Interstate 15 North 4/09/2015 Update

Slides:



Advertisements
Similar presentations
Project Description and Needs Lincoln Way Widening Addition of a center-turn lane and safety improvements to the grade and horizontal alignment. Needs.
Advertisements

1 Loop 303 US 60 to Happy Valley Parkway Arizona Department of Transportation February 26, 2014.
County of Fairfax, Virginia Sully District Council Meeting November 19, 2014.
Congressional District Projects New CD-2 SH 392 Interchange at I-25: — Bridge replacement and widening, will also improve on/off ramps and frontage roads.
WELCOME! October 28, 2013 ODOT District 1 & District 2.
Project Construction Update August 30, 2011 I-5 North Stockton Freeway Widening and Pavement Reconstruction Project Between Dr. Martin Luther King Jr.
August 18, 2011 State Route 99 Auxiliary Lanes Project Route 32 to East 1st Avenue.
Santa Maria River Bridges Widening. Project Location.
75 Express Lanes Segment D Construction From South of Sheridan Street to North of Griffin Road Presentation to Ivanhoe Community August 27, 2014.
I-10 Exercise. Project Description Current and anticipated congestion due to rapid growth, one lane in each direction will be added to Interstate 10 from.
10 miles on I-80 from Robb Dr. to Vista Blvd. Reconstruction through congested downtown Installation of new 10-mile ITS system Preserved Operational Capacity.
Environmental Assessment Public Meeting
Tropicana Avenue To Blue Diamond Road I-15 South Design-Build Project Paving the Way to a More Mobile Las Vegas Presented to Las Vegas Convention and Visitors.
Proposition 1B and the Strategic Growth Plan Randell Iwasaki California Department of Transportation.
Federal Aid Project No. STP 2603 (501) Environmental Assessment
2 Why fortify? 30-year-old pavement was cracking and crumbling because of a chemical reaction happening underneath the road, triggered by a substance.
I-65 Added Travel Lanes Project in Tippecanoe County
Congressional District Projects New CD-1 Central Park Blvd/I-70 — $47.2 million project funded through the American Recovery and Reinvestment Act (ARRA).
Jeff Lerud, PE, CPM Senior Project Manager Nevada Department of Transportation.
Congressional District Projects New CD-3 SMART 160 Trail: — This trail will be a multiple use trail and will offer access to a network of current and proposed.
Alameda Creek Bridge Replacement Scoping Meeting March 4, 2014.
Capital Improvement Program. During the Annual Strategic Action Plan (SAP) evaluation, long-term needs and priorities are identified by City Council Capital.
Congressional District Projects New CD-7 North I-25 Record of Decision (ROD): — Recently signed the Environmental Impact Statement (EIS), for the corridor.
STATE ROUTE 1 ALAMITOS BAY BRIDGE IMPROVEMENT PROJECT SCOPING MEETING AUGUST 5, :00 p.m.Open House 6:30 p.m.Presentation 7:00 p.m.Public Comment.
WELCOME! July 31, 2012 ODOT District July 31, 2012 PURPOSE OF TONIGHT’S MEETING Introduce the project –Reconstruct I-75.
AWARD OF CONTRACT FOR CONSTRUCTION OF CALIFORNIA OAKS ROAD AT I-15 INTERCHANGE CIP NO City Council Meeting January 18, 2011.
Design Criteria CTC 440. Objectives Know what “design criteria” means Determine design criteria for various types of facilities.
1 MnDOT Metro District Proposed Transportation Improvement Program (TIP) Amendment Metropolitan Council January 17, 2007.
Tracy Lovell, PE HSIP PROJECT PROCESS. HSIP Process  Identify the location – RD Corridor, Emphasis Area, etc.  Conduct Road Safety Audit with multi-disciplinary.
Design Manager: Chris Thomas CEAL July 17, Interstate 8 (I-8) to Interstate 5 (I-5) Connector Widening and Auxiliary Lane Project.
Interstate 15 North Phase 4 9/01/2015 VE Class. Background: I-15 North Environmental Document, Purpose & Project Elements I-15 North Environmental Assessment.
Metro Highway Program Presentation to CMAA Abdollah Ansari
HOOSIER HEARTLAND HIGHWAY SR25 Segment Four Cass County Public Information Meeting December 10, 2009 Design Consultant – United Consulting Engineers.
U.S. 20 Intersection Improvement Project at Waverly Road Porter Town Hall Thursday, August 13, 2015.
1 MD 5 (Point Lookout Road) Leonardtown (Phase 1) Intersection Reconstruction At Abell and Moakley Streets Informational Meeting January 19, 2016.
MED SR 18 Corridor Project MED PID October 13, 2015.
I-465 at I-65 Interchange Modification Public Meeting 6:00pm Monday, October 1, 2012 South Grove Intermediate School Beech Grove, Indiana.
I-80 Robb Drive to Vista Boulevard Design-Build Project I-80 Robb Drive to Vista Boulevard Design-Build Project.
Major Project Scoping Committee.  Two previous studies to develop improvements for the I-35W Corridor ◦ Project Limits were from 42 nd to I-94 ◦ Project.
11 Ina Road Traffic Interchange Project Update Marana Chamber of Commerce Business Connection Luncheon May 18, 2016 Greg Byres, PE, Senior Urban Project.
Technical Issues Design Status Due Diligence Materials Tony DeVito, Project Director Jan. 28, 2016 I-70 East Project.
All information presented is preliminary and subject to revision I-515 Alternatives Development Study Public Information Meeting March 31, 2016 Welcome.
County Road 19(Manning Road) & County Road 22 Improvements Environmental Study/ Preliminary Design Report November 2008.
Interstate 15 North Phase 4 9/01/2015 VE Class
Interstate 15 North Phase 4 Cost Risk Assessment 9/03/2015
Existing Interchange CC 215 Single bridge I 15
I-15 North Phase 4 Project Scoping Overview January 28, 2016
Orange County Transportation Authority
Interstate 15 North 8/17/2015 Update
I-15 North Phase 4 Scoping & Project Management Assistance
Future Interstate 11 Kevin Verre
Project Status & Right-of-Way Acquisition
Interstate 15 North Phase 4 Cost Estimates 09/03/2015
Interstate 15 North Phase 4
21st Century Transportation Committee Finance Subcommittee
I-15 North Phase 4 Scoping & Project Management Assistance
Interstate 15 North Phase 4 8/19/2015 Update
Consideration of Municipal Consent for MnDOT I-35W Improvements
River to Sea TPO Meeting US 92/International Speedway Boulevard
I-515 Alternatives Development Study
Construction Management & Inspection
I-85 Widening Project MM Cherokee County Public Hearing March 14, 2017.
Upcoming Major Projects Nevada Transportation Conference April 9, 2013
US 75 Improvement Study Thanks for attending the Texas Department of Transportation’s first Grayson County open house for the US 75 Project from FM 1417.
I-85 Widening Project MM Cherokee County Public Hearing March 14, 2017.
Geometric Design: General Concept CE331 Transportation Engineering.
Design Criteria CTC 440.
Metropolitan District | mndot.gov
East Selmon Capacity Project PD&E Study Industry Forum
State Route 55 Improvement Project from Interstate 5 to State Route 91
Presentation transcript:

Interstate 15 North 4/09/2015 Update

I-15 North Environmental Document Study Purpose and Project Elements I-15 North Environmental Assessment –FONSI issued May 2007 Purpose: Accommodate Projected Traffic Decrease Congestion Reduce Travel Times Improve Access, Operations & Safety Elements Increase Capacity Interchange and ramp improvements Freeway Management System Planning/NEPA/PE/ROW cost to date $ 5.03 Million excludes some of Phase 1 (Design Build) Design Cost

I – 15 North Phase 1 (Constructed) Widened I-15 to ten lanes from US 95 (Spaghetti Bowl) to Lake Mead Widened I-15 to eight lanes from Lake Mead Boulevard to Craig Road Reconfigured Lake Mead Interchange – realignment of the on-ramps and off-ramps Added Auxiliary Lanes Completed 2010, $ 270 million Cost to Construct via Design Build (DB). The DB Project included DB design cost as well as construction costs

I-15 North Remaining Phases Phase 2 – Speedway to Craig Package A (Originally Packages A,C &D) to advertise Federal Fiscal Year (FFY) 2016. Anticipated cost to Construct Package A is $ 38.7 to $ 40.2 (M) million Design Bid Build (DBB). Capacity Project (4 to 6 thru lanes) Package B Intelligent Transportation Systems (ITS ) DBB completed construction in 12/2013 at a cost $ 5.234 M Package E - Intelligent Transportation Systems (ITS ) Speedway to Apex is now part of FAST package H1 Phase 3 – Speedway to Apex First Construction Package to Advertise FFY 2019. Capacity Project (4 to 6 thru lanes) Cost of Construction estimated to $ 75- $ 85 M Phase 4 – I-15 and CC 215 Beltway Interchange Cost of Construction estimated to $ 142 - $ 191.8 M First Construction Package FFY 2018

I-15 North Phase 2 Package A includes: Widen I-15 from 4 to 6 lanes for 4.8 miles Add Aux. Lanes between interchanges Restore pavement condition Widen & Seismic Retrofit 4 Bridges over the UPRR Landscape and Aesthetic Improvements Package B -ITS completed

I-15 North Phase 3 Project on “Hold”, Design to resume 2016 Construction Packaging to be determined Project elements Widen I-15 from 4 to 6 lanes (4.6 miles) Restore pavement condition Landscape and Aesthetic Improvements FAST Package H1 –ITS Improvements to advertise FFY2015

I-15 North Phase 4 Improve I-15 and CC 215 Beltway System to System Interchange Two concepts under consideration (Three level & Two level) Improve freeway operations and safety by providing a new interchange Interchange to be constructed to improve local connectivity as well Construction Packing To be determined by March 2016 First Construction Package FFY 2018

NDOT Project Management Division: Assistant Chief – Lynnette Russell Project Contact NDOT Project Management Division: Assistant Chief – Lynnette Russell Email – lrussell@dot.state.nv.us Phone – 702-671-6601 Project Manager – Dwayne Wilkinson Email – dwilkinson@dot.state.nv.us Phone – 702-671-8879