The Smart Way of Managing Aeronautical Information

Slides:



Advertisements
Similar presentations
GIS for Aviation: Case for eTOD Management
Advertisements

Chapter 6 Sub-Group ICAO Headquarters, November 2013
ADQ Implementation Workshop Austro Control – Status and Issues
“Creating e-Freight solutions for efficient and sustainable multimodal transport” Takis Katsoulakos INLECOM eFreight12 Delft -19th April 2012.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-30/PIA-2 Service Improvement through Digital Aeronautical Information.
The European Organisation for the Safety of Air Navigation Digital NOTAM Concept AIXM XML Developers’ Seminar #5 23 March 2010.
Introduction to Digital NOTAM
Exchange 2010 Overview Name Title Group. What You Tell Us Communication overload Globally distributed customers and partners High cost of communications.
V0.2 © 2013 Avitech GmbH Friedrichshafen ● Bratislava ● Frankfurt/Main ● Konstanz ● Madrid Avitech GmbH Exchange Formats and Products The Aeronautical.
Introduction to AIXM. Topics Criticality of AIS information AIM – a “data centric” approach Worldwide interoperability AIXM mission Related developments.
International Civil Aviation Organization AIM - implementation Saulo Da Silva Workshop on preparations for ANConf/12 − ASBU methodology (Bangkok, 14-18/Nadi,
European AIS Database (EAD)
Digital AIM Training - Digital NOTAM
 Cloud computing  Workflow  Workflow lifecycle  Workflow design  Workflow tools : xcp, eucalyptus, open nebula.
European Organisation for the Safety of Air Navigation Initial steps towards digital AIM : D-AIM AIXM5 User group Meeting Washington DC 27 February 2007.
Digital AIM “D-AIM” Sam Van der Stricht EUROCONTROL.
What’s New with AIXM 5. Explaining AIXM 5 Mission and Objectives Coverage of the AIXM 5 data model –Scope of aeronautical information –Emerging “partner”
Aeronautical Information Exchange Model (AIXM). Introduction “Never let an aircraft take you somewhere your brain didn't get to five minutes earlier”
Digital Airport Surface NOTAMs. Introduction What are NOTAMs? –Notices to Airmen (NOTAM) are used to alert pilots about temporary changes affecting the.
1 Digital NOTAM Towards a concept of operations xNOTAM Workshop #2 Brussels, November 2007 Item 2 European Organisation for the Safety of Air Navigation.
Air Operations Division AIM System for ASECNA organisation (17 African countries) Description:  Full AIM solution composed of AIXM / eAIP / Charting /
1 1 Aeronautical Information Services Brief to AIXM User Group 27 February 2007.
Roadmap Phase 2 EAD & AICM By: Eduard Porosnicu, AIM Expert 7-8 October 2009 ACAC – AIM Workshop.
AIXM - purpose, scope, implementation and future evolution.
© LAIC Aktiengesellschaft ATM SYSTEMS OVERVIEW ATRAK-EC / PC (ATC Executive / Planning Control) ATRAK-AIM (Aeronautical Information Management)
The global voice of ATM The Global Voice of ATM CANSO AIM WG Activities Agenda Item - 5: Global strategy/roadmap ICAO AIS-AIM SG3, Montreal, November.
AIS Automation 1. 2 Today AIP - State AAIP - State C State A State BState C AIP - State B State D AIP - State D State E AIP - State E.
AIXM 5 Concepts This presentation is based on the first part of the “AICM and AIXM 5 - Exchange Model goals, requirements and design” document. The purpose.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-30/PIA-2 Service Improvement through Digital Aeronautical Information.
Accurate  Consistent  Compliant Contact: i4i the structured content company the structured content company.
CANSO AIM WG Activities
FIXM briefing for the AIXM CCB Hubert LEPORI EUROCONTROL, ATM/STR/SWM
Introduction to Digital NOTAM
.NET Omid Darroudi.
FF-ICE A CONCEPT TO SUPPORT THE ATM SYSTEM OF THE FUTURE
Digital AIM “D-AIM” Sam Van der Stricht EUROCONTROL
Workshop on preparations for ANConf/12 − ASBU methodology
AERONAUTICAL INFORMATION SERVICES
Distributed Cache Technology in Cloud Computing and its Application in the GIS Software Wang Qi Zhu Yitong Peng Cheng
Amadeus Open Profile Suite
SIP/2012/ASBU/Nairobi-WP/19
Workshop on preparations for ANConf/12 − ASBU methodology
AMHS/SWIM Seminar Chiang Mai, Thailand 5-6 March 2012
AIM Operational Concept
Digital NOTAM Towards a concept of operations
Distribution and components
Chapter 6 Sub-Group ICAO Headquarters, November 2013
Workshop on preparations for ANConf/12 − ASBU methodology
Choosing the Discovery Model Martin Forsberg
Enterprise Service Bus (ESB) (Chapter 9)
AIXM 5 Development Status
Advancing Digital NOTAM implementation
Snowflake Software Helping you “SWIM” into the future
One-Stop Shop Manages All Technical Vendor Data and Documentation and is Globally Deployed Using Microsoft Azure to Support Asset Owners/Operators MICROSOFT.
Amendment 40 to ANNEX 15 Air Navigation Procedures for AIM Seminar
AIS Manual (Doc 8126) Air Navigation Procedures for AIM Seminar
Digital AIM “D-AIM” Sam Van der Stricht EUROCONTROL
e-Invoicing – e-Ordering 20/11/2008
PANS-AIM (Doc 10066) Air Navigation Procedures for AIM Seminar
4/4/2019.
AIMS Equipment & Automation monitoring solution
Digital AIM “D-AIM” Sam Van der Stricht EUROCONTROL
敦群數位科技有限公司(vanGene Digital Inc.) 游家德(Jade Yu.)
Digital NOTAM
Introduction to Digital NOTAM
Sending data to EUROSTAT using STATEL and STADIUM web client
1 Ranjan Senaratne. After studying this session, you will be able to: Explain the responsibilities of the AIS. Identify the users of Aeronautical Information.
Digital AIM Training - Introduction Introduction – day 2
Presentation transcript:

The Smart Way of Managing Aeronautical Information www.smartAIM.net August 2013 Hannes Brunner

smartAIM Architecture Overview

smartAIM Data Flow

Vision – Aeronautical Data Change smartDM and smartWFM Introducing a flexible WFM tool that enables process owners (i.e ANSPs) to design work flows according to their process for the data originators Regulatory Compliance ICAO – Annex 15 , ADQ - Aeronautical Data Quality - Implementation Rules, EC Regulation 73/2010, OJEU – 27th January 2010 Increased Efficiency in AIM Traceability Timeliness Control of the process and documentation Vision – Aeronautical Data Change Graphic source: http://www.eurocontrol.int/sites/default/files/content/documents/information-management/2005-chain-overview.pdf

smartWFM An integrated solution for the data originators to interface with smartDM products according to their unique processes The solution includes: A web service interface to the smartDM for data management AIM customized state-of-the-art WFM forms Full integration of AIM customized WFM forms with: smartAIM DM (AIXM 4.5 or AIXM 5.1 database modules) AIXM features (binding mechanism) AIXM metadata AIXM temporality AIXM slot management (change set) smartAIM common services (i.e authorization, authentication) Full costumer support to design the work flows based on their requirements

smartWFM FREQUENTIS is using a COTS WFM tool customized and integrated into AIM environment Internationalization by: different languages: German, English, French, Italian, Persian language and time-zone per user full Unicode support different calendars and holidays An open, platform- and database-independent system Complex processes, organizations structures, and forms can be modeled Different clients make the system applicable for each workflow application Application integration: consequent use of standards, various interfaces and a rich API makes this task easy. Proved in many projects and application areas

Edit Feature Component

GIS Component Deep Integration with „Edit Feature Component“ View/Edit the Feature that is currently opened in the „Edit Feature Component“ Load surrounded feature to view the feature in its context View the feature evolution over time

GIS Component

GIS Component

Process Viewer Component The process viewer allows viewing (and editing for authorised users) of the Workflow processes.

smartAIP Digital Publication of Aeronautical Information (GIS Charts and electronic AIP)

smartAIP WebClient – Publication Management

smartAIP – data supervisor (2/2) Changes in graphical publications (Charts) can be broken down to Layouts Layers Labels etc.

