Project funded by: Wild Rivers Coastal Alliance

Slides:



Advertisements
Similar presentations
Walla Walla Basin Fish Habitat Enhancement Project CONFEDERATED TRIBES OF THE UMATILLA INDIAN RESERVATION.
Advertisements

Implement the Grande Ronde Model Watershed Program Administration and Habitat Restoration Projects Project Lyle Kuchenbecker, Project Planner.
Confederated Tribes of the Umatilla Indian Reservation Umatilla River Basin Anadromous Fish Habitat Enhancement Project Project No Presented.
Lolo Creek Watershed Project #
Implement Actions to Reduce Water Temperatures in the Teanaway Basin BPA FY 2002 Columbia Plateau Province Proposal Project ID #
Division of State Lands’ Wetlands Program. Issues That Spawned State Wetlands Program (SB 3) Lack of detailed wetlands inventory information or guidance.
Riparian Zone Habitat Assessment Vegetation and More.
North Carolina Ecosystem Enhancement Program (NCEEP) Project Implementation.
Keeping Maine’s Forests Pilot Project Update Fisheries Habitat Restoration Pleasant River Watershed.
Road Decommissioning Monitoring For every 10 miles of road decommissioned, one ¼ mile monitoring segment is established and monitored. Segments are monitored.
Pine Valley Country Club Stream Restoration: Phase 2 Proposal Presented March 17, 2003 Greg Jennings, NC State Univ Barbara Doll, NC Sea Grant Dave Bidelspach,
Towards a Rogue River Estuary Implementation Plan John Gardiner MBE, PhD, PE (Oregon)
Drainage District #7 Pump Station Retrofits for Safe Fish Passage Ryan Bartelheimer, P.E. Snohomish Conservation District.
Amy Sheldon Watershed Coordinator February 3, 2004.
Restoration of Chamberlain Creek Amy Clinefelter Riparian Wetland Research Program Restoration of Chamberlain Creek Amy Clinefelter Riparian Wetland Research.
Water Control Structure Inventory U.S. Fish and Wildlife Service, Arcata California with funding from the Humboldt Bay Harbor, Recreation, & Conservation.
A Review of Stream Restoration Techniques and a Hierarchical Strategy for Prioritizing Restoration in Pacific Northwest Watersheds North American Journal.
2010 Agricultural Water Resource Development Workshop Series HOW TO APPLY FOR ASSISTANCE “PRELIMINARY SITE ASSESSMENT – THE PROCESS”
Watershed Assessment and River Restoration Strategies
Protect & Restore Northeast Oregon/Southeast Washington Project Number ISRP – Geographic Review May 1, 2013.
Clackamas River Basin Council Lower Columbia River Conservation and Recovery Plan Implementer’s Perspective August 19, 2013.
Elk Creek Wood Replacement Phase Two Oregon Watershed Enhancement Board, 2009 Katie Halvorson.
Channel Modification Washington Dept. Forestry, 2004, Channel Modification Techniques Katie Halvorson.
Taking the Next Step: Implementing the TMDL. What IDEM Provides to Help With Implementation  Compiling all the data in one place  Data-driven recommendations.
Chumstick Creek Salmon Habitat Conditions* Land development, road construction, and other human activities have affected channel migration and sediment.
May 27 th, 2003FRCV Conservation Plan Summary and Status Rock Creek Valley Conservation Plan & Priorities Prepared by Friends of Rock Creek Valley with.
Lower South ForkClearwater River Lower South Fork Clearwater River Nez Perce Tribe DFRM Watershed Division Mark Johnson-Project Leader
Oregon Case Studies Ryan Johnson. Studies  The response of impounded sediment to a culvert replacement project on Sutter Creek, a tributary of Honey.
RUTHERFORD SOIL AND WATER CONSERVATION DISTRICT CLEAN WATER MANAGEMENT TRUST FUND GRANT Travis Ringo, Rutherford SWCD.
