EHN1 Extension North Side wall (Removal of Existing services & platforms) Michael Jeckel & Bastien Rae.

Slides:



Advertisements
Similar presentations
Heating, Ventilating, and Air-Conditioning
Advertisements

Stem Challenge Energy management systems, CHP, Harvester tank, green roofs and underfloor heating. 1.
INTD 51 human environments building systems. heating/ventilation/air-conditioning (HVAC) maintain a comfortable indoor climate control temperature and.
NSS Requirements Review: Utilities Michelle Everett Lab Coordinator Scientific Activities Division November 12, 2014.
CURRENT STATUS OF CV INSTALLATIONS, WORKS DURING LS1 AND PROBLEMS ENCOUNTERED DURING START-UP NORTH AREA Bill Bannister / Jani Lehtinen EATM – 7 th October.
Dirty Tour December 2005 UN Capital Master Plan. 2 Dirty Tour- introduction The UN building was a state-of-the-art, code compliant structure when it was.
June 2004 Andrea Gaddi, PH-CMI USC Installation Commissioning Task Force 1st Run Meeting, June 3rd, 2004.
1 MICE - INFRASTRUCTURE MICO meeting 7 th February 2008 Tim Hayler.
EN-CV status EHN1 Extension Project Jérôme Rodary EN-CV-PJ 2015/08/06.
ISOLDE: Status report building th ISCC meeting CERN, 31 March 2014 Erwin Siesling, Magda Kowalska.
Bulding 245 schedule update LIU Booster Meeting Fulvio Boattini & Michel Obrecht TE-EPC / EN-CV TEEPC.
IT-4082 Design, Supply, Installation and Commissioning of the ventilation of the BAF3 building Alexandre Broche EN-CV-PJ.
ISOLDE: Status report building th ISCC meeting CERN, 22 October 2013 Maria Borge, Erwin Siesling.
Magnetic Mitigation - Contents l Magnetic Mitigation General l West Wall Compressors l Rack Room 2 l Magnetic Shielding Yoke Jason Tarrant – Integration.
Budget specification EHN1 Extension: Infrastructure (WG2) Mats Wilhelmsson 17 September 2015.
GIF in EHN1- layout, construction and schedule Adrian Fabich, EN-MEF-LE GIF users meeting, 12 th February 2014.
EHN1 North Wall Dismantling Schedule Bastien Rae.
AWAKE E. Gschwendtner, EATM, 1 July Highlights Since April 2015 Cabling, piping and rack installation campaign for the AWAKE facility has started.
Paolo Guglielmini - TS / CV LHCb Install Meeting - 20/04/2005 LHCb Install Meeting 20/04/05 TS / CV / Detector Cooling Installations.
ILC Test Facility at New Muon Lab (NML) S. Nagaitsev Fermilab April 16, 2007.
Consolidation activities for GS-SE Luigi Scibile GS-SE Accelerator Consolidation Workshop, EDMS:
Integration studies – Part 1 Inner triplet Y. Muttoni TS-ICC-LI 31 July 2008.
1 Mice Collaboration Meeting CM33 Glasgow University 25 th – 29 th June 2012 STFC Daresbury Laboratory Electrical Infrastructure Report Authors : Ian Mullacrane.
8/31/05DR Lynch1 HBD Preparations in the IR Don Lynch.
Functional/Budget specification EHN1 Extension: Infrastructure (WG2) Mats Wilhelmsson EN/MEF 4 November 2015.
Contributions from BE -ABP -ASR -BI -CO DG -RP EN -CV -EL -MEF -STI GS -SEM -ASE IT -CSPH -CMXTE -CRG -EPC -MPE Follow.
ISOLDE: Status report building th ISCC meeting CERN, 24 June 2014 Erwin Siesling, Magda Kowalska.
Layout Experimental hall Final status (?) 3rd HIE ISOLDE Physics Coordination Group meeting CERN, 3 September 2012 HIE-ISOLDE Erwin Siesling.
Contents Jason Tarrant STFC Aim of Presentation to show: l Problem of compressors located at south shield wall l Description of compressor layout and services.
EN-CV Progress EHN1 Extension Project Jérôme Rodary EN-CV-PJ 2016/01/21.
Technical Support /16/08 PHENIX WEEKLY PLANNING 10/16/2008 Don Lynch.
Status of GIF++ Adrian Fabich, Dorothea Pfeiffer, EN-MEF-LE EATM, 27th August 2013.
Neutrino 1 Assembly Process. Neutrino 2 Assembly Process Step 1: Basement I beams positionned and fixed on the ground. Flatness checked.
Accelerator Tunnel Layout (G01) Nick Gazis Senior Mechanical Engineer Review of ESS Accelerator Conventional Facility Design.
Technical Review EHN1 Extension Cooling Systems and Pipework Jérôme Rodary / EN-CV.
Infrastructure EHN1 extension Lau Gatignon, 7 March 2016.
This talk is not a summary of costs for conventional facilities This talk is Review of conventional facilities used by CDF Discussion of status of systems.
GIF++ implementation Adrian Fabich, Sylvain Girod, Dorothea Pfeiffer, EN-MEF-LE GIF++ 3rd users’ meeting, 11th July 2013.
… getting there … 112/02/2014A. Fabich, EN-MEF-LE.
GIF++ implementation Adrian Fabich, Sylvain Girod, EN-MEF-LE Technical meeting with Supplier of Irradiator, 3 rd October 2013.
EN-CV Progress EHN1 Extension Project Jérôme Rodary EN-CV-PJ 2016/01/14.
EN-CV Progress EHN1 Extension Project Jérôme Rodary EN-CV-PJ 2016/02/04.
The Next Generation of a Gamma Irradiation Facility GIF++
Update on the PSB Cooling and Ventilation Systems
NA CONSOLIDATION & SAFETY SYSTEMS
SR1 extension follow up 27-Mar-17 Marco Ciapetti.
Neutrino Platform Proximity Cryogenics 72th EHN1 Cryogenics Integration TE-CRG
CBETA Technical Review
SR1 extension follow up Extract and update of “Minutes of the keep-up meeting for SR1” sent on 27/02/ results from the visits and new requirements.
EHN1 Extension planning
LS1 planning meeting
Proposed New CMS Conference Room on first floor of SHL
Budget specification EHN1 Extension: Infrastructure (WG2)
Heating, Ventilating, and Air Conditioning
CE Status: Activities executed until 03/08 and ongoing
EHN1: CE Integration process updating
PSB/PS/TT2/Linac2-3 YETS 2017–2018 & LS2 preparation meeting
CEDAR Detector Ventilation System Review
NA CONSOLIDATION & SAFETY SYSTEMS
ATLAS ITk CO₂ Cooling pipe routing CO₂ Meeting, 28 June 2016
Extension SR1 WP3 Electrical installations
HIE-ISOLDE Project Status Report
Heating, Ventilating, and Air-Conditioning
The sport hall.
OT Survey & Adjustment Outline: Survey technique at present
Experimental Areas – LS2 planning
Summary of the presentation:
Aziz AMAMOU EACM – 21th May 2019
LINAC 3 Meeting ICL machines Injectors
Linac4 Connection Broken Line 07/08/19
Presentation transcript:

EHN1 Extension North Side wall (Removal of Existing services & platforms) Michael Jeckel & Bastien Rae

North Side Wall

Groups involved EN-CV EN-MEF EN-EL GS-SE IT-CS GS-ASE BE-BI

EN-CV R Floor Cryo line from Saleve side to remove Is disconnect at some point and obviously not in service

EN-MEF Gas Pipework coming from Jura side running along the North wall

EN-CV + EN-MEF Gas looks not used could be remove (Water pipes?) arrive from the gallery, cross the facade and go to the gallery on the other side. Looks not used by counting rooms. Could be rerouted trough the gallery if needed

EN-CV Rack cooling not in use anymore

EN-CV At 5 meter of the wall and used for the cooling of CMS-HCAL of zone 164. Need to be maintained but re-routed

EN-CV + EN-MEF 1st Floor behind counting rooms Chilled water for HVAC unit Exhaust pipe out of use

HVAC system for the counting room EN-CV From water pipe HVAC system for the counting room For the counting room

EN-CV The ventilation system cross the building There is a water pipe around the building.

Maintain functionality but re-route GS-SE Under the roof 2 rain collectors on each side of the building Maintain functionality but re-route

IT-CS R floor Network start point. for counting rooms only?

IT-CS + EN-EL + BE-BI Cables R floor most of cables from the ground floor go to the counting rooms. 4-5 cables continue to infrastructure rooms (HNA-494) which will be not removed.

IT-CS + EN-EL +BE-BI 1st floor Some cable go up to the next floor

IT-CS+EN-EL+BE-BI 2nd floor about 10 cables cross the Lausanne side The others continues on the Jura side

EN-EL + GS-ASE Few others distribution boxes 1st floor behind counting rooms

GS-ASE Alarm box behind counting rooms

GS-ASE Cables for access system

EN-CV + EN-EL + EN-MEF + IT-CS + BE-BI Removing counting rooms Remove Ventilation Electricity Remove Network Remove Beam instrumentation Fire Alarm And…?