PEPPo Weekly Status Meeting February 16, 2011 & 6MSD Planning Meeting February 23, 2011 Part 1 – Technical summary of layout Part 2 – Month-by-Month Installation.
Advertisements

HIE-ISOLDE HEBT: characteristics Beamline diameter: 40 mm (REX: 100 mm) Beamline height: 1.75 m Beamline vacuum: low 1e-7- high 1e-8 mbar Connection of.
C. Rossi – L4 Project Meeting 3 March 2011 Status and Plans of 3 MeV Test Stand.
11-13/10/2007 ILC BDS Kick-Off Meeting, SLAC, US 1 BDS Vacuum System Dr. Oleg B. Malyshev ASTeC Daresbury Laboratory.
CERN TS Department / Civil Engineering Group 8 February 2008 Civil Engineering Layouts & Tunnel Cross Section 1 CLIC/ILC Collaboration Meeting 8 Feb 2008.
1 Stefan Moeller 1 AMO Instrument Schedule ARR AMO Instrument Schedule Stefan Moeller – XES Manager June 30, 2009.
DAQ&CM Infrastructure Paul Drumm. Issue Space is running out! Power supplies, RF system –Big kit, legislation dictates space requirements (not a clear.
T. Montagne LTU – Beam Dump Installation April 16, LTU and Beam Dump Installation April 16, 2007.
Compressor status AWAKE Technical Board meeting 19 May 2015.
Bubble Chamber Planning Meeting 04 September
Ch Electricity IV. Measuring Electricity (p )  Electrical Power  Electrical Energy.
Laser news AWAKE performance meeting Overview There was a meeting on with the supplier of the laser system (AMPLITUDE) No new information.
E. Beebe LEBT & Ion Injection EBIS Project Technical Review 1/27/2005 LEBT and External Ion Injection Ed Beebe Preinjector Group Collider-Accelerator Department.
Low Voltage Power Requirement of TOF FEEs. Maximum tray. Low Noise:  Periodic and Random Distortion (PARD) < few mV RMS Floating.
PAIR SPECTROMETER DEVELOPMENT IN HALL D PAWEL AMBROZEWICZ NC A&T OUTLINE : PS Goals PS Goals PrimEx Experience PrimEx Experience Design Details Design.
’ tall Empty space below this metal sheet 66’ 14’ 4’ 10’ Ceiling tiles = 24 Concrete blocks 14’ long There are two “styles” of Ceiling tile,
1 Status of EMMA Shinji Machida CCLRC/RAL/ASTeC 23 April, ffag/machida_ ppt & pdf.
October 4-5, Electron Lens Overall Design Alexander Pikin October 4, 2010 Electron Lens.
FAIR PROJECT COST BOOK. FAIR cost 1.2 mld euro 1. Civil construction and infrastructure 322Meuro 2. Accelerator systems 592 Meuro 3. Experimental facilities.
Installation issues - update, July 2006A.Fabich1 MERIT installation: Update July 2006 A.Fabich CERN AB-ATB July 2006.
All Exp Mtg July 7, 2008 NuMI-MINOS Status Report – Laura Loiacono FAR DETECTOR: FD live time was 95.7% for cosmics last week (ROP7 problems reported at.
Christoph Gabor, ASTeC HIPPI—Meeting (WP 5) 26 th – 28 th September 2007 Non—destructive transverse emittance measurement device The Front End Test Stand.
UK Neutrino Factory Meeting Front End Test Stand (F.E.T.S.) Engineering Status by P. Savage 22nd April 2009.
NSLS-II Transfer Lines BUDKER INSTITUTE OF NUCLEAR PHYSICS NOVOSIBIRSK.
Target Commissioning Target installed in ISIS “Demonstrator” target in R78 Initial commissioning plans Chris Booth Sheffield 11 th February 2008.
RSVP AGS Upgrade Projects MECO RSVP Preliminary Baseline Review Brookhaven National Lab April 6-8, 2005 D. Phillips.
Design, integration and installation milestones Legend: 2015/Q1= 1 st quarter of 2015 (January-March) Phase 1 = proton & laser beams operation Phase 2.
1 Mice Collaboration Meeting CM33 Glasgow University 25 th – 29 th June 2012 STFC Daresbury Laboratory Electrical Infrastructure Report Authors : Ian Mullacrane.
Hall A Installation Review John J. LeRose 2/25/2009.
PHENIX Safety Review Overview of the PHENIX Hadron Blind Detector Craig Woody BNL September 15, 2005.
The Introduction to CSNS Accelerators Oct. 5, 2010 Sheng Wang AP group, Accelerator Centre,IHEP, CAS.
RFQ – Design, Components and Fabrication 1 We aim to design and manufacture a Radio Frequency Quadrupole (RFQ).
Energy Consumption Energy consumption is measured in kilowatt. hours. A kilowatt hour is the amount of energy being consumed per hour. –Energy (kwh) =
LINAC3 UPGRADE Source and LEBT modifications for YETS and recommissioning timetable 28/10/2015 Ville Toivanen.
ApEx needs for CeC PoP Experiment December 11, 2015.
PXIE absorber test bench A. Shemyakin, C. Baffes, K. Carlson, B. Hanna, L. Prost, J. Walton November 6, 2012 Project X meeting Test bench description Difficulties:
LEReC System 1. Project Schedule 2015 shutdown COMPETE! Move beam line equipment from IP 01:00 Install cooling section beam line 2016 shutdown Install.
Pulsed Magnet Power Supply Feasibility Study
ELENA installation progress F. Butin / ELENA collaboration.
The Super-FRS Multiplet, Magnetic and Cryogenic requirements
Report Technical Director Storage-Ring-Installation Completed
Vacuum System P. Chiggiato TE-VSC
HMS Status Steven Lassiter Jan 20, 2017.
Report Technical Director Storage-Ring-Installation Completed
Development of a new compact 5.8 GHz ECR ion source at LPSC
LASER SAFETY External EHS Expert Panel Workshop
A 3D design model of the apparatus for the Laser Wakefield Acceleration of electrons at ELI-NP S. Balascuta1 , R. Dinca1 1) “Horia Hulubei” National.
CLIC Handling Engineering Update
St. George Infrastructure
Computing room PC farm UPS.
IT-4189 Supply and installation of a cryogenic distribution system
CLEX Building Layout, Conventional Facilities, TL2, TL2’,
ELENA installation and commissioning status
The Elimed Control System approch
CLEX* Status and Plans CTF3 complex CLEX
Construction and Commissioning of Electronic Test Benches
M. Alcaide Leon, Paolo Fessia
FCC Tunnel and Shaft Cross Sections
Compact and Low Consumption Magnet Design The DESY Experience
Undulator System Installation
IV. Measuring Electricity
ARIEL Phase I Operations
One quarter of RFQ vessel + vacuum pumps and supports
J. Seeman Assistant Director for PPA/LCLS
Hall C SHMS & Configuration Status
Primary Spectrometer & Sample Environment
X-ray Irradiator at UCSF MB
Hall C SHMS & Configuration Status
Vacuum Control System for Monolith Vacuum
Generation of Magnetized Bunched Electron Beam for MEIC Cooler
Presentation transcript:

