COMPUTER INTEGRATED MANUFACTURING

Slides:



Advertisements
Similar presentations
Lean Manufacturing.
Advertisements

Bringing Sanity to Clinical Work Life Lean in Healthcare Michael Nelson, MD Blue Corn Professional Services, LLC.
CONTINUAL IMPROVEMENT
1.Over Production: Producing more than is needed Over Production: Over Production: 2.Waiting: Idle Time (Down Time) Waiting: 3.Non-Utilized Talents: Under.
JIT, TPS, and Lean Operations
Lean Operations (JIT) Module
Lean Systems Defined Just-in-time (JIT): an older name for lean systems Toyota Production System (TPS): another name for lean systems, specifically as.
Making your Portable Restroom business Lean and mean – How to boost productivity and increase your bottom line.
Just-in-Time and Lean Systems
Lean Operations (JIT) Module
Operations Management Just-in-Time Systems Supplement 12
Chapter 16 - Lean Systems Focus on operations strategy, process, technology, quality, capacity, layout, supply chains, and inventory. Operations systems.
CHAPTER 14 Just-In-Time Systems.
Benefits of Lean Manufacturing: To benefit from Lean Manufacturing, the processes must be maintained consistently and correctly. Everyone involved must.
© ABSL Power Solutions 2007 © STM Quality Limited STM Quality Limited Introduction to Lean Manufacturing TOTAL QUALITY MANAGEMENT Lean Manufacturing.
Operations Management
1 Chapter 16 Just-In-Time Systems. 2 JIT/Lean Production Just-in-time: Repetitive production system in which processing and movement of materials and.
JIT and Lean Operations
1 DSCI 3123 Inputs and Outputs to Aggregate Production Planning Aggregate Production Planning Company Policies Financial Constraints Strategic Objectives.
WASTE REDUCTION AND PRODUCTIVITY IMPROVEMENT
LeanSigma ® Facilitator Training Module 5 – Waste.
Value Analysis/ Flow Analysis
MBA.782.J.I.T.CAJ Operations Management Just-In-Time J.I.T. Philosophy Characteristics of J.I.T. J.I.T. in Services J.I.T. Implementation Issues.
Lean Basics Dewey Warden.
JIT and Lean Operations
New Directions Learning & Development  All Rights Reserved. Lean Your Library: How Lean Six Sigma Strategies Can Improve Operations.
Desigh by Parichat1 JUST IN TIME LIMIT JUST IN TIME JUST ON TIME JUST OUT TIME TIME
LeanSigma ® Fundamentals Module 4 – Specify Value.
Philosophy and Key Concepts
Lean Production (MUDA)
Airbus Production System
(And How to Tame Them) The Seven Deadly Wastes (And How to Tame Them)
Lean Production The elimination of waste in the production process.
Chapter 12 Just-in-Time and Lean Manufacturing. What is JIT? (Just-in-Time) An operations philosophy involving many techniques for improving the effectiveness.
Companies must provide customers with world-class quality, delivery and service. Customers won’t accept anything less. The globalization of markets means.
“Without the Cost of Waste …”
1 What is JIT Inventory? The minimum amount of inventory necessary to keep a perfect system running smoothly Objective is to minimize the stock of parts.
Just-In-Time Systems. JIT/Lean Production Just-in-time: Repetitive production system in which processing and movement of materials and goods occur just.
Operations Management Optimising operations. The aim of an OM system is to extract maximum productivity and quality from the production process. This.
JIT and Lean Operations Group Members:. JIT/Lean Production Just-in-time (JIT): A highly coordinated processing system in which goods move through the.
11-IE IE IE-60  Facilities design for manufacturing systems is extremely important because of the economic dependence of the firm.  Facility.
EMBA-2, BUP EO Just-in-Time / Lean Production.
CHAPTER 15 LEAN SYSTEM. THE CONCEPTS Operation systems that are designed to create efficient processes by taking a total system perspective Known as zero.
8.0 LEAN Chuah Shu Chin B Jennise Tan Teng Teng B Yeow See Leong B
Just In Time ….. Just in Time Philosophy Salient features  The notion of waste in any operating system  JIT as a philosophy of elimination of waste.
16-1 McGraw-Hill/Irwin Operations Management, Seventh Edition, by William J. Stevenson Copyright © 2002 by The McGraw-Hill Companies, Inc. All rights reserved.
LEAN Basics for Offices January 13, WHAT IS “LEAN”? Maximize customer value while minimizing waste.
A SEMINAR ON “LEAN MANUFACTURING”. What is Lean Manufacturing? Lean manufacturing is a comprehensive term referring to manufacturing methodologies based.
Introduction to Motion and Time Study
Mel Wendell – Mountain Pointe High School
Lean Manufacturing Series
Lean operations and JIT
Slide 16.1 Just-In-Time & Waste Reduction. Slide 14.2 What is Just-in-Time?   Management philosophy of continuous and forced problem solving  are needed.
UNIT-III Operations Management PREPARED BY CH. AVINASH.
Lean Manufacturing Basic Overview XYZ Company.
Inputs and Outputs to Aggregate Production Planning
Process Design and Analysis
Introduction to Lean Emily Varnado.
Operations Management
Pricing your Products to be Profitable
Chapter 2 Office and knowledge work
Welcome to my presentation
4.3 Increasing efficiency and productivity
Just-In-Time and Lean Production
MODERN TRENDS IN PRODUCTION ENGINEERING
Lean and Quality Management Basics of Lean Management
Japanese Production Methods
LEAN IMPLEMENTATION Training SUMMARY OF RESULTS
F3 - THE TECHNIQUES AND TOOLS OF QUALITY MANAGEMENT
LEAN PRODUCTION BY Alfredo Moran Johnny Rojas January, 2006.
Presentation transcript:

COMPUTER INTEGRATED MANUFACTURING Unit – I / Topic :8 ME 6703/ CIMS / UNIT- 1

TOPICS TO BE DISCUSSED LEAN PRODUCTION ME 6703/ CIMS / UNIT- 1

DEFINITION It can be defined as an application of mass production in which workers and cells are made more flexible and efficient by adopting methods that reduce waste in all forms. A set of tools and methodologies that aims for continuous elimination of all wastes in the production process. TPS - Toyota ME 6703/ CIMS / UNIT- 1

Objectives of Lean Production Defects & Wastage To reduce defects and unnecessary physical wastage- excess use of raw material inputs, preventable defects, costs associated with reprocessing defective items and unnecessary product characteristics. Cycle times To reduce manufacturing lead times and production cycle times by reducing waiting times between processing stages, process preparation times, product conversion times. Inventory levels Labour Productivity Reducing the idle time of workers, ensuring that when workers are working, effort as productively as possible. Utilization of equipment & space Use equipment and manufacturing space more effectively by eliminating bottlenecks and increase the rate of production through existing equipment, reduce the machine downtime. Flexibility – Minimum change over time and change over cost. Output ME 6703/ CIMS / UNIT- 1

Key Principles of Lean Manufacturing Recognition of waste – what does not create value from the customer(material transport b/w workstations). Standard Processes – sequence, timing, outcome of all actions by workers(workers perform their tasks). Continuous flow – production flow free of bottlenecks, interruption, detours, backflows/waiting – successfully implemented cycle time will be reduced upto 90%. Pull Production – JIT, what is needed, when is needed . Quality at the source – Defects to be eliminated at the source, inspection @ in-line production process. Continuous improvement – High level of worker – continually removing layers of waste as they are uncovered. ME 6703/ CIMS / UNIT- 1

ACTIVITY List out the Tamil words. Tell the correct order of “MEI EZHUTHUKAL”. ME 6703/ CIMS / UNIT- 1

ME 6703/ CIMS / UNIT- 1

Lean Manufacturing Concepts Value Creation & Waste – customer requires and willing to pay for. Value added activities (5%) – transforms materials into exact product that customer requires. Non-Value added activities(60%) – which aren’t required for transforming materials into product that customer requires. Necessary non-value added activities(35%) – High levels of inventory maybe required as buffer stock. Main kind of waste Over production – Unnecessarily producing more than demanded. Defects – Paperwork, Provision of incorrect information about the product, late delivery, production to incorrect specifications. Inventory Transportation – movements of materials that does not add any value to the product, moving b/w workstations. Waiting – idle time for workers or machines due to bottlenecks or inefficient production flow on the factory floor. Motion - Unwanted motions which diverts them from processing work. Correction – rework of the component. Over processing- More processing then customer requirements. Knowledge disconnection – Information isn’t available where/when it is needed. ME 6703/ CIMS / UNIT- 1

Pull production – what is needed, when is needed Continuous Flow – one piece flow/small batch no waiting time b/w production stages. Continuous Improvement / Kaizen – Systematic process for ensuring continuous improvement.(NVA to be eliminated) Worker Improvement – Ideas to eliminate NVA originate with workers involved in those processes. ME 6703/ CIMS / UNIT- 1

MCQ’S ME 6703/ CIMS / UNIT- 1 1)Lean manufacturing is a : a)Fad. b)Method for reducing labor. C)Way to improve customer value d)Efficiency improvement technique. 2)Customer Value is defined as: a)Cost.  b)Delivery. c)Reliability. d)Response. e)All of the above. 3)Cycle time is: a)Elapsed time from customer order to payment  b)Reduced to eliminate jobs. c)The amount of time the machine runs. d)Improved by larger lot sizes. 4)Cycle-time-efficiency is: a)Improved by increasing utilization.  b)The machine cycle divided by number of pieces produced. c)Increased by larger lot size. d)Value-added time over elapsed time. 5)One-piece-flow means: a)Batch.  b)Larger lot sizes. c)One piece moves to the next operation. ME 6703/ CIMS / UNIT- 1

ANSWERS ME 6703/ CIMS / UNIT- 1 1)Lean manufacturing is a : a)Fad. b)Method for reducing labor. C)Way to improve customer value d)Efficiency improvement technique. 2)Customer Value is defined as: a)Cost.  b)Delivery. c)Reliability. d)Response. e)All of the above. 3)Cycle time is: a)Elapsed time from customer order to payment  b)Reduced to eliminate jobs. c)The amount of time the machine runs. d)Improved by larger lot sizes. 4)Cycle-time-efficiency is: a)Improved by increasing utilization.  b)The machine cycle divided by number of pieces produced. c)Increased by larger lot size. d)Value-added time over elapsed time. 5)One-piece-flow means: a)Batch.  b)Larger lot sizes. c)One piece moves to the next operation. ME 6703/ CIMS / UNIT- 1

ME 6703/ CIMS / UNIT- 1