Chapter 33 Dam Construction. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Give reasons why.
Evaluation of Fish Passage Improvement Projects in the South Coast and Rogue River Basins Duck Creek Associates Dylan Castle.
Mission, Brender, and Yaksum Creeks Habitat Conditions Low flows and associated high temperatures affect distribution and abundance of native species.
Clear and Foster Creek Fish Passage Assessment and Prioritization Project Draft Methodology Report: For the Clear and Foster Creek Fish Passage Assessment.
Dry Creek Fish Habitat Enhancement Feasibility Study Current Conditions Summary.
Roseau River Flood Damage Reduction Project Roseau, Minnesota.
Coos Watershed Association Watershed Restoration Projects.
Comparison of Benthic Invertebrate Communities Upstream and Downstream of Proposed Culvert Installations in Alabama Amy C. Gill USGS, Alabama Water Science.
Coal Creek Culvert Replacement Pacific Coast Salmon Coalition.
CENTRAL MUSCATATUCK WATERSHED. BMPs Cost-Shared by Central Muscatatuck Watershed Project.
Population - 44,301 18% - Aged 65+ Household Median Income- $29,530 Jan.-March 2004 unemployment 14 % Demographics.
Habitat Mapping of High Level Indicators at Multiple Scales for Fish and Wildlife.
Laguna Canyon Creek Protection and Restoration. Major Watercourse Laguna Canyon Creek is a major watercourse. The City identifies it as that and treats.
1 Lake Ballinger and McAleer Creek Watershed Strategic Action Plan Forum Briefing #2 January 27, 2009.
Nason Creek Salmon Habitat Conditions* Development, and road building have affected riparian (streamside) habitat, large woody debris and gravel recruitment.
Nehalem River Basin: Technical Assistance for Watershed Data Synthesis, Restoration, and Outreach Priorities 4/16/2008.
Lake Roosevelt Rainbow Trout Habitat/Passage Improvement Project No Jason McLellan Confederated Tribes of the Colville Reservation January.
Pam Jeane Deputy Chief Engineer- Operations Sonoma County Water Agency Habitat Enhancement and Water Delivery.
Chelan County Lead Entity Presentation SRFB 2005 Salmon Habitat Grant Cycle.
Esteban Quiles Earth and Physical Science Department Western Oregon University Monmouth, Oregon
STORM WATER SOLUTIONS FOR EXISTING URBAN AREAS: IDENTIFYING SITES TO MAXIMIZE RESULTS Jared Bartley, Cuyahoga SWCD September 8, 2011.
Collaborative Restoration Workshop April 26, 2016 James Capurso, PhD Regional Fisheries Biologist Pacific Northwest Region USDA Forest Service.
Source: Stream Corridor Restoration Manual WATERSHED MANAGEMENT.
The Oregon Watershed Council Model, USA
Indices of Road Erosion Bear Valley Watershed, Idaho
Critical Linkages: Identifying Culvert Replacement Priorities to Maintain Connectivity of Cold Water Streams in the Face of Climate Change Scott Jackson,
A Review of Stream Restoration Techniques and a Hierarchical Strategy for Prioritizing Restoration in Pacific Northwest Watersheds North American Journal.
Fish Passage Barriers & Salmon Recovery
Local Government Engagement and Communication Strategy
North Fork Teanaway Large Wood Trapping Implementation
Tillamook – Nestucca Fish Passage Partnership
Potholes Supplemental Feed Route Project
Lancaster County Conservancy Long Range Protection Plan
Identifying Barriers to Fish Passage in Mason County
Economic Study for Watts Branch Stream Restoration N. E
Watershed Literacy & Engagement
MDE’s Phase III WIP Inventory 2018 Fall Regional WIP Meetings
Fulton County Conservation District
North Delaware Riverfront Greenway
Kirk Hanson (360)
2017 SFEG Restoration Update
Presentation transcript:

The Coquille River Tidegate Inventory By: the Coquille watershed Association Project funded by: Wild Rivers Coastal Alliance Oregon Watershed Enhancement Board

Types Of Watershed Restoration Projects We Do: Riparian Restoration Native trees & shrubs planting Invasive weed reduction Watershed Restoration Projects/Working Lands Improvement Livestock-exclusion fencing Off-channel water systems Sediment Reductions Erosion Control Road Decommissioning Improved heavy use areas Passage/Barrier Improvement Culverts Tidegates Instream Structures Large wood placement Rock weirs Spawning gravels Off-Channel Habitat Side channels Pools & Alcoves These actions will benefit not only fish, but all plants and animals and help to restore local eco-systems of working landscapes and diversity in fish runs, which will hopefully lead to eventual de-listing and greater recreational of commercial fishing opportunities

tidegates systems in the Coquille watershed

2013-2014 Tidegate & permitting assistance becomes hot topic 2014 The CWA meets with the WRCA and discusses the need for an inventory to convey the need to address failing infrastructure as well as try to find a way to assist landowners with working landscape issues such as permitting Funding was approved for the CWA to locate as many structures as possible Survey work was completed in 2015 with 114 structures 2015- current The Nature Conservancy also received funding to from WRCA to work with the CWA and convert finding to useful information including a prioritization list

The Coquille Tidegate/Water Control Structure Inventory Project Purpose: 1)The project produced a comprehensive survey of tidegates in the Coquille River system. 2)The project will also increase community awareness about tidegates, landowner outreach could possibly lead to riparian and/or large wood projects once landowners are aware of options for restoration and the enhancement of their properties and working landscapes. *We will be able to work with partners to prioritize the structures *Use data to appeal to and secure funders for on-the-ground restoration projects. *Further research and provide data on how lower wetland and tidally-influenced areas with brackish waters are a key migration tool for developing and over- wintering fry/salmonids to acclimate from fresh water to the ocean, and improving that habitat by replacing failing/non-functioning tidegates and culverts with fish-friendly tidegates will lead to healthier and more abundant fish populations.

Process Overview: *Preliminary Research & Preparation- search for and review existing tidegate information, tax lot owner info etc. *Inventory & Assessment- Survey approximately 37.5 miles of river by boat. Contact landowners and survey by land. *Inventory Report- Compile collected data, meet with partners for assessment, feasibility and assist with priority rankings. *Project Development- Begin developing outreach and projects with willing landowners.

Preliminary Research & Preparation Mattison tidegate study 2011 Approximately 36 listed tidegate. ODFW fish barrier layer OFPB_NHD_Publication20141114.gdb Review of tax lot layers along waterways Coos County/Assessors /Map Information/GIS Parcel Interactive web map Review of GIS mapping and crossing points. Arc GIS map imagery-CWA Google Earth

Mattison GPS points converted to GIS map

Inventory results 114 structures found along the 37 miles of river as well as on private land where permission was granted. 59 (52%) were 2 feet or less 32 (28%) were 2-5 feet 10 (9%) were 6-8 feet 5 (7%) were 6 feet or larger 4 (4%) were unknown Observations indicated: 28 (25%) Considered fully functioning for working landscape needs 11 (10%) Considered partially functioning with leaks 12 (11%) Considered not in functioning condition 63 (56%) unknown condition-not able to verify or not permission to access Fish passage % by ODFW standards is unknown at this time, some are on the ODFW barrier list.

Example site 13:. will show various data collected Example site 13: *will show various data collected *pictures and site description/observation *Example of possible habitat improvements With the help of TNC priority ranking process we will have additional data of how the project ranks overall, potential acres of habitat behind the gate, potential data for conceptual project cost estimate.

