CHOOSING THE BEST TECHNOLOGY

Slides:



Advertisements
Similar presentations
©2010 This information is highly confidential and subject to Sprint policies regarding use and is the property of Sprint and/or its relevant affiliates.
Advertisements

What: Bringing the Latest Technology to Consumers in Washington 1 © 2014 AT&T Intellectual Property. All rights reserved. AT&T, Globe logo and other marks.
IPv6 Multihoming Support in the Mobile Internet Presented by Paul Swenson CMSC 681, Fall 2007 Article by M. Bagnulo et. al. and published in the October.
Chris Fagas, March 2006 Cellular / PCS Technology Overview Connecticut Siting Council Cellular Symposium.
© Copyright Alvarion Ltd. Proprietary and Confidential Building a 4G Smart Grid In Rural America Dr. Mo Shakouri Corp Vice President Dr. Mo Shakouri Corp.
VIKAS REDDY BEERAVALLY HETEROGENEOUS NETWORKS. Radio Network Evolution to heterogeneous Todays Networks 2015 Heterogeneous Networks Single Standard Radio.
Zinwave 3000 Wideband Active DAS
Wireless Modems Dan Tolley Director of Business Development ESTeem Wireless Modems Wireless Business Opportunities from the FCC Narrowband Mandate.
COPYRIGHT © 2011 ALCATEL-LUCENT ENTERPRISE. ALL RIGHTS RESERVED. Constructing an In-Building Wireless Strategy.
20101 The Physical Layer Chapter Bandwidth-Limited Signals.
Overview.  UMTS (Universal Mobile Telecommunication System) the third generation mobile communication systems.
Jeremy Mayeres.  Cellphones  1G  2G  3G  4G/IMT-Advanced  LTE  WiMAX  4G Today  Future of 4G  Social/Ethical considerations.
Project Title: Data Access Points in Tiered Wireless Networks PI: Shalinee Kishore, Ph.D. Graduate Assistant: Zhenlei Shen Introduction & Objective In.
© M2Z Networks Inc. All rights reserved. Advances in Wireless Technology and Impacts on Broadband Deployment National Broadband Policy Workshop August.
2 Stefano Agosta CERN IT/Communication Systems High-Speed Mobile Communications in Hostile Environments CHEP 2015 Okinawa 14/04/2015 High-Speed Mobile.
Vision for Health Care Connectivity: Broadband at the Point of Care John Clarey, Chairman National Medical Wireless Broadband Alliance September 15, 2009.
Vick Khalil Mamlouk – VP Sales Middle East and Africa May The Future of Cellular.
IEEE & Priyanka Vanjani CST 554: Short Presentation ASU Id #
Yamuna Dhungana Supervisor : Dr. R.M.A.P. Rajatheva May 16, 2011.
Top Considerations for Selecting Your Industrial Wireless Solution.
Munawwar M. Sohul Dr. Taeyoung Yang Dr. Jeffrey H. Reed a
4-G Cellular Systems. 2 What is 4-G? High data speed: 100 Mbps to 1Gbps anywhere, anytime Enable voice, data and streamed multimedia (enough speed for.
IEEE &
Proprietary and Confidential © Copyright Alvarion Ltd. Optimized 4G Smart Grid Connectivity Eedo Lifshitz Director, Business Development.
WIDEBAND CODE DIVISION MULTIPLE ACCESS & THE CAPACITY IN CODE DIVISION MULTIPLE ACCESS Presented by Maheshwarnath Behary Assisted by Vishwanee Raghoonundun.
Designing for High Density Wireless LANs Last Update Copyright Kenneth M. Chipps Ph.D.
Focus Areas Stay ahead of capacity needs – Network Densification
1. Motorola Confidential Proprietary MOTOROLA, the Stylized M Logo, and MOTOWI4 are registered in the US Patent & Trademark Office. All other product.
CDMA X EV-DO by S.Vidhya. CDMA 2000 CDMA2000 (also known as C2K or IMT Multi ‑ Carrier (IMT ‑ MC)) is a family of 3G[1] mobile technology standards,
In Building Wireless Systems 12/2/2014 Josh Gerst, Vice President – Engineering RF Connect, LLC.
Wireless & Mobile Networks By Dr. Ali Maqousi Feb, 2012.
 First generation systems utilized frequency axis to separate users into different channels  Second generation systems added time axis to increase number.
Communication Protocol Engineering Lab. A Survey Of Converging Solutions For Heterogeneous Mobile IEEE Wireless Communication Magazine December 2014 Minho.
Technology training (Session 6)
Fundamentals of Cellular Networks (Part III)
IBTUF V 3G-4G Upgrade Pathways.
5 G.
Cost Effectively Deploying of Relay Stations (RS) in IEEE 802
Introduction to Project Management
LTE Long Term Evolution
In-Building Northwestern University
“An Eye View On the Future Generation Of Phones”
Product Roadmap & Strategy
Wi-Fi Service Enhancement at CERN
244-6: Higher Generation Wireless Techniques and Networks
Strategy for Complex Networking, IT, & Telecommunication Decisions
Local Multipoint Distribution Service ?
Featuring Integrated Indoor Self-Installed CPE
GSM/Mobile Network in Accident Relief Trains, Railway Factories,
Private GSM/Mobile Network
A New Era in Critical Communications
LTE Long Term Evolution
Long Term Evolution (LTE)
RP Motivation for New WI (RP ): NB-LTE for Low Complexity Radio Access Network for Cellular Internet of Things Alcatel-Lucent, Alcatel-Lucent.
Give priority to your critical communications.
Cloud Testing Shilpi Chugh.
Company Overview Big Green Group® (“BGG”) is led by President and CEO Michael A. Dennis. BGG is headquartered in New Jersey and its business operations.
Mobile Synchronization Trends 4G to 4.5G to 5G
In-Building Public Safety Transformation in In-Building Networks New Tools and Topologies Lead to New Business Models. Mark Parr – CEO
Access for today. Connected for tomorrow.
Security Advantages of Centralized Fiber Networks
Wireless Wide Area Networks 3G/4G - mobile phones.
Wireless Wide Area Networks
Party of Five Brandon Hoffman Kelly Koenig Azam Masood Phil Nwafor
Wireless Performance Prediction – Rationale and Goals
Venue Name: Region/Market: Alternative Coverage Solutions
Supervised By Dr. / Adel Yehia Ezzat
LETI INNOVATION DAYS June 25th of 2019
IEEE Wireless Local Area Networks (RF-LANs)
Presentation transcript:

