DOM integration meeting

Slides:



Advertisements
Similar presentations
CDR Feb 2006Mar 2008Dec 2009 Mar Design Study Preparatory Phase TDR tendering construction data taking governance legal entity pre-production.
Advertisements

WP F/L Development of the Dom support and rope- and cable management for KM3-Net. KM3Net General meeting 2012 Catania - Edward Berbee - Nikhef Edward Berbee.
Rope & Cable management A vertical electro-optical backbone cable for KM3NeT Gertjan Mul On behalf of the km3net collaboration Nikhef.
Pursuit of Better testing Instrument Let's go in the grandway......
How do you locate your coordinates? How do you document the location? How do you map of the area so that the information is useful to you and others? Set.
Teacher/Mentor Institute Hands-On Session: Building a Robot Scott McEwen Chuck Powell.
How do you locate your coordinates? How do you document the location? How do you map of the area so that the information is useful to you and others? Set.
Andy Blue Glasgow Update. Andy Blue WP3 Meeting Summary ESD Protection –Part all arrived and installed Compressed Air Controls –New lines and panel being.
M. Circella, Technical and Planning issues, KM3NeT SC meeting, 29 July In this talk Preparation of mass construction (including DOM and DU integration)
Calibration Methods and Tools for KM3NeT V. Kulikovskiy on behalf of the KM3NeT collaboration.
Google Drive. How can YOU engage teachers in a workshop? Play Google Drive Jeopardy!
J. Vandenbroucke N. Bramall, M.D’Agostino, A. Morey, P. Sandstrom, M.Solarz, I.Taboada Calibration of the Standard Candle: How Standard Is It? IceCube.
Catania Integration site 5/11/15 Integration meeting 5 Nov 2015 Latest activities in Catania site 1.
Dealing with Data Conference 26 th August Capturing Datasets….. is only the half of it!
LIU-PSB Configuration Management EDMS Documentation, Layout and ECRs Thomas Birtwistle EN-MEF-DC.
DOM INTEGRATION MEETING DAAN VAN EIJK 1 OCTOBER 2015.
DOM INTEGRATION MEETING DAAN VAN EIJK 28 JANUARY 2016.
January 28-30, 2014KM3NeT, Electronics Workshop A‘dam Peter Jansweijer Nikhef Amsterdam Electronics- Technology KM3NeT CLBv2 1.
Your HTML website creating your first html file. Creating an HTML FIle Open note pad from accessories, programs. Write code. Save and view. In 3 Steps.
Design a School/Class Google Website Eilis Stokes.
STATUS AND PHYSICS GOALS OF KM3NET Paolo Piattelli P. Piattelli, ICHEP14 Valencia INFN – LNS, Catania (Italy)
J-W Schmelling Nikhef Amsterdam Electronics- Technology of January PPM-DU optics for KM3NeT Collaboration meeting Marseille PPM-DU: A three.
R. Kluit Nikhef Amsterdam ET Nikhef Electronics Technology TGL Ruud Kluit 118-Apr-16.
Agenda Mededelingen PMT – Measurements of Hamamatsu PMTs, Erwin – New persons Dorothea – Test area, euipment, etc. VEOC/String – debriefing meeting at.
WP F/L Dom production. KM3Net meeting 2012 Erlangen - Edward Berbee - Nikhef22/06/20121.
DOM assembly KM3NeT collaboration meeting Assembly Edward Berbee The cooling mushroom is put in place with tooling, a minimum amount of.
VEOC for the String DU Objectives Design Properties Trends Break out Box Penetrator Production Cost review Status Vertical Electric Optical Cable /eh.
Agenda Mededelingen – equipment for rope stretch test arrived – ropes SK78 40 m for tests arrived – rope DM20 offer asked (6 x 1 km) (1 euro / m, deliverty.
LIU Configuration Management EDMS Documentation, Layout and ECRs This presentation follows the LIU-PSB specific presentation done on 9 th October 2014.
DOM developments Mini DOM PPM-DOM in Antares PPM future WP F-L.
Organizing future KM3NeT production 06-July-2010.
The PPM project. The PPM PPM-DOM in Antares (already presented) Tests of the Vertical Electro-Optical cable Deployment of a small scale production model.
Progress on resistor failure diagnosis Ben J ( + Matt, Zander)
Recommended Versions This template is optimized for MS Office 2016 or later, including Office365, for either the Mac or PC. Many features will still work.
DOM & DU tendering and assembly
DOM Integration Meeting D. Vivolo - DOM Integration Meeting
Status Optical System KM3NeT
QA/QC VIDYO meeting nd QAQC Vidyo Meeting,
Control System and Automatic Sequences
DOM acceptance and calibration
On behalf of Patrick Lamare
KM3Net General meeting 2012 Catania - Edward Berbee - Nikhef
Concluding remarks E. Migneco
DOM integration meeting
White Rabbit in KM3NeT Mieke Bouwhuis NIKHEF 9th White Rabbit Workshop
Project Initiation & Planning
Naples KM3NeT DOM Integration site D. Vivolo INFN Section of Naples.
Els de Wolf 20 February 2012, Catania
Preparatory Measurement
DOM integration meeting
T1 Electronic status Conclusions Electronics Cards:
DOM Integration Meeting D. Vivolo - DOM Integration Meeting
Gary Hughes, South Oakleigh College
EMU Slice Test Run Plan a working document.
PPM-DOM. SPM DOM LCM SS-part ILxx
DOM integration meeting
Releases and developments
Bari, Giorgos Androulakis
العدد تذكيره وتأنيثه مقدمة
Module 2: Understanding Local Area Networks
Making Career Decisions
Software Quality Engineering
ATL-IC-ES new version available - approval starts
James Blankenship March , 2018
My Learning Plan End User training
Q1 External environment
How to Submit Google Docs to the Homework Drop Box
719 ½”-2”.
Submitting and Accessing 5-year Post-Tenure Review Materials in Vibe
Presentation transcript:

DOM integration meeting September 13 2016 Daan van Eijk

(personal) News… From March 2017 onwards, I’ll be working as a postdoctoral fellow for the UW Madison in the U.S.A. Inspired by my personal wish to live and work in the U.S. for some years, hence my choice for the IceCube Collaboration Position of KM3NeT DOM integration coordinator is thus vacant!

actions from previous meeting Status of retuned HV on 6 PMTs in DOM67 Daniele will ask Cristiano. News? DOM Integration review: Dedicated presentation White gas: http://www.eurol.com/it/115-products/1705-eurol-kookpuntbenzine-100-140.html http://www.eurol.com/nl/2-producten/210-eurol-kookpuntbenzine-100-140.html http://www.eurol.com/de/113-products/1703-eurol-kookpuntbenzine-100-140.html Then always clean the white gas remnants with the usual isopropylalcohol (it’s all written in the procedure…)

Important points from last meeting Penetrator fiber trays: Please return the new (blue) penetrator fiber trays to Nikhef after the DOMs are spliced to the VEOC DOM registration software: Version 1.7 available: http://svn.km3net.de/integration/DOM_Integration_Software/ DOM testing: To analyse the optical data from a DOM test (i.e. the root files), everyone should use http://svn.km3net.de/data_analysis/MRunAnalyzer/ Google Drive: all documents related to DOM integration are now in: DET/INT/DOMINT (There is also DET/INT/DUINT) Elog: weekly reports, please!

DOM components Red if more than (30 -6) x 18= 432

DOM production status: line types Amsterdam: Built: ORCA-DU2 (A-type), ARCA-DU1 (A-type), ARCA-DU2 (B-type) Finished 18 A-type DOMs for ORCA-DU1 Building C-type DOMs (128-145) and in parallel B-type DOMs (165-182) Catania: Finished 18 C-type DOMs for ARCA-DUx Building D-type (201-218) Naples: Finished 18 D-type DOMs for ARCA-DU3 Building C-type (183-200) Erlangen: Building B-type (73-90) Type A: CH56C-CH22C Type B: CH55H-CH21H Type C: CH55C-CH21C Type D: CH54H-CH20H

DOM production PLanning I want to understand if you think you can still make this?

Open issues Status Catania DOMs with gel issues -> K40 coincidence results? REX opening ARCA-DU3 DOMs: Wrong FW/SW of golden image Small misalignment upper and lower hemisphere Conical spring washer wrong way around Routing of nano beacon cable -> will add to procedure Coolpaste instead of pads/wrong pads Gel remnants between hemispheres (white gas!) REX Nikhef: Small amount of alcohol on vacuum valve O-rings to prevent screwing damage -> will add to procedure

Grounding cable DOM159 before DOM107 after DOM159 after DOM107 before Check by measuring resistance between 12V ground and penetrator body, should be 10 MOhm! Please check all your grounding cables in open DOMs and fix if needed! Please check all your grounding cables in closed DOMs and report number of affected DOMs Will take a decision on those later And: please stop closing DOMs, pending a discussion in the SC regarding the DOM grounding scheme itself

Ncr/dcr

Backup

Summary DOM tests per du/18 DOMs DU2 = ARCA-DU1: http://elog.km3net.de/DOM+Integration/184 DU3 = ARCA-DU2: http://elog.km3net.de/DOM+Integration/185 DU4 = ARCA-DU3: http://elog.km3net.de/DOM+Integration/205 Catania : http://elog.km3net.de/DOM+Integration/225