Wire Scanner / A.Demougeot

Slides:



Advertisements
Similar presentations
IEFC Workshop – 22/03/2011 JJ Gras on behalf of BE-BI 1.
Advertisements

FOTO 24/11/2011 PS FWS RELIABILITY 1 IMPROVING THE PS FWS RELIABILITY.
PS wirescanner calibration Student Meeting 10/03/2014 Carolina Bianchini BE-BI-BL.
SPS New Wire Scanner Mechanics Review
Status of vacuum & interconnections of the CLIC main linac modules C. Garion TE/VSC TBMWG, 9 th November 2009.
Beam Wire Scanner for PS/SPS/PSB Update on Motor Supplier Investigations Dmitry Gudkov BE-BI-ML.
Apex Target Marco Oriunno, April 23, Design and fabrication by: Marco Oriunno, Dieter Walz, Jim McDonald, Clive Field, Douglas Higginbotham, and.
Fiber Loss Monitor and Carbon IP Scanner Setup and operational tips August
BWSRE, B.Dehning 1 Bernd Dehning CERN BE-BI
B eam-line O perational S pares S trategy BI equipment status. 27/05/2014 Javier SIMÓN1.
G. Barber Sci-Fi Tracker Progress Ral 28 Oct Progress On The Design Of The Full Tracker Contents:- Recap of New Station Layout Version 2.5 Version.
BWS electronics design status J.Emery & Luca, Pierre-Jean, Emiliano, Jose, Alexander and all past contributors!
A Transverse Profile Imager for SwissFEL Rasmus Ischebeck.
D Walters Undulator Systems – BFW April 30, 2008 Production Status of the Quad Spool J Morgan – Engineer Bellows Module Soon-Hong.
The Stripping Foil Test Stand in the Linac4 Transfer Line
Flying Wire Update Feb 4, TEV E-11H Motor Failure Rotor coil overheated and shorted to ground. Stator Magnets.
Next Steps, Priorities, Strategy for Spares Ray Veness.
G. Ferioli, R. Jung - LHC-BI Review Workshop November 19&20 LHC Screen Profile Monitors G. Ferioli, R. Jung Introduction BTV LHC layout Monitor set-up.
UK Neutrino Factory Meeting Front End Test Stand (F.E.T.S.) Engineering Status by P. Savage 22nd April 2009.
Laser Notcher Status Dave Johnson PIP Meeting June 26,2012.
Beam Wire Scanner for PS/SPS/PSB Mechanical 3D Model Review (for BE/RF-ABP Impedance meeting 02.Nov.2015) Dmitry Gudkov Mechanical Engineer BE/BI-ML.
Status and organization of the H8c area Mirko Berretti 08/07/2015 (with M.Bozzo, N.Minafra, E.Oliveri, X. Pons…)
Challenges in Beam Instrumentation Rhodri Jones (BE/BI) LIU-2011 Event, 25 November 2011, CERN.
Simulation of the new PS EC detector: implementation and results A. Romano, G. Iadarola, G. Rumolo LIU-PS Student Day 20 April 2015.
Beam Wire Scanner for PS/SPS/PSB Current status and Schedule Dmitry Gudkov BE-BI-ML.
New Fast Wire Scanner for Booster Mechanical Design review 2016_01_ /01/19 1 On behalf of: - EN/MME: Alain Demougeot, Nicolas Chritin - BE/BI: Dmitry.
Beam on Target Diagnostics Beam on Target Meeting 2013 March Tom Shea.
AB/BI J. Koopman New WS design - Brain storm session 18/06/2007 1/16 New WS design - Brain storm session.
ESS wire scanner Benjamin Cheymol
THE NEW FAST WIRE SCANNER DESIGN FOR THE PSB
Beam Wire Scanner for PS/SPS/PSB Motor Selection Dmitry Gudkov BE-BI-ML.
1 SLAC RC Status Report 19 July 2010 LHC Collimation Working Group Meeting Jeff Smith/SLAC BNL - FNAL- LBNL - SLAC US LHC Accelerator Research Program.
ESS Front End diagnostic
WP 12.3 Moderator & Reflector Systems D. Lyngh, M. Kickulies, J. Ringnér, J. Jurns, M. Andersson, M. Pucilowski, T. Hedlund, A. Olsson TAC11 Lund, 1 st.
Requirements from BI and new instruments after LS1 LHC Optics Measurement and Correction Review; B.Dehning 1 Bernd Dehning CERN BE/BI
Naming conventions Sub-committee Meeting.
Wim Weterings Remy Noulibos
BWS Design meeting Jose Luis Sirvent PhD. Student XX/03/2014
LIU Wire Scanner Project
CERN – Zanon discussions
LBNF CAD models, Drawings and Component list
Power and control electronics for the new fast wire scanners
Brief Status SPS Prototype PSB Prototype Installed in LS1
Status of the CLIC DR wiggler design and production at BINP
LIU Wire Scanner Milestones June 2017
BI-day 2014, The SEM-grid renovation project Michel Duraffourg
F.E.T.S. Mechanical Engineering Update
BI seminar agenda “Project context and Introduction to the collaboration with the HES-SO”, 10 min, Jonathan Emery, CERN “A Generic and Modular Protocol.
Fast Wire Scanner Prototype Mechanical Design
LIU Beam Wire Scanners: Status and plans for new SPS and PSB BWS
Wire Scanner Mechanics
Status of the BI Work Package in the LIU-PSB frame
Beam Wire Scanner for PSB
Superconducting RF Crab Cavities
Beam Wire Scanners (PS prototype and LIU series)
Beam Gas Ionization Monitor (BGI)
LINAC4 LEBT beam size and emittance diagnostics
High resolution profile measurements
Magnetic gap calculation
Beam Finder Wire Assembly Undulator System
Project planning and status (February 2018)
XFEL Collimation and Beam Switchyard Vacuum Issues
LARP Phase II Secondary Collimator RC1
Transverse emittance measurements
Mechanical Engineering progress for the Front End Test Stand
MEBT FC, WS, SC and EMU Status
BGC Collaboration Meeting –
After service guide for changing PCB
Measurement of the beam (transverse) emittances
PS magnet status D Bodart 25/06/2019.
Presentation transcript:

Wire Scanner / A.Demougeot WIRE SCANNER PROJECT How it works: Scan in H and V axes to create a shower of secondary particules Scintillators to measure and then create a profil of the beam (Old generation still installed) 19/05/2017 Wire Scanner / A.Demougeot

Wire Scanner / A.Demougeot WIRE SCANNER PROJECT New generation: Since 2017 2014-2015 (SPS) 19/05/2017 Wire Scanner / A.Demougeot

Wire Scanner / A.Demougeot WIRE SCANNER PROJECT Concept: Beam Scintillator Encoder Resolver Stator Rotor Optical device Carbon wire Vacuum chamber Forks Beam Optical disk Shaft Beam pipe Ball bearings 19/05/2017 Wire Scanner / A.Demougeot

Wire Scanner / A.Demougeot WIRE SCANNER PROJECT PS Integration: BOOSTER 4 horizontal Wire Scanners 4 vertical Wire Scanners PS 3 horizontal Wire Scanners 2 vertical Wire Scanners SPS 2 horizontal Wire Scanners LHC After LS2 SPS 19/05/2017 Wire Scanner / A.Demougeot

Wire Scanner / A.Demougeot WIRE SCANNER PROJECT Kinematic device assembly: Video Handling device 19/05/2017 Wire Scanner / A.Demougeot

Wire Scanner / A.Demougeot WIRE SCANNER PROJECT Tow main assemblies: Kinematic assembly Main tank Standard components: Same Kinematic components for all Wire Scanners Main tank variant for each line Stepped chamber end Fork Thickness 0.4mm Thickness 0.3mm Fork in titane 3D manufacturing 19/05/2017 Wire Scanner / A.Demougeot

Wire Scanner / A.Demougeot WIRE SCANNER PROJECT Optical device : Optical device (prototype SPS) Optical device Viewport Optic disk shuttle 19/05/2017 Wire Scanner / A.Demougeot

Booster Wire Scanner frame: WIRE SCANNER PROJECT Booster Wire Scanner frame: A new equipment to be integrated: SEM Grid !! Some Wire Scanners to be moved New vacuum chambers More complex frame WS handling new device => Design becomes more complicate 19/05/2017 Wire Scanner / A.Demougeot

Wire Scanner / A.Demougeot WIRE SCANNER PROJECT Planning & conclusion The design of the WS is completed The design of the chassis of the Booster and SPS lines is to be carried out We have spent 1100 hours on this job since 2015 A command of 20 main tanks is ongoing. An invitation to tender is in progress Thank you for your attention 19/05/2017 Wire Scanner / A.Demougeot