CHOOSING THE BEST TECHNOLOGY IBTUF V CHOOSING THE BEST TECHNOLOGY

Does One Size fit ALL?

THE CHOICES

COMPARISONS

Keeping pace with the Changes OUR CHALLENGES Keeping pace with the Changes New Equipment New Manufacturers New Spectrums New Technologies New Tools Required Understanding the needs The Service Providers The Venue Avoiding the “Comfort Zone” Remaining “Technology Agnostic”

A Neutral Approach Weighting Preferred Create a Matrix Important Ranking the Equipment is done relative to the needs of your customers. Weighting Preferred Important Required Create a Matrix Product Score Fails Below Average Average Above Average Excellent

UNIVERSITY CAMPUS NEUTRAL HOST DAS PROJECT NEW CONSTRUCTION EXAMPLE UNIVERSITY CAMPUS NEUTRAL HOST DAS PROJECT NEW CONSTRUCTION

Design Approach A Phased Approach Phase I: High Power Outdoor Nodes Designed to provide ALL required outdoor coverage and have the highest possible impact on indoor coverage needs Phase II: In-Door Reinforcements including Public Safety DAS Head End Location Campus MDF (Central To Fiber Plant) WSP Signal Source Remote from DAS Head End OSP Fiber: Provided by Venue from DMark to DMark

Design Block Diagram

Spectrum’s & Technologies Public Safety WSP Spectrums & Technologies AT&T 700MHz – LTE Cell A – GSM & UMTS PCS C4, D – GSM & UMTS AWS Sprint 800/900MHz – iDEN/SMR PCS B – CDMA 2700MHz – WiMax T-Mobile PCS A – GSM Verizon Wireless Cell B – CDMA/1x-EvDo PCS E – 1xEvDo

Equipment Considerations Campus Specific Needed to support all of the waveforms and technologies as listed (VHF, UHF, 700(LTE), CELL, PCS, AWS, WiMax ) Required both High Power Outdoor and Low/Medium Power Indoor modules Minimize DAS Footprint (Head End and Remote Space Restrictions) Support Build Requirements Remote BTS Centralized Head End Multiple Coverage Locations WSP Desires & Considerations Minimize the number of Deployed Technologies Conserve OSP Fiber Separate Paths OR Partitioned Paths

Selecting the Technology No Single Technology Will Do It All !