smartAIP – AIP/eAIP Authoring

smartAIP – eAIP structured mode

smartCharting Digital Chart Production

smartCharting – Chart Production Automatically generated procedure chart

smartCharting – Chart Management en-route Chart – Refresh chart

smartCharting – Chart Management

smartINMO Integrated NOTAM, METEO Operations and Flight Plans

Dynamic Data Short-term information, which may change frequently NOTAM: Notice to Airmen Information to pilots describing changes to static data (e.g. bird swarms, runway closures, runway icing, cranes,…) have a location (may affect an area) and a validity Flight Plans: Describe the route along which a flight will be flown Include information about the timing Include information about the aircraft capabilities and equipment Meteo Information: METAR, TAF, SIGMET: textual information describing the weather situation

smartINMO – Highlights Provides an integrated dynamic data management solution: NOTAM, Flight Plan, METEO Provides Pre-Flight Information Bulletins (PIB) in conjunction with Flight Plans and MET information Offers NOTAM Summaries and other NOTAM Retrieval Functions (PIBs and Profile Management) Provides ICAO 4444 compliant flight plan management (FPL2012) Integrated Web Briefing Applications SNOWIZ, NOTAMWIZ Digital NOTAM

smartINMO – NOTAM and METEO Management Convenient solution for the exchange of NOTAMs in every country linkage of the NOTAM to the 2nd language version as well as the Static Data affected Full integration with smartDM database Automatic processing of checklists and RQN Applies ICAO and OPADD rules for validation Automated forms for NOTAM, SNOWTAM, ASHTAM, SIGMET, AIRMET, METAR, TAF, GAMET, SPECI Digital NOTAM

Digital NOTAM Digital NOTAM is a sub-concept of AIXM 5. It was the main reason for the FAA to support the standard. Digital NOTAM follows a different timeline than the “rest” of AIXM. SWIM will be the transport mechanism. ICAO does not have a standard for it yet. SWIM is only worked no by FAA / Eurocontrol Before the transport issue is finally defined and standardised on a world-wide basis, it is therefore unlikely that a global replacement of traditional NOTAM transmitted via AFTN can be achieved in the foreseeable future.

Digital NOTAM / System NOTAM 26

smartINMO - Combined NOTAM/METEO Briefing

smartINMO - NOTAM Graphical Briefing – 2D

smartINMO - NOTAM Graphical Briefing – 3D 29

smartINMO – Flight Plan Management FPL2012

smartINMO – Flight Plan Management

smartAIM – Internet Briefing (IT infrastructure)

smartAIM – Internet Briefing FPL handling Submission and subsequent management of flight plan proposals Interface between the ARO working with the smartINMO FPLM-Box

smartAIM – Internet Briefing Functions Provision of PIB functionality (Aerodrome, Area, Route, Narrow Route, Point) Pre-configured PIBs PIB Handbook (storing and retrieving previous briefings) METEO support (textual messages): METAR and TAF which are associated with aerodromes and FIR related messages SIGMET and AIRMET AIP Library for AIC, AIP, Charts Static Data search, look-up and retrieval (aerodromes, FIRs and routes) Self Briefing (e.g. for unmanned Flight Service Centres)

smartAIM – Internet Briefing Admin Functions Management of Internet Users: repository of all registered users including their contact details, access permissions and role including email addresses. Statistics on Internet Service Usage: Both, individual statistics per user (how often has a specific user used which part of the application

smartAIM – Internet Briefing Customization Look & Feel of Internet Briefing Application can be customised Reflects any corporate identity typical for the client For ANSP’s, which require national language support, the support for additional languages can be provided Option: HTML layout for mobile browsers (e.g. IOS or ANDROID)

smartMessenger Transporting the AIM data

smartMessenger – Highlights Supports ALL Message Formats (AMHS, AFTN, CIDIN, SITA) and Communication protocols and interfaces used in aeronautical community Fully integrated with smartAIM High Performance and High Availability system Fully scalable Seamless interoperability with other global messaging services (ie. Internet, WMO) Mature Solution (Fully Tested) Compliance with International Standards

smartMessenger – Highlights Protection of the investment by using a fully compliant solution with international standards Projects are deployed in time – even fast deployments are guaranteed Transition support from AFTN to AMHS to ensure smooth migrations for our clients Guaranteed performance and re-use of existing infrastructure, message formats and protocols Easy to operate by using a modern and state of the art User Agent with intuitive look & feel Reliable messaging and high availability 24 hours a day, 365 days a year without loss of messages High speed queuing system for routing AFTN, CIDIN, SITA and WMO messages Fast X.400 MTA data exchange between different users of the air transport industry