Tidegate Primary Secondary or crossing   Lat & Long Approx. River Mile Survey method Tidegate Primary Secondary or crossing Size ft. Type Condition Notes Crossing Type Water depth at upstream/ inlet Upstream width @ structure 1st ACW at upstream widthx10 2nd ACW at 20' above first 3rd ACW at 20' above second Water depth at down stream/ outlet Downstream width @ structure 1st ACW at down stream widthx10 2nd ACW at 20' below first 3rd ACW at 20' below second Channel Name ODFW identified presence? ODFW identified tidegate as barrier? distance/ type to next barrier Potential habitat in all tris to next barriers 9 124.16.493 43.10.444 16.8 Boat Primary 3 metal- top hinge Appears working- currently closed- possibly leaking Unknown brand Round- CMP Appears good at tidegate. No acess to inside Tidal Rivers Edge No 10 124.16.395 43.10.956 17.8 Boat & Land 6x6 Metal hangers-wooden flaps Appear to be maintained and working Unknown brand, possibly leaks concrete- square 50 Appears clear and functioning- No acess to inside 5 30 60 Assumed unknown 3.77 10B same 11 124. 16. 643 43. 11. 518 18.65 4x4 Wooden flap w/ pet door Out of alignment- leaking Home made- gate on each end of pipe concrete/ corrigatede- round 4 **Appears to be concrete on one end and corrigates on the other. 3.75 Chained partially open-petdoor broke- leaking homemade 12 124.25.949 43.11.538 20.3 124.15.596 43.11.746 13 124.17.774 43.09.254 14.99 top hinge-Aluminum Rectangle gate on round culvert structure CMP-round 8 Appears clear and functioning- crossing is stable and retaining wall good 2 11.5 14.2 13.8 10.8 20 daylight @115' Hatchet Slough yes 4.6 miles 14 124.17.870 43.08.755 14.4 Wood & rubber mat with manual lift Unknown brand. Currently closed with manual control Plastic- round 8.5 daylight @170' Seestrom Creek 2009 feet Road culvert-unknown passage condition 2.09 miles 15 124.17.429 43.08.129 13.5 2x4 Wood hanging by rope Homemade Galvinized-round Eroded with retaining wall on both sides 5.5 6 daylight @100' Alder Creek 2,227 feet Road culvert-passable 2.02 miles 16 124.17.411 43.08.081 13.45 Top Hinge- Steel, CALCO Intact but ajar with debris Manual oporation- Concrete basin & footings Appears clear and functioning- crossing is stable Unknown 3.25 daylight @40' Unnammed trib 1553 feet Road Culvert-unknown 0.75 miles

#13 river mile 14. 4 is a primary tidegate/water control structure #13 river mile 14.4 is a primary tidegate/water control structure. Tidegate appears to be functional, possible minor leaking. While considered functional to the landowner this could be considered a full fish barrier depending on operation management. Based on GIS map and ODF fish layer improvement to operation management or replacement with fish friendlier gate could improve fish access to approximately 4.6 miles of habitat.

ODFW Current and historical fish habitat indicated by yellow line behind barrier 13. Measured out to Approximately 4 miles of potential improved habitat access.

2,508Ac (3.9 sq. miles) of watershed Site 13 (Hatchet Slough) 2,508Ac (3.9 sq. miles) of watershed 4 miles of coho habitat per ODFW layer 18.7 miles of stream network 34.7 ac of inundation area 1 know barrier at this time (tidegate)

Various Pictures of Structures

Biggest Project Challenges Landowner may not be open to Federal, State or other regulatory agency involvement Project funding Lack of project development funds Funding match sources Funding timelines (1 or 2 yrs.) Permitting Complexity of information required length of time to process Associated use restrictions or requirements

Next Steps: *Continue Working with TNC staff to use data to complete prioritization *continue Working with ODFW to assist with prioritization *Continue landowner and agencies project development (3 in process) *continue to Seek and obtain funding *continue to Work with permitting agencies to streamline permitting process under certain conditions (PROGRAMATIC) *Improve project implementation timelines to meet working landscape needs *Share what we have learned with others