Selecting the Technology Two Approaches Emerged Layer 1 = Outdoor Layer 2 = Indoor Layer 1 = WSP’s Layer 2 = PS Our Recommendation A for WSP’s and E for PS

INTERNATIONAL AIRPORT NEUTRAL HOST DAS UPGRADE PROJECT EXAMPLE INTERNATIONAL AIRPORT NEUTRAL HOST DAS UPGRADE PROJECT 14

The Issues RISK Existing DAS is no longer supported Spares are not available No Technical or Repair Services are available This is a disaster just waiting to happen! Can’t support Growth Wasn’t able to support entire initial DAS Deployment No power to support additional channels and capacity needs Doesn’t support 4G Technology System is under powered in existing configuration!

Key Considerations Scalability The new equipment needed to be able to support (1) ALL currently deployed technologies, spectrums and channel counts, (2) channel/spectrum growth to support capacity needs and (3) addition of future 4G Technologies Fiber Count We looked for technologies that would not exceed the current fiber availability between the Head End Compound and the Remote Head End. Cabling and Link Budget To avoid the high cost of conduit, we looked for technologies that would be able to use the existing “grandfathered” cabling structure while improving the existing Link Budgets. Schedule Speed is of the essence in eliminating the risk of catastrophic system failure.

A 2 Phased Approach PHASE I Rapid deployment of an equipment change-out for the existing services. Eliminate the Risk of Equipment Failure Improve the existing Link Budgets / System Performance Addition of Capacity Should be handled as a maintenance/repair issue since it is equipment only – no cabling. PHASE II Addition of Equipment and Infrastructure to support 4G Process will require “Full Scale” Design, Engineering, Review, Permitting, Deployment, Optimization & ATP Services Will require additional cabling/conduit layer(s) and Antennas

The Existing Infrastructure 24 Strands of SM Fiber from the Compound to Terminal C 12 Strands of SM Fiber to each Remote 3 Sector Design Each Remote has 6 Coax Ports 4-Low and 2-High

Spectrum’s & Technologies PHASE I PHASE II

Scoring Results ONLY 3 TECHNOLOGIES FIT THE EXISTING CABLE ARCHITECTURE

INTERNATIONAL AIRPORT NEUTRAL HOST DAS NEW CONSTRUCTION EXAMPLE INTERNATIONAL AIRPORT NEUTRAL HOST DAS NEW CONSTRUCTION 21

Venue Considerations Include Public Safety, WiFi 802.11n in non-public space No Outdoor – high power Indicate if analog signal is going to ride on SM fiber Limited Head End and Remote Closet Space Very few IDF/Closets spaced far apart Airport Operates 24/7 UPS Power requirement (KVA load) including back-up batteries Cooling requirement at Head End Airport will own the system Verizon Wireless Confidential and Proprietary Information. Not to be disclosed by LAWA outside of those LAWA employees or agents who have a need to know to conduct an evaluation of the information 22

E911 & LTE MIMO Planning Enhanced Positioning 911 Mandates assessed at the County Level We propose DAS based technology using Co-Pilot Beacons for CDMA systems and LMU’s for GSM systems to facilitate location accuracy to the building of call origin. LTE MIMO VzW is planning the first launch of a 4G LTE Network in the US; this technology embraces a MIMO feature. MIMO requires twice the passive infrastructure of SISO / traditional DAS deployments. MIMO throughput benefit is not known as a function of IB Morphology Types or Antenna configurations. VzW LTE MIMO deployments in the 700 MHz band require special/proprietary survey techniques before they can be justified. Verizon Wireless Confidential and Proprietary Information. Not to be disclosed by LAWA outside of those LAWA employees or agents who have a need to know to conduct an evaluation of the information 23

Performance Criteria Verizon Wireless Confidential and Proprietary Information. Not to be disclosed by LAWA outside of those LAWA employees or agents who have a need to know to conduct an evaluation of the information 24

Link Budget Consideration for existing noise floor and additional DAS created noise is essential in the Design and Deployment phases Verizon Wireless Confidential and Proprietary Information. Not to be disclosed by LAWA outside of those LAWA employees or agents who have a need to know to conduct an evaluation of the information 25 25

Scoring Results

Our Task Stay Informed Know what’s coming from the WSP’s Know what the DAS Manufacturers are offering today AND tomorrow Understand the Project Needs How to take advantage of what the Venue has to offer How to avoid the sensitive or restrictive Venue Elements What the TOTAL technology needs are for both the Venue and the WSP’s Provide an Objective Evaluation of the available DAS choices

Thank You Kern Davis TIME COST QUALITY Communication Technology Services, LLC Major Accounts Manager 864.380.1635 Mobile kcdavis@cts1.com COST TIME QUALITY