E4 hall technical specifications Electrical power consumption update Experiments racks layout update Visualization of E4 (ongoing)

ELIMAIA power consumption Ion acceleration Item Consumption per unit (kW) Number ELIMAIA consumption [kW/h] Hours per day High Vacuum Pumps 1 6 8 Oscilloscopes 0.4 10 4 16 Alignment rack 9 3.6 24 Experiment rack 3 12 Beam diag rack 2.5 TP spectrometer 5 HV PS (above 10 kV) 0.5 2 LV PS (bellow 10 kV) 0.3 1.2 Pixel detectors 0.1 Streak cameras Power Supply for Dosimetry Detectors and Monitors Motorized System for Bench Translation/Rotation Water Phantom, XY Profile System, Beam Monitoring Power for users TOTAL POWER   Max power 51.2 kW Nominal 28.8 ELIMED estimate Item   Consumption per unit (kW) Number Total consumption Dipoles 315 Amps 35 V 11.0 4 44.1 Quadrupoles 200 A 30 V 6.0 2 12 Steerings 10A 20 V 2.0 8 Diagnostic equipment 1 Other support equip. 3.5 TOTAL POWER (kW) 69.6 kW Power available for ELIMAIA: 120 kW + 30 kW on UPS Total electrical full power consumption: 120.8 kW Which ELIMED equipment will need to run on UPS?

Services in the experiment halls (E1) Distribution hubs Roughing vacuum DN160 Cable trays Backing vacuum DN80

ELIMED experiments racks Experiments racks location One rack further, move the green one away New location? ELIMED experiments racks

Experiment racks Dimensions: Height: 42 U – 45 U (1867 mm – 2000 mm) Width: 600 – 800 mm Depth: 600 / 800 / 1000 / 1200 mm EMP shielded 2 front doors