F/A-18 Awarded & Pending PBLs

Slides:



Advertisements
Similar presentations
1 Air Force Materiel Command I n t e g r i t y - S e r v i c e - E x c e l l e n c e Developing, Fielding, and Sustaining America’s Aerospace Force OC-ALC/MAN.
Advertisements

1 WARFIGHTER SUPPORT STEWARDSHIP EXCELLENCE WORKFORCE DEVELOPMENT WARFIGHTER-FOCUSED, GLOBALLY RESPONSIVE, FISCALLY RESPONSIBLE SUPPLY CHAIN LEADERSHIP.
DoD Teaming Group E2C2 FST Obsolescence Management Team May 2, 2001
DLA's Aviation Supply & Demand Chain Manager Defense Supply Center Richmond Aviation Engineering Reliability and Sustainment Programs Defense Logistics.
Overall Office Assessment GAR RateRate Current Issues: (results of analysis) Low violent crime rates demonstrate that people living and working on Picatinny.
Single Line of Accounting
Line Efficiency     Percentage Month Today’s Date
1 WARFIGHTER SUPPORT ENHANCEMENT STEWARDSHIP EXCELLENCE WORKFORCE DEVELOPMENT WARFIGHTER-FOCUSED, GLOBALLY RESPONSIVE, FISCALLY RESPONSIBLE SUPPLY CHAIN.
21 ST CENTURY NAVAL AVIATION LOGISTICS PRESENTATION TO: NDIA LOGISTICS CONFERENCE RADM BERT JOHNSTON VICE COMMANDER, NAVAL AIR SYSTEMS COMMAND 2 MARCH.
Birthplace, Home & Future of Aerospace 2014 SECDEF Subsystem PBL of the Year – Sniper Precision Attack Pod 1 DISTRIBUTION STATEMENT A. Approved for public.
Performance Based Logistics: Transformation Through Partnership.
© ABB Group August 13, 2015 | Slide 1 Power Generation Service Life Cycle Management for Power Plants Daniel Looser, Power Gen Europe in Amsterdam, June.
Aircraft Tire PBL Programs
Naval Inventory Control Point 1 PBL Background The Support Spectrum Mini-stock point Commercial Off-the-shelf “Full Service”Contractor Logistics Support.
Naval Inventory Control Point 1 F/A-18E/F Integrated Readiness Support Teaming (FIRST) concept, an alternative support strategy emphasizing Government/Industry.
1 REVIEW OF RAPDRP PART A PROGRESS IN KARNATAKA Aug 2015 RESTRUCTURED ACCELERATED POWER DEVELOPMENT AND REFORMS PROGRAMME (R-APDRP)
AN/ALR-67(V)3 Advanced Special Receiver (ASR) Direct Vendor Delivery Program Presented by: Daniel Buechler ASR R&M IPT Lead (805)
Monthly Management Report May Submitted By Facility Management Team 1 Monthly Report-(Jul 2011)
1 Logistics Conference & Exhibition May 20, 2004.
Performance Based Logistics
Performance Based Logistics and Depot Partnering Lessons Learned Gerald Tonoff – NAVICP 0225 Debra Bautista – Cherry Point Mike Marinshaw – Honeywell TLS.
Dear Customers, In response to your feedback received through the Customer Satisfaction Improvement Programme (CSIP), Airbus Training is pleased to propose.
F/A-18 Awarded & Pending PBLs
1 DLA Aging Systems Program: Technology Investment for Sustainment Cliff Wolfe Program Manager DSCR-VE March 2005.
Capital Asset Pricing Model (CAPM)
Department of Defense PBL Award Winners
Single Line of Accounting
FRCSW Advanced Technology Innovation (ATI) Intermittent Wiring Initiatives Overview 25 July 2017 JTEG Brett Gardner, ATI Avionics STL.
APTA Sustainability Workshop 2016
Overview Software Maintenance and Evolution Definitions
Performance Based Logistics and Depot Partnering Lessons Learned
Jan 2016 Solar Lunar Data.
The Future of the Print Industry – Our Focus
Introducing the Bradford White ICON System™ and Accessory Packages
Project Major Activities Over Next Days (as of xx/xx/xx)
Transforming the Business of Government Through Shared Services JOHN SINDELAR Deputy Associate Administrator United States General Services Administration.
INVENTORY MANAGEMENT Explained By: Sarbjit Kaur.
Single Line of Accounting
USAF CAD/PAD Program Overview
FA-18 E-F (WSDC - VUN) Weapon Systems Performance
APTA Sustainability Workshop 2016
Department of the Navy Performance Based Logistics
Average Monthly Temperature and Rainfall
Overfill Prevention Technology and Maintenance
Performance Based Logistics and Depot Partnering Lessons Learned
Life Cycle Logistics Perspective KC-46 Product Support
80-Hour SHARP Certification Course Schedule
UTShare PeopleSoft Project

O&S COST MANAGEMENT: O&S COST INFLUENCE ON PROGRAMS

Gantt Chart Enter Year Here Activities Jan Feb Mar Apr May Jun Jul Aug
Presentation Title January 3, 2019
Proposed Strategic Planning Process for FY 2013/14 thru FY 2015/16

MONTH CYCLE BEGINS CYCLE ENDS DUE TO FINANCE JUL /2/2015
Electricity Cost and Use – FY 2016 and FY 2017

Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
XRN Feb 19 Minor Release - Status Update
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Minor Release Drop 3 Timeline
Presentation transcript:

F/A-18 Awarded & Pending PBLs HUD/DDI * Rockwell ALE-50 Raytheon LEF Moog/NI/Jax TEF/Stabs Parker Hannifin Fuel Control Honeywell F414 C&A GE F404 GE Awarded PBLs Pending PBLs * Supports Multiple A/C F414 Depot CompGE ARC 210 * Rockwell Turbines * Honeywell SHARP TBD FIRST Boeing: 73% of E/F 3889 E/F WRAs 653 of FIRST Repairables accomplished at I-Level 349 Support Equip. Items 170 DLA Consumables 10,100 Non-DLA Consumables SMS * Smiths JHMCS * VSI APU * Honeywell AESA Boeing SCRI 001 – Pitot Static Probe Completion Mar04 (1st Production Install), SCRI 002 Wingfold Transmission – 31 Mar 04 Compl, SCRI 003 Pressure Regulator Shut Off Valve – Complete 31 Jul 03 (Production Incorp), SCRI 004 Aft Avionic Cooling Fan – On-hold pending BCA outcome, SCRI 010 – FCC OFP BIT improvement 19 Jan 04 go “Green” target, SCRI 012 GCU Reliability Imp - 11 Apr 04 NAVAIR JCCB Go “Green”, SCRI 011 Hook Shank Corrosion – 31 Jul 04 (Production Incorp), SCRI 015 Boarding Ladder – Apr 04 Completion, SCRI 031 Pitot Static Probe Covers – Mar 04 first incorp., SCRI 032 Common Canopy Design - 16 Jan 04 Go “Green” date, SCRI 033 Canopy Glass Optical Repair – Apr 04 Completion, SCRI 039 Damage Repair Analysis S/W – Aug 05 Completion, SCRI 021 DECD Supportability - , SCRI 045 ECS Controller S/W BIT Jun 04. FIRST FY06 and Beyond: F/A-18 A through F EA-18G APG-65/73 AESA FMS DLA Consumables Retrofits Modifications APG-65/73 Boeing ALR-67v3 Raytheon Tires Michelin AMC&D * GD/Honeywell EIBU Smiths SMUG Smiths ALQ-126B * BAE/Jax ATFLIR Raytheon Support Equipment * Multiple OEMs NAVAIR, NAVICP, DLA, and Boeing - One Team Supporting the Warfighter

General Electric’s F404 Performance Availability increased from 42% to 92% in 18 months Excess -400 spares in fleet resulting in reduced requisitions Absorbed all additional requisitions from I Levels TAT reduced by 30% GE advance released significant material for risk reduction Status Aug 03 Status Feb 05 “PBL” High Priority Backorders 436 “7R” High Priority Backorders 560 20 “1R” High Priority Backorders 109 15 “PBL” Total Backorders 781 5 “7R” Total Backorders 1308 45 “1R” Total Backorders 224 27 Three level maintenance (O, I, Organic and Commercial D) NAVAIR, NAVICP, DLA, and Boeing - One Team Supporting the Warfighter

Rockwell’s Displays Performance Current Performance: Status 1 Oct 03 Status 28 Feb 05 AVAILABILITY RATE < 50% 99% BACKORDERS (Excluding QZs) 583 51 DDI & HUD A TOP TEN DEGRADER YES NO Near Term Goals: 100% Availability with no backorders No WRAs being returned to Depot by the Fleet Three level maintenance (O, I, Organic and Commercial D) NAVAIR, NAVICP, DLA, and Boeing - One Team Supporting the Warfighter

Honeywell’s APU Performance Performance Metrics Availability: 97% Average LRT: 5.1 Days Deliveries (WRA & SRA): 250 Depot Work Share (required 25%): 36.2% Reliability Current MTBUR: 1050 FY03 MTBUR: 883 Delta: + 19% Honeywell Directed Change Requests 10 FY00 FY01 FY02 FY03 FY04 FY05 Three level maintenance (O, I, Organic and Commercial D) NAVAIR, NAVICP, DLA, and Boeing - One Team Supporting the Warfighter

Smith’s SMS Performance In Sixth Year of Operation Performance to Date: Backorders reduced from 420 to 0 in under 6 months Supply Availability Performance: 100% Requisitions Received/Shipped: 7900/7900 Fleet Satisfaction: Very High Utilization of Wholesale Assets: Optimized Obsolescence Management: Processed 353 Class II Changes In Process of Adding Control Set Converter to Program Three level maintenance (O, I, Organic and Commercial D) NAVAIR, NAVICP, DLA, and Boeing - One Team Supporting the Warfighter

Boeing’s Supportability Cost Reduction Initiatives (SCRI) $19.8M non-recurring investment driving $430.2M* cost avoidance ECS Controller Software BIT Improvement Common Canopy Design Enhanced Surface Finish Training Damage Repair Analysis Software Tank 3 Fittings AMAD Power Takeoff Shaft Seal Improvement Arresting Hook Shank Corrosion Protection Canopy Glass Optical Repair Improvement Pressure Regulating/Shut Off Valve Redesign Tank 1F Scuff Patch Second Source Displays Horizontal Stabilator Servocylinder Wire Harness Improvement Digital Expandable Color Display (DECD) Supportability Generator Control Unit Reliability Improvement Trailing Edge Flap Servocylinder Wire Harness Improvement Pitot Static Probe Cover Enhancement LCS 3-Way Shutoff Valve Reliability Improvement Wing-fold Transmission Lug Bushings Pitot Static Probe Heater Redesign Boarding Ladder Actuator and Storage Flight Control Computer Maintainability Improvement Boarding Ladder Reliability Improvement Incorporated/Complete Approved / In Work IW/Partial Incorporation Pending Concurrence * Joint NAVAIR, NAVICP and Boeing total cost avoidance validated by AIR-4.2 & Approved 12/6/04 New for 2005 Slide approved by ESC on 6-2-05 NAVAIR, NAVICP, DLA, and Boeing - One Team Supporting the Warfighter