2006 NSRS Deployments* * Note: Post PRR650 Implementation (07/01/2006)

Slides:



Advertisements
Similar presentations
EMMS R4 GARF Addendum Ryan Aldridge, ERCOT Wholesale Market Development
Advertisements

P A C I F I C C O N C O U R S E D R. S U I T E L O S A N G E L E S, C A P | F | E I.
1 TAC Review of PRR 650 August 3, Board Charge to TAC Board remanded PRR 650 to TAC for: “an analysis of how to ensure that consumers pay only.
Shaper Adjustment on AR1FS Board AR1 PRR May 25, 2004 (Measurements on Christopher Panel)
© 2014 Cengage Learning. All Rights Reserved. Learning Objective © 2014 Cengage Learning. All Rights Reserved. LO8 Journalize and post the adjusting entries.
Capacity Forecast Report Sean Chang Market Analysis and Design Suresh Pabbisetty CQF, ERP, CSQA Credit CWG/MCWG September 16, 2015 ERCOT Public.
Release Management Configuration management. Release Management Goal Coordinate the processes through the project development life cycle Ensure the.
UFE 2005 Analysis 1 UFE 2005 ANALYSIS Compiled by Load Profiling ERCOT Energy Analysis & Aggregation.
Create Report Entry What if I want to add scores that are not tied to an assignment?
THE WEB CALENDAR PROJECT Presented by: Jasmine Thomas Supervisor: John Ebden.
14 Minute Ramp Period Testing Workshop June 30, 2009.
1 PRR #409 Voltage Support Service from Generating Resources Timeline Date Received 4/25/2003 Date Posted 4/28/2003 Comments Due 5/19/2003 PRS Review Date.
Posting Separate Amounts from a Journal to a General Ledger POSTING TRANSFERRING INFORMATION FROM A JOURNAL ENTRY TO A LEDGER ACCOUNT POSTING.
Analysis for the Determination of X, Y, and Z for Compliance Monitoring NATF.
09/20/20061 RTCA, CAM, and SFT Presented by: John Dumas September 20, 2006.
OOMC and Local RPRS Settlement Alignment January 2007 WMS Meeting Ino Gonzalez ERCOT Settlements.
Capacity Forecast Report Fall Update Sean Chang Market Analysis and Design Suresh Pabbisetty CQF, ERP, CSQA Credit CWG/MCWG December 16, 2015 ERCOT Public.
ERCOT Pilot Project for Fast Responding Regulation Service (FRRS) PDCWG April 26, 2013.
海港自由貿易港區及自由經濟示範區之加值作業
Non-Spin Deployment Resmi Surendran. RUC Awarded Ancillary Service Bring Resources On-Line if awarding REG or RRS When awarding Non-Spin – First award.
QMWG June 2012 Generation Resource Energy and Regulation Deployment Summary.
ADJ 235 Week 3 DQ 1 Post your response to the following: What would you do in this situation? Fully explain your decision. To purchase this material click.
Generation Resource Energy and Regulation Deployment Performance Report for June 2017 QMWG 07/10/2017.
Non-IRR GREDP < 85% August 2017
RTDF Overview of Data Analysis & Status of “Consesus Items”
Real-Time Co-optimization of Energy & Ancillary Services
Configuring and Hosting WCF Services
RMS Enhance ESI-id Look-up Function
Market Notice Regarding Off-line Units
May 2012 Generation Resource Energy and Regulation Deployment Performance QMWG 6/8/2012.
Review of Abnormal MCPEs
Compliance Report to ERCOT TAC February 2007
LESSON 21-1 Accrued Revenue –
During the period Communicate End of period. During the period Communicate End of period.
© 2014 Cengage Learning. All Rights Reserved.
© 2014 Cengage Learning. All Rights Reserved.
© 2014 Cengage Learning. All Rights Reserved.
ERS Update Mark Patterson, ERCOT Demand Side Working Group
Lesson 13-3 Other End-of-Fiscal-Period Work
Completed Accounting Forms and Making Correcting Entries
Completed Accounting Forms and Making Correcting Entries
the benefits of deploying Hosted VOIP
Completed Accounting Forms and Making Correcting Entries
Weighted Interval Scheduling
ADJUSTING ENTRIES RECORDED IN A JOURNAL
Posting to an Accounts Receivable Ledger
LESSON 6-4 Journalizing and Posting Adjusting Entries
Structuring a Co-Located Event Brief
National Ambient Air Quality Standards (NAAQS) Part 5: NAAQS and NSR
Good Documentation Practices
UNC0376S – Increased Choice when applying for NTS Exit Capacity
© 2014 Cengage Learning. All Rights Reserved.
LESSON 11-3 Posting from Journals to a General Ledger
Weighted Interval Scheduling
Planning Adjusting Entries
Entry Guideline Template
LESSON 11-3 Posting from Journals to a General Ledger
© 2014 Cengage Learning. All Rights Reserved.
LESSON 11-3 Posting from Journals to a General Ledger
Completed Accounting Forms and Making Correcting Entries
Posting to an Accounts Receivable Ledger
Thing / Person:____________________ Dates:_________________
Posting to an Accounts Receivable Ledger
Standard Follow Up Procedure
STARTING A NEW PAGE FOR AN ACCOUNT IN A GENERAL LEDGER
Posting to an Accounts Receivable Ledger
ADJUSTING ENTRIES RECORDED IN A JOURNAL
Fig. 6. Begg's funnel plot for publication bias in the selection of studies. The horizontal axis represents the log risk ratio (RR) and the vertical axis.
Presentation transcript:

2006 NSRS Deployments* * Note: Post PRR650 Implementation (07/01/2006)   Date Intervals MW deployed NSRS Avail Reason 1 9/1/2006 4 1250 No log entry 3 810 2 10/15/2006 1129 10/16/2006 977 10/17/2006 207 5 10/18/2006 12 136 163 6 10/26/2006 797 166 153 7 12/9/2006 Adj RRS < 2500 * Note: Post PRR650 Implementation (07/01/2006)

2007 NSRS Deployments

2007 NSRS Deployments

2007 NSRS Deployments

2007 NSRS Deployments

2007 NSRS Deployments

2007 NSRS Deployments

2008 NSRS Deployments

2008 NSRS Deployments

2008 NSRS Deployments

2008 NSRS Deployments