S.Movchan Straw manufacturing and QC

Slides:



Advertisements
Similar presentations
1 Ann Van Lysebetten CO 2 cooling experience in the LHCb Vertex Locator Vertex 2007 Lake Placid 24/09/2007.
Advertisements

Purpose Body Making module is designed for bending the laminated foil film in the shape of a tube, for welding the side seam and for cutting bodies with.
Mate Grinder MATE European Dealer Meeting Advantages of Automatic Controlled Punch and Die Grinding More regrinds, accurate material removal Protect.
Update Hardware for conductive cooling of the quench resistors has been fabricated at LBNL. Preparation for installation to start this week. Installation.
ULTRASONIC WELDING.
Bulk Deformation Processes in Metal Forming Chapter 19 Part 1-Rolling
Aluminum bellows for experiments
SERVICE CENTER FACILITIES.
18-Sep-15S.Movchan Straw manufacturing and QC1 Remove metallization from tape by laser. Part 2 laser mode optimization for Hostaphane RNK 2600 samples.
N. Dixon PH / DT Vladimir Elsha JINR Straw working group meeting Monday 6th february 2011 CERN1 Straw Material and development.
1 11/11/2003 NBI Decay Tube and Windows Presentation by Ans Pardons 1 Decay Tube & Windows Introduction (Location, Planning) Decay Tube Entrance.
Non-Arc Welding Processes Resistive heating, chemical reactions, focused light and electrons, sound waves, and friction can also be used to join materials.
16-Oct-15S.Movchan Straw manufacturing and QC1 Straw machine status polished anvil new welding configuration software for on-line seam quality control.
Status of production at LNF E. Dane, C. Forti, D. Pinci, A. Sarti – LHCb Muon CERN 25-may-04 Monday 24-may: closed chamber 30. Will close 2 more this week.
Brick gas tightness & emulsion-lead compatibility Opera Collaboration Meeting Hamburg, June 2004 F.Laudisio, G.Romano, C.Sirignano Salerno Emulsion.
20-Nov-15S.Movchan Straw manufacturing and QC1 Straw machine status straw fabrication option 1: removing metallization from tape edges by laser study straw.
 YE+4 disks = 2 Nos. (12 Sectors each)  Support Structures = 2Nos.  AISI 1045 steel bar = 1 No. for checking dimension of 680 mm (0/-0.5)  Fasteners.
Qualification of the longitudinal weld of thin wall PET tubes of the straw tracker of the NA62 experiment Master thesis presented 28 th of june 2011 by:
Neil Dixon PH/DT CERN 22/03/10 Straw Material Plans Latest news. Latest news. Many tests ongoing at CERN and in JINR in and attempt to validate in and.
Matthew Moulson (Frascati) for the LAV Working Group NA62 Photon-Veto Working Group Meeting CERN, 17 July 2012 LAV construction & installation status.
Straw manufacturing current status T.Enik, S.Shkarovskiy, I.Polenkevich,Yu.Potrebenikov
14-Dec-15S.Movchan Straw manufacturing and QC1 Straw manufacturing procedure and QC tape and straw parameters specification conditions of straw production:
N. Dixon PH / DT CERN 12 July Straw Material, weld line latest news and plans.
Straw manufacturing current status T.Enic, Yu.Potrebenikov
4-Jan-16S.Movchan Straw manufacturing and QC1 Straw tracker manufacturing procedure Dubna: assembly halls procedure conclusion Presented by S.Movchan.
N. Dixon PH / DT Straw working group meeting Monday 14 December 2010 CERN1 Straw Material and development.
Overview of the main events related to TS equipment during 2007 Definition Number and category of the events Events and measures taken for each machine.
DB Current Status Polenkevich Irina. The general requirements on DB Access through the Internet; DB backup to do automatically (once per week);
Bidders Conference Supply of a new control system and ancillary equipment for a Hydraulic Welding Press Friedrich Lackner 10/06/2015 F. Lackner / TE-MSC-LMF.
Objective measurement -basic characters 1. Weight (g/100 cm 2 ) Experimental procedure i) cut 10 pieces of rounded fabric, each piece is 100 cm 2 ii) measure.
26-Feb-16S.Movchan Straw manufacturing and QC1 Dubna NA62 straw tracker assembly area (milestone) halls plans conclusion Presented by S.Movchan.
28-Feb-16S.Movchan Straw manufacturing and QC1 Straw machine status straw welding machine QC by microscope control by computer straw welding speed optimization:
8-Mar-16S.Movchan Straw manufacturing and QC1 Straw machine status 01_09_2010 machine alignment check by laser level control device machine set up after.
8-Mar-16S.Movchan Straw manufacturing and QC1 Straw machine status anvil new welding configuration software for on-line seam quality control conclusion.
Presented by: De Carlo Livio Supervisor: Scheubel Maud Section: EN/MME-MM.
Neil Dixon PH/DT Dubna July 1010 Straw Material latest news and plans 1.
Update: Puck and Gun Magnet March 1, Magnetized Gun 2 K 2 CsSb Preparation Chamber HV Chamber.
10-Jun-16S.Movchan Straw manufacturing and QC1 Straw manufacturing conditions and QC tape and straw parameters specification conditions of straw production.
N. Dixon PH / DT Vladimir Elsha JINR Straw working group meeting Monday 6th April 2011 CERN1 Straw Material and development.
Straw Working group Ferrara 4/9/2014. Outline Status and Plans Installation of Chambers 1-3 Chamber 4 Vacuum test SRB Readout, monitoring and software.
NA 62 – straw detector Content Detector Specifications Chamber design Straw design and specifications Calculations and measurements Prototyping Plans Straw.
Chapter 31 Solid-State Welding Processes
S.Movchan Straw manufacturing and QC
Oleksiy Dolinskyy December 1st, 2014
Quality assurance for Manufacturing Dressed Cavities for SPS prototype cryomodule C. Parente (HL-LHC Technical Quality Officer) Date:
HYDRAULIC TUBING – TRACTORS
Ti/SS transitions A.Basti INFN-PISA*
Production ad Quality control of RPCs for the CMS muon barrel system
new straw end plug: D=10.6 mm straws support frame Levan option
Major challenges in TIG welding of titanium
S.Movchan Straw manufacturing and QC
Quality Control in Straw Production
S.Movchan Straw manufacturing and QC
Cutting and welding First internal LHC Dipole Diode Insulation Consolidation Review 10 Oct 2017 G. Favre / A. Amorim Carvalho G. Favre EN-MME.
S.Movchan Straw manufacturing and QC
Status of straw production straw module assembling
Fabrication of Nb and Cu SPL cavities and required tools CERN status
Cutting and welding First internal LHC Dipole Diode Insulation Consolidation Review 10 Oct 2017 G. Favre / A. Amorim Carvalho G. Favre EN-MME.
SIS100 quadrupole status S. Kostromin, H. Khodzhibagiyan, G. Trubnikov, FAIR 11th MAC, GSI, May,
ERGONOMICS CONTROL.
BULK DEFORMATION PROCESSES IN METALWORKING
STAR TOF MRPC Mass Production & Q.C. (USTC)
IMP Cryomodule Assembly and Alignment
© 2004 – 2011 PAVAC Industries Inc. All rights reserved
P.Fabbricatore & S.Farinon
2300 (11PM) September 21 Blue line is meridian..
February 2007 Note: Source:.
Crab – RFD prototype: Fabrication Status Update
System tests at CEA O. Piquet 19/03/2019
2015 January February March April May June July August September
Presentation transcript:

S.Movchan Straw manufacturing and QC Dubna NA62 straw machines status comparison of 2 machines and status plans Presented by S.Movchan 2-Jun-18 S.Movchan Straw manufacturing and QC

Common view NEW machine Continuous straw fabrication Straw fabrication one by one (machine in operation) 2-Jun-18 S.Movchan Straw manufacturing and QC 2

S.Movchan Straw manufacturing and QC Ultrasonic equipment NEW F=39 kHz F=28 kHz 2-Jun-18 S.Movchan Straw manufacturing and QC 3

S.Movchan Straw manufacturing and QC Sonotrode + anvil 2-Jun-18 S.Movchan Straw manufacturing and QC 4

Operation mode stabilization Check F=(39300±100) Hz + cooling automatic 2-Jun-18 S.Movchan Straw manufacturing and QC 5

S.Movchan Straw manufacturing and QC Tape pretension 2-Jun-18 S.Movchan Straw manufacturing and QC 6

S.Movchan Straw manufacturing and QC Round shape formation by 4 rollers 2-Jun-18 S.Movchan Straw manufacturing and QC 7

S.Movchan Straw manufacturing and QC Straw transportation continuous by shuttle 2-Jun-18 S.Movchan Straw manufacturing and QC 8

Dust remover from anvil by flow of air inside straw: NO flow of air Will be done by: anvil from plastic … + oil less compressor 2-Jun-18 S.Movchan Straw manufacturing and QC 9

S.Movchan Straw manufacturing and QC Straw cutter Straw cut by operator Automatic cut 2-Jun-18 S.Movchan Straw manufacturing and QC 10

Straw remove by operator Straw remover Straw remove by operator automatic 2-Jun-18 S.Movchan Straw manufacturing and QC 11

S.Movchan Straw manufacturing and QC Main controller All operations to do by operator 2-Jun-18 S.Movchan Straw manufacturing and QC 12

Straw seam quality control Will be done the same way 2-Jun-18 S.Movchan Straw manufacturing and QC 13

O-ring sample tensile test Seam quality control O-ring sample tensile test The same Visual check 2-Jun-18 S.Movchan Straw manufacturing and QC 14

Straw bar code + DB The same NA62 straw label: NA62TASTDU003525 NA62 – NA62 experiment TA – Tracker ST - straw DU– JINR, Dubna, Russia SE – Sefar, Swiss 003525 – straw serial # (000001-999999) The same 2-Jun-18 S.Movchan Straw manufacturing and QC 15

S.Movchan Straw manufacturing and QC Plans 1000 straws can be fabricated with “old” straw machine – July-August (urgently needed tape from CERN) NEW straw machine: Tuning – July Tests and improvements - August (add on-line monitoring) Machine certification - end of September - pre-production series: N=100 pc, end of August (1-2 days) - send to CERN – 3 weeks - tests a lot of straws at CERN – 2 weeks - approval Start of straw fabrication – October ? 2-Jun-18 S.Movchan Straw manufacturing and QC 16

Dubna straw mass production & parameters for 806 straws 2-Jun-18 S.Movchan Straw manufacturing and QC 17

Mass-production of 806 straws 2-Jun-18 S.Movchan Straw manufacturing and QC 18

Straw machine parameters after sonotrode reparation: (for straws with serial # ≥180) clean room: T=+(21±1) degree, H=(70±5)% some straw machine parameters: sonotrode angle: about 20 degree anvil diameter: 9.73 mm fixture diameter: 9.90 mm rollers position: right roller – 42/5 mm, left roller – 45/4 mm, gap – 18 mm dust removing from anvil: ON straw welding parameters: ultrasonic generator: clock F=(39750±50) Hz, P = (60÷100) a.u. => about 60% sonotrode head temperature: (27±1) degree (cooling ON) ultrasonic head pressure to tape: 210 g spool pretension: (150-200) g tape friction: (300÷400) g manufacture speed: 7 mm/sec 2-Jun-18 S.Movchan Straw manufacturing and QC 19

S.Movchan Straw manufacturing and QC 806 straws Tapes number Straw tubes A1-9 58 A1-11 73 A1-17 62 A1-10 84 A1-12 77 A1-8 93 A1-18 96 A1-4 98 A1-2 (300 m) 100 A1-7 (180 m) 65 806 ~100 straws/spool 2-Jun-18 S.Movchan Straw manufacturing and QC 20

S.Movchan Straw manufacturing and QC 806 straws BLUE – straw start RED – straw end Each bin=25 straws 2-Jun-18 S.Movchan Straw manufacturing and QC 21

S.Movchan Straw manufacturing and QC 806 straws Min = 1 mm BLUE – straw start RED – straw end 2-Jun-18 S.Movchan Straw manufacturing and QC 22

806 straws: visible track width (track from ultrasonic head on straw) BLUE – straw start RED – straw end W av = 0.725 mm 2-Jun-18 S.Movchan Straw manufacturing and QC 23

S.Movchan Straw manufacturing and QC 806 straws R av = 61.8 Ohm (L=2600 mm) 2-Jun-18 S.Movchan Straw manufacturing and QC 24

S.Movchan Straw manufacturing and QC 806 straws Straws rejection (out of parameter specification): diameter out of specification D=(9.75-9.80) mm – ~ 0.4% ( 3 straws) seam width less than W=0.4 mm – ~ 0.4% ( 3 straws) elongation less than 1 mm – ~ 2.5% (20 straws) ~ 3.3% (26 straws) 2-Jun-18 S.Movchan Straw manufacturing and QC 25

S.Movchan Straw manufacturing and QC Conclusion 806 straws were manufactured (February-April 2011): ~ 20 straws/shift ~ 100 straws per spool (L=300 m). Efficiency of mylar tape used is about 90% Straw parameters: - diameter Dav = 9.78 mm - sample elongation dLav= 7.0 mm (o-ring 5 mm width tensile test) - visible ultrasonic track width Wav=0.725 mm - resistance Rav=61.8 Ohm (L=2600 mm) Straws rejection (out of parameter specification): ~ 3.3% (26 straws) Dubna straw quality is adequate to NA62 requirements 2-Jun-18 S.Movchan Straw manufacturing and QC 26

S.Movchan Straw manufacturing and QC aaa 2-Jun-18 S.Movchan Straw manufacturing and QC 27