Wyckoff/Eagle Harbor Site

Slides:



Advertisements
Similar presentations
WRIA 8 Plan Updates 3-Year Work Plan and 10-Year Start List WRIA 8 Salmon Recovery Council March 18, 2010.
Advertisements

Not to be Considered as a Regulatory Submittal Pre-Decisional DRAFT 19438_1 Preferred Alternative Recommended by Core Team Environmental Impact Statement.
Alton Park Community-wide Brownfields Assessment Project.
Cytec Statement of Basis and Permit Modification July 16, 2012 Public Hearing Ohio Environmental Protection Agency.
1 BoRit Asbestos & The Superfund Process Stacie Peterson, Remedial Project Manager (RPM)
Essex Region Conservation Authority Brad Arsenault & Kaylyn Boyd.
Northwest Region Cleanup Program Zidell Waterfront Property Cleanup 2012 Portland Scott Manzano | Oregon Department of Environmental Quality.
Confined Disposal Facilities and In Situ Capping Site characterization / selection Engineering design Operational considerations Contaminant pathways and.
Vermilion County Brownfield Assessment Grant. Overview Brownfield Basics USEPA Brownfield Assessment Grant Vermilion County Assessment Grant Site Selection.
Reuse / Revitalization. What is Reuse / Revitalization? Restoring contaminated and potentially contaminated sites to productive use.
SB 5296 passed in 2013 authorizing new tools: Defined Brownfields Changed Remedial Action Grant (RAG) program; made Integrated Planning Grant (IPG)
 Cold Spring is a town in New York State, situated on the Hudson River  To the south of Cold Spring is:  Foundry Cove – a small river inlet  Constitution.
Jill Lowe Remedial Project Manager August 7, 2013.
Location In the mountain of Colorado consist of numerous sites in Denver area which contaminate with radioactive soils and Debris. There are about 65.
Green Remediation An Overview of the State of the Practice
Sustainability and Best Management Practices Environmental Remediation Russell Downey Pfizer Global Engineering 5 November 2014.
CCRPC Board Training Climate & Brownfields September 19, 2012 Julie Potter, Senior Planner.
TOWN OF WALPOLE FACILITIES PLAN UPDATE SPRING ANNUAL TOWN MEETING MAY 7, 2014.
Employees can help reduce water pollution by preventing dirt and debris from being washed into the storm drain system during the following activities:
Update on the Superfund Program: U.S. Tour de Table NATO SPS Pilot Study Prevention and Remediation in Selected Industrial Sectors June 17-23, 2006 Ljubljana,
Carmichael Town Hall Meeting Western Groundwater Operable Unit - Update 12 March 2008 Alexander MacDonald (RWQCB)
REUSE AT THE OHIO RIVER PARK SITE Chris Thomas, Region 3 Superfund Redevelopment Coordinator.
EXPLORING RECREATIONAL AND EDUCATIONAL OPPORTUNITIES AT THE PICAYUNE WOOD TREATING SITE Michele Mahoney, EPA TIFSD.
History and Cleanup at Chemical Commodities, Inc. Jeff Field US EPA Region 7 1.
THE GEORGIA BROWNFIELD PROGRAM MAY 22, BROWNFIELD: FEDERAL DEFINITION Real property, the expansion, development or reuse of which may be complicated.
Aerojet Environmental Update Carmichael Town Hall Meeting March 12, 2008 Michael Girard Aerojet Environmental Site Remediation (916)
Coastal Brownfields: At the Water’s Edge Panel: Waterfront Revitalization and Marine Transportation.
Maryland Department of the Environment Harbor Point – Regulatory Overview Horacio Tablada, Director Land Management Administration November 14, 2013.
Early Reuse Assessments City and EPA partner to complete visioning phase for future reuse 1.
Brownfields: Real Property, the expansion or redevelopment, or reuse of which may be complicated by the presence or potential presence of contamination.
Triangle Park Removal Action Area within the Portland Harbor Superfund Site (Portland, Oregon) Jennifer MacDonald Assistant Regional Counsel Office of.
1 Moab Uranium Mill Tailings Remedial Action (UMTRA) Project Site LTS&M Planning LTS&M Conference Grand Junction, CO November 16, 2010 Donald Metzler U.S.
Atlantic Gulf Colonial Brownfield: ROCC (Redeveloping Orange County Communities) Brownfield Designation Environmental Protection Division District 5 March.
NORWOOD PCBS SITE Daniel Keefe, Region 1 Remedial Project Manager.
By Mitch Cooper & Haley Herbert January 1987 Vertac site manufactured herbicides 1978 National Dioxin Survey 1983 Site placed on the National.
October 2011 Schlumberger Site Assessment 36 Old Quarry Road Ridgefield.
The Truth about Ecological Revitalization - Case Studies and Tools to Improve your Cleanups Tom Bloom, EPA Region 5 Community Involvement with Ecological.
Presented by: Donna Gaukler, Director. Parks and Recreation services are considered essential to our quality of life and valued as vital components to.
Brownfields 101 Federal and State Role in Brownfields Redevelopment Carol Tucker, Section Chief Brownfields Program US EPA New England.
PORT OF TACOMA. Request authorization to award Professional Services Agreement (PSA) No with Geomatrix; and PSA No with Hart Crowser for.
The Dalles, Industrial Certification Northwest Aluminum Company The Dalles, Oregon Douglas C. MacCourt Ater Wynne LLP US German Bilateral Working.
GEORGIA PACIFIC WEST PROPOSED INTERIM ACTION Public Meeting & Open House – July 12, 2011.
EPA Targeted Brownfields Assessment Applications for Culturally Sensitive Sites The TseWhitZen Village Cemetery Restoration Project Joanne LaBaw, EPA Matthew.
BROWNFIELDS 2005 Dealing with Unexpected Contamination Lowry Air Force Base Redevelopment Denver, CO Tom Markham, Executive Director, Lowry Redevelopment.
From Pink Motel to Fire House Site History Site originally developed in 1950 Hotel closed and abandoned in 1996 Assessments under the Nye County Brownfields.
Works of Art: Redeveloping Properties for Cultural Reuse Harvester Artspace Lofts Council Bluffs, Iowa Tina Hochwender – City of Council Bluffs.
Visioning Session Schedule Community Opportunities Community Opportunities o Starting with a blank page… Time and Task Time and Task 6:30 Introduction.
Long-Term Stewardship: Ensuring the Safe Use of Contaminated Sites Brownfields 2006 Boston, MA.
Sustainability Week BUS& 201 Business Law Shana Chung December 3, 2014.
1 East 115th Street MGP Site Remediation Status Update Manhattan Center for Science & Math Parents Association Meeting May 17, 2016.
Remediation and Redevelopment at the Former Fort Devens, Massachusetts.
 Public Health  Enabled a deeper level of community engagement  Characterized human health risk in an educational process for community  Assists.
Howard Preserve Expansion
July 11, 2017.
1st Avenue Revitalization Project Brownfield Pilot Study Public Outreach Property Owner Stakeholder Meeting June 1999.
Redevelopment Authority of the County of Washington O
Continental Steel Superfund Site
The Florida Inland Navigation District:
RESTORING CONTAMINATED SITES TO PRODUCTIVE USE
Regional Water Availability and Superfund
Sediment Cleanup Options
Water Quality Improvement Projects and Engineering Planning Grant
FEASIBILITY AND COST PRESENTATION – 9/26/17
Article 41 Wastewater Planning Capacity Study
Restoring Superfund Sites to Public Good
McClellan Reuse: Successes & Challenges 2006 Update
Introduction EPA is overseeing the RI/FS for the Rolling Knolls Landfill being conducted by several companies under a 2005 administrative order on consent.
CONSERVATION 20/20 MANAGEMENT AND MANAGEMENT TRUST FUND OVERVIEW
Tribal TAB Program Providing “Technical Assistance to Brownfields” to all U.S. Federally Recognized Tribes!
Presentation transcript:

Wyckoff/Eagle Harbor Site Case Study and Lessons Learned

Topics for Today Brief Site History Cleanup Actions to Date Redevelopment Actions to Date Reuse Planning Process Reuse Outcomes Additional Cleanup Actions Proposed Lessons Learned Questions

Site Location

Suquamish Tribe Village on Eagle Harbor - Early 1900s

Cleanup History Added to the Superfund list in 1987 Contamination found in upland soils and groundwater, and in Eagle Harbor sediments Two primary sources of contamination Wyckoff wood treating facility Former shipyard Extensive cleanup actions implemented between 1993 and 2008

Site Overview

Site History Wood treating facility 1940s

Cleanup Actions to date: Upland Demolition and removal of buildings, chemical storage tanks, grossly contaminated surface soils Perimeter sheet pile wall Groundwater extraction and treatment system (wells, treatment plant) Fencing, signage to prevent exposure to soils

Current Site Conditions

Cleanup Actions to date: Offshore Sediment cap over 70 acres of Eagle Harbor Built in phases 1993 - 2001 West Beach Wooden bulkhead demolished Contaminated soils removed Exposure Barrier System built in 2008 Extensive cap repair 2017

Sediment Cap in Eagle Harbor

Former bulkhead along West Beach

West Beach Today

Redevelopment Actions to Date Property purchased by the City and Bainbridge Island Metro Parks park in early 2000s Trails constructed, signage posted View Point looking across Puget Sound Bainbridge Island Japanese American Exclusion Memorial constructed on western end of Park

Major Steps to Park Development Planning group that focused on acquiring the property, Wyckoff Advisory Committee Acquisition – in several phases: 2004 – 2006. EPA Pilot Project Grant Pre-purchaser Agreement, Justice Department Covenant and Agreed Order Grants and Funding Partners, Trust for Public Land and BILT Development of trails Site Design: City – Parks Advisory Design Committee – University of Washington Memorial, First Phase Development.

Joel Pritchard/Japanese American Memorial Park Project

.

Site Plan Allows for Future Adaptation of the Point – Next Phase of Clean-up

Pritchard Park Plan Accentuates Location

Restored Beach Satisfies Local Needs

Point

Upland Trails: Provides for Recreation Demand

Shoreline and Trail Interface

Nidoto Nai Yoni “Let it not happen again” On March 30, 1942 the federal government through Executive Order 9066 gave authority to the War Department to remove what would total over 110,000 persons of Japanese ancestry from the west coast. The first 227 of these residents came from Bainbridge Island.

Memorial Planning with NPS and Local Partners

Memorial Planning with NPS and Local Partners

The Plan Provides for Interpretation of Pivotal Events for the Nation and the Community: Japanese American Internment

Joel Pritchard/Japanese American Memorial Park Project

Park Planning Process: Lessons Learned Know the local setting -- its landscape, history and people. Something has happened here prior to Superfund status. Answer the What, Who and When… not Just Where and How. Develop the intellectual infrastructure and patience for decision-makers; a plan discusses site constraints but points the direction forward toward future opportunities. Superfund Site status will represent more than a clean-up to a community when related to the human history of place; prior and future endeavors; and seeks to re-instill a sense of dignity.

More Cleanup Work is Needed In the Upland portion of the site Perimeter wall is corroding Groundwater extraction & treatment system is expensive, will require >100 years of operations On the East Beach and North Shoal: Seeps of creosote remain on the beaches Beaches are closed to shellfish harvesting Additional cleanup actions proposed in 2016 EPA and Bainbridge Island Metro Parks will continue to coordinate as cleanup plans are developed

To Learn More Community re-use plan: http://www.bainbridgewa.gov/574/Pritchard-Park-Design-Recommendations Fact sheets and technical documents about the cleanup: http://www.epa.gov/superfund/wyckoff-eagle-harbor Pritchard Park: https://biparks.org/parks-trails-finder/ Japanese American Exclusion Memorial: http://bijaema.org/ Site reuse case study: https://www.epa.gov/superfund-redevelopment-initiative/depth-case-studies-superfund-reuse