ELENA installation and commissioning status

Slides:



Advertisements
Similar presentations
M. Jimenez AT/VAC Room Temperature (LSS) Vacuum Systems M. Jimenez.
Advertisements

Progress and Plan for Superconducting RF Cavity RF Group.
ILCTA_NML Progress at Fermilab Jerry Leibfritz September 10, 2007.
LHC Machine Status Report Roberto Saban LHCC June 4 th 2014.
HERA Week 50 Nov-Dec Running Shut-down at the end of the year Startup in January January-February Running.
FAIR PROJECT COST BOOK. FAIR cost 1.2 mld euro 1. Civil construction and infrastructure 322Meuro 2. Accelerator systems 592 Meuro 3. Experimental facilities.
Integration, Installation & Infrastructure Ans Pardons, with input from the WP4 members September 2014.
Injectors & LHC report K. Foraz on behalf of OSS members 14/06/2013LSC - K. Foraz1.
The Stripping Foil Test Stand in the Linac4 Transfer Line
Lau and Niels, NA62 TD meeting, 17 March Complete the crane consolidation in TCC8 Reinstall front-end after alignment checks Consolidation of T10.
Work Effort in the LHC Injector Complex for the Upgrade Scenarios B. Mikulec Thanks to all the valuable input from the LIU project leaders and LIU work-
Booster and Collider SC magnets. Design & prototyping of UHV and cryostat systems for Booster and Collider A.Smirnov JINR, Dubna, Russia NICA Machine Advisory.
ELENA Project GBAR Experimental area L ayout / time scales / questions F. Butin / ELENA collaboration.
Target tests 1 st – 2 nd Nov. Chris Booth Sheffield 7 th December 2006.
Status of the ELENA transfer lines with special consideration of vacuum, hand-over optics and beam time distribution after 2017 W. Bartmann, D. Barna,
ELENA Hardware Baseline Current Document Status T. Birtwistle EN-MEF-DC.
AD/ELENA (B193) Integration and constraints F. BUTIN / ELENA collaboration.
Vacuum chamber fabrication Dates refer to end of fabrication, then 8 weeks are to be added for NEG coating, bake-out, acceptance tests, etc. EN-MME LNR.
ELENA EXTRACTION LINES W. Bartmann, D. Barna, M. Fraser, J. Jentzsch, R. Ostojic ELENA Commissioning discