DOM integration meeting

Slides:



Advertisements
Similar presentations
From the Box to Packing in 30 minutes Pack-in-a-Box components Remove components and assemble bracket as shown Follow the instructions to pack your first.
Advertisements

Michael Long– Eagle Project - Exhibit D-1 Plans/Drawings – Top View
AnaSonde Assembly. What is the AnaSonde? *Reads temperature, pressure, and humidity data from the atmosphere *After it is sent into the atmosphere, it.
Inspecting your harness. This may save your life..
Manchester 09/sept/2008A.Falou & P.Cornebise {LAL-Orsay}1 CALICE Meeting/ Manchester Sept 2008 SLAB Integration & Thermal Measurements.
RockOn! Canister Integration RockOn! 2009.
Metering Pump Spare Parts Replacement. Pump Components (Metering Pump) Pumps are supplied with a 120VAC or 240VAC power cord. Use care to ensure pump.
RL brake caliper Installation instructions Included parts: Solid billet aluminum caliper brackets (qty 2) 9/16 grade 8 bolts (qty 2) 9/16 grade 8 washers.
1 STEPMILL 7000 PT ASSEMBLY INSTRUCTIONS PART NUMBER
Electrical Wiring Circuit Board Project. STEP 1 - Identify all Parts of the Project Saw Drill Driver w/ bits Drill w/bits (not pictured) #2 Phillips Screwdriver.
Model 12 Intek Horizontal OHV
Notes and questions from a first integration in Catania of the DOM top hemisphere
Applied Control Systems
Electronics Merit Badge Class 4 5/17/2015Electronics Merit Badge Class National Scout Jamboree1.
Extended top hats installation instructions Included parts: Extended top hats (qty 2) Spring isolator bushing (qty 2) Energy Suspension top hat bushings.
SpectraSonde Assembly. What is the SpectraSonde? Reads temperature, pressure, and humidity data from the atmosphere. The SpectraSonde doesn’t fly like.
Living with the lab Attaching Arduino to Boe-Bot Chassis © 2012 David Hall.
PRACTICAL ELECTRONICS MASTERCLASS (Mr Bell) 1. Basic Electronic Components These components will be discussed further during the course, also have a look.
Chiho Wang ATLAS TRT Duke University Dubna, May Fuse Box Production Chiho Wang/Jack Fowler.
Control System and Electrical Assembly Produced by Ed Latimer, Team 476 Ken York, Team 476 Ron Markum, Team
Blade Tuner assembly Instruction for tuner assembly on a cryomodule May
M. Circella, A few issues, QA/QC meeting, 12 June 2015 Product history and status in DB Customs rules Remarks on documentation 1 A few issues.
AE5YP 1 Portable NVIS Antenna. AE5YP 2 The Thought I want an antenna easy to: Transport Set up Use No Coils or Traps (1/2 wave length Dipole antenna)
Directions: Slide 2: Print on colored paper. The number of pages printed will depend on how many “accordion” pages are needed. Cut in half along dark center.
Catania Integration site 5/11/15 Integration meeting 5 Nov 2015 Latest activities in Catania site 1.
PEPSI STARTER PALLET KIT PN: INSTALLATION INSTRUCTIONS.
DOM INTEGRATION MEETING DAAN VAN EIJK 1 OCTOBER 2015.
DOM INTEGRATION MEETING DAAN VAN EIJK 28 JANUARY 2016.
V. Bobillier1 Cable installation status.
EnviroSCAN Flat Cap Probe Assembly, Normalisation & Installation Version 1.3 (01/03/2012)
WP F/L Dom production. KM3Net meeting 2012 Erlangen - Edward Berbee - Nikhef22/06/20121.
DOM assembly KM3NeT collaboration meeting Assembly Edward Berbee The cooling mushroom is put in place with tooling, a minimum amount of.
RockOn! RockOn! Structure Build RockOn! 2009.
Organizing future KM3NeT production 06-July-2010.
The PPM project. The PPM PPM-DOM in Antares (already presented) Tests of the Vertical Electro-Optical cable Deployment of a small scale production model.
Version of document: 1.02 Software Version CBox: v3.8.0 or later Option Tilt Bucket Implementation Language: English.
VIEW SERIES with Sliding Door
Shaft Replacement Standard Operating Procedure
Making a 24hr Timer.
Berkeley status Aug 10th, 2012.
PostBase Automatic Feeder Component Removal Service Training
DOM Integration Meeting D. Vivolo - DOM Integration Meeting
X-Spot Lamp Socket Replacement Procedure
Hand & Power Tool Safety
Electrical Wiring Circuit Board Project
14 Refrigerant Recovery, Recycling, and Recharging.
KM3Net General meeting 2012 Catania - Edward Berbee - Nikhef
Automatic Transmissions and Transaxles
DOM integration meeting
Naples KM3NeT DOM Integration site D. Vivolo INFN Section of Naples.
DOM integration meeting
DOM Integration Meeting D. Vivolo - DOM Integration Meeting
Open Issues Modification of Cactus Arm bending tool required
Easycliner (Motorized Version) Assembly Instruction
Integration issues at IHEP
DOM integration meeting
Software Testing With Testopia
BIX In-Building Cross Connect system
NACE Committee Workspace (NCW)Training Workspace Features Navigation
MUSEUM Talking points: In this lesson, we will investigate how far $38 can go on a field trip to the state museum.
ATL-IC-ES new version available - approval starts
Introduction to SolidWorks
“Lesson – Installing Material Cartridge and Printing a File”
Soldering Iron Clothes Iron Hot Glue
IT Essentials PC Hardware and Software 4
Project 2 :Plastic Moulding Tray
Manual Water Ski Directory
Status of Bonding R1N, R1S, R3 of TEC University of Hamburg
Educational Power Point by D&T Within Schools
Introduction to Chemistry Day 3
Presentation transcript:

DOM integration meeting October 18 2016 Daan van Eijk

actions from previous meeting (Minutes were never sent but are here: https://indico.cern.ch/event/568414/) Daniele: Status of retuned HV on 6 PMTs in DOM67 Write NCRs on ARCA-DU3: Orientation of conical spring washers in DOMs wrong way around (include old drawing on which this mistake was based) Wrong cooling pads in DOMs or cooling paste used in DOMs instead of cooling pads Emanuele: Pour gel in one DOM first, assess the quality of the gel and report back before going ahead with DOM integration Weekly report suggests this has happened on DOM201. Is this correct? White gas: Did everyone buy it?

Grounding cable DOM159 before DOM107 after DOM159 after DOM107 before Tentative decision (not official yet): Stop mounting grounding cables in future Remove grounding cables in existing DOMs Please wait for further instructions No change with respect to earlier message: do not close DOMs

Other Issues Store all 3D-printed items, i.e. fiber trays, spring holders and PMT support structures in a dark place, to prevent damage from long-term UV exposure. This is written down in DOM design and components document, under QA/QC for all 3D-printed components CLB+PB availability: It might be that some of us can not reach DOM integration tools due to CLB+PB inavailablity Before installing the gap pad on the power board, mount kapton on soldering, see NCR KM3NeT_QA_2016_138 and pictures to the right Idea from Maarten: DOM with color filters in front of PMTs to extract information on absorption lengths in water

Rest of meeting: review Planning: Have all documentation ready by end of October All information in hands of external review committee half November Will now present for all existing documents: Status Proposed changes

DOM integration plan Document name: KM3NeT_INT_2015_009-DOM_Integration_Plan Current version: 3 Proposed changes for next version: add and complete responsibilities of DOM integration coordinator DCR: KM3NeT_QA_2016_196-DCR_DOM_integration_plan_v1

DOM exploded view Document name: KM3NeT_INT_2015_001-DRA_DOM_Exploded_View Current version: 13 Proposed changes for next version: changed number of M3x12 to 2 and M3x16 to 5 (also affects procedure!), many aesthetic changes, changed hexagon nut DIN number (439B instead of 934, i.e. ‘low’ instead of ‘high’) DCR: KM3NeT_QA_2016_156-DCR_DOM_exploded_view_v1 Expected change: Remove grounding cable

DOM design and components Document name: KM3NeT_INT_2016_006- DOM_Design_And_Components Current version: 1 Proposed changes for next version: none, new document (please read!)

DOM integration tools Document name: KM3NeT_INT_2015_010-DOM_Integration_Tools Current version: 0 Proposed changes for next version: added all available technical drawings DCR: KM3NeT_QA_2016_197-DCR_DOM_integration_tools_v1 In particular, added drawings and pictures for: penetrator and valve plug (thanks Oleg!) DOM transportation box HV cap cutting tool Power board gap pad mold

DOM testing Document name: KM3NeT_DOM_2016_004-DOM_Testing Current version: 1 Proposed changes for next version: changed JPP software version tag, changed MRunAnalyzer tag , made Naples setup similar to Catania DCR: KM3NeT_QA_2016_157-DCR_DOM_testing_document_v2 Expected change: Comments by Oleg

DOM integration procedure Document name: KM3NeT_INT_2015_008- PRO_DOM_Integration_Procedure Current version: 4 Proposed changes for next version: see next slides DCR: to be written

Changes in dom integration procedure See Excel sheet attached to Indico of this meeting

DOM integration documents Should reflect all discussed DCRs: KM3NeT_QA_2016_156-DCR_DOM_exploded_view_v1 KM3NeT_QA_2016_157-DCR_DOM_testing_document_v2 KM3NeT_QA_2016_196-DCR_DOM_integration_plan_v1 KM3NeT_QA_2016_197-DCR_DOM_integration_tools_v1

Additional documentation KM3NeT_DOM_2016_005- Penetrator_pressure_testing_procedure_Bruijn_v1 Important for Athens group

Backup

Removing grounding cables: proposal Open, before glueing PMT structure Open, after glueing PMT structure Closed Remove grounding cable ring on CLB side by unmounting screw on CLB (careful for fiber in tray) Remount screw Grab the loose end of the cable with long pliers and pull it up in order to bend away the penetrator side cable from the mushroom as much as possble Cut away (using long cutters) the grounding cable as close to the penetrator as possible (careful for fiber!) Idem, but now you really need long pliers and cutters, and you need to be careful for the glass of the PMTs We need to think if and how we’re going to open all closed DOMs…

Removing grounding cable: proposal (2) http://www.onlineaquariumspullen.nl/nl/rvs-plantenschaar.html?id=58206314&quantity=1