008 & 10007 EAR 6 Vacuum System V. de Jesus 11277 EAR 7 Networks L. Borakiewicz IT-CS 11343 EAR 8 Controls M. Gourber-Pace BE-CO 11274 EAR 9 Electrical Systems S. Bertolasi EN-EL 11260 & 11261 & 11262 EAR 10 Cooling and Ventilation M. Battistin EN-CV 11446 EAR 11 Installation, Transport and handling C. Bertone EN-HE 11447 EAR 12 Civil Engineering S. Mcilwraith SMB-SE 11455 EAR 13 Radiation Protection R. Froeschl HSE-RP 11278 + Included in other plan activity for general RP EAR 14 Machine Interlocks R. Mompo TE-MPE 10812 EAR 15 Alarms S. Grau BE-ICS 10771 & 10745 EAR 16 Personnel Protection System E. Sanchez-Corral Mena 11286, 11287, 11288 EAR 17 Survey D. Missiaen EN-ACE 11279 EAR 18 Commissioning and Operation S. Evrard 11280 EAR 19 Safety E. Harrouch EAR 20 Shielding M. Lazzaroni EAR 21 Collimation A. Ebn Rhamoun 10814 & 10011 EAR 22 Gaz D. Jaillet 11448 EAR 23 Exp. Areas & Layout change 11454 EAR 24 Dismantling 11252 & 11253 S.Evrard, 18-08-2017 EATM

PLAN: overview S.Evrard, 18-08-2017 EATM

B157 Renovation on Meyrin Site Location – Meyrin Site (Swiss side) Internal client : EN/EA 47m B157 113m «Afin d’améliorer les conditions de travail dans ce bâtiment, son enveloppe sera rénovée (façades et toiture). En effet, d’importantes pertes de chaleur sont causées par la mauvaise isolation thermique de ses façades et du toit. De plus, certains des constituants de l’enveloppe contiennent de l’amiante et devront être déposés et traités de manière adéquate. C. Gasnier & S. Mcilwraith B157 renovation – SMB Strategic Review – EDMS: 1831287

1. Technical description – Work zone 1 Glazing to replace 250m2 Roof / ceiling panels to remove 4600m2 Suspended scaffolding (~5000 m2) C. Gasnier & S. Mcilwraith B157 renovation – SMB Strategic Review – EDMS: 1831287

1. Technical description – Work zone 2 Fibre-cement cladding to be replaced (1200 m2) Glazing to replace(1250 m2) C. Gasnier & S. Mcilwraith B157 renovation – SMB Strategic Review – EDMS: 1831287

1. Technical description - CE Baseline 3 technical issues with roof / ceiling: 1) Ceiling contains asbestos – danger to safety 2) Ceiling / roof are almost uninsulated – loss of energy 3) Roof is not waterproof* – rain penetrates interior Option Asbestos Insulation Waterproofing* 1) New false ceiling below existing - (Impossible to pierce existing asbestos-containing material) + = 2) Replace false ceiling 3) Remove false ceiling / replace roof Beyond the 3 above criteria, option 3 has the following advantages / disadvantages: - 1 intervention to ensure next life cycle of roof (building is 55y old) - 1 intervention of complex site installations - 1 period of co-activity with physics - Waterproofing of the building to be ensured during works  Methodology to be detailed by bidders C. Gasnier & S. Mcilwraith B157 renovation – SMB Strategic Review – EDMS: 1831287

1. Technical description Envelope composition (Architects preliminary design – June 2017) -Safety guardrail -Sandwich panels on roof (removal of old steel roof) Thickness : 120 mm U=0.20 W/(m2.K) Good thermal insulation -Polycarbonate panels on upper part: U=1.20 W/(m2.K) Translucent or transparent Light material (no modification of the structure necessary) -Sandwich panels on facades: Thickness : 100 mm U=0.23 W/(m2.K) -New glazings on lower part (North façade) and upper part: Double glazings C. Gasnier & S. Mcilwraith B157 renovation – SMB Strategic Review – EDMS: 1831287

1. Technical description Envelope composition (Architects preliminary design – June 2017) C. Gasnier & S. Mcilwraith B157 renovation – SMB Strategic Review – EDMS: 1831287

B157 renovation – SMB Strategic Review – EDMS: 1831287 4. Planning Critical path until FC ! Worksite starts on Nov. 1st C. Gasnier & S. Mcilwraith B157 renovation – SMB Strategic Review – EDMS: 1831287

Civil Engineering Works – Removal of Waste SMB has provided waste estimates needed Zoning concept has been defined and sent to the Swiss Radiation Protection authority (OFSP) OFSP has accepted our proposal of the zoning concept An in-situ measurement and sampling campaign has already been launched to validate the proposed zoning layout as agreed with OFSP The RP requirement based on the zoning concept will now be included in the Invitation to Tender Dosimetry for radiation workers Control measurements on the work-site Waste conditioning requirements R. Froeschl Status Update - RP Assessment – EDMS 1830507 21/07/2017

Project Safety Risk Analysis Schedule EDMS#1808030 Flammable gas - ATEX zones Meeting with D. Jaillet – 5/09/2017 Capacitors Meeting with F. Boattini and K. Papastergiou – 8/09/2017 Shielding Blocks calculation note Meeting with M. Lazzaroni – 12/09/2017 Airborne activation - Ventilation system, P&ID Meeting with M. Battistin and R. Froeschl – 25/09/2017 APR Meeting with E. Sanchez, R. Froeschl, F. Pirotte, D. Chapuis, M. Battistin - 05/10/2017 S. Cherault

Upgrade EA Equipment Collimator Converter & absorber Cerenkov counter Collimator 2 jaws installed New equipment Control Collimator 4 jaws LS2 Specification New control Cerenkov counter Function On operating, East Area Upgrade, LS2 A. Ebn Rahmoun A. Ebn Rahmoun, 21-07-2017

Integration Collimator Cerenkov Converter D. Brethoux & A. Ebn Rahmoun Project Team #6

East Area Renovation – Preliminary design for primary dump T9/T10/T10 Primary protons need to be dumped after hitting target T9/T10 Secondary beams are derived at an angle Primary protons need to be dumped after production target Dump has two functions Dump primary protons Provide passage for secondaries 3rd MCB 2nd MCB 1st MCB Targets Q74 T11 T10 T9 Primary dump Maarten van Dijk M. van Dijk, 21-07.2017 East Area Renovation – Preliminary design for primary dump T9/T10/T10

East Area Renovation - Beam line layout Initial layout Dump front view Initial layout 3m high, 3.20m wide Varying thickness of iron Vacuum tubes T9/T10/T11 Ø159mm Primary beam dumped directly below T9/T10 T11 T10 T9 Primary beam height = 1260 mm Angle = 0° 784 mm 609 mm Damien Brethoux 20cm 100cm 240cm Maarten van Dijk J.Bernhard, 28.04.2017 East Area Renovation - Beam line layout

East Area Renovation – Preliminary design for primary dump T9/T10/T10 Adapted design – v3 Horizontal slice – beam T10 Pushed T11/QFO2 about 36cm upstream to allow more iron Iron thickness: T11 120cm T9 / T10 240cm Corner at T11 has most significant problems Will be blocked by a magnet Need to check what impact would be XZ – beam at T10 Maarten van Dijk M. van Dijk, 21-07.2017 East Area Renovation – Preliminary design for primary dump T9/T10/T10

Primary beam dump for T9/T10/T11 Several iterations of design for primary beam dump for T9/T10/T11 Improvement over initial design Preliminary adapted design Made of standard sized iron blocks Holes for secondary beam now 80mm Ø Holes for primaries T9 / T10 beam are 10cm Ø, length: 20cm air, 20cm Al, 50cm W Significant punchthrough at corner of T11 Need to assess impact Will iterate design further with input from RP (Robert Froeschl) Include magnet T11/QFO2 Maarten van Dijk M. van Dijk, 21-07.2017 East Area Renovation – Preliminary design for primary dump T9/T10/T10

Thanks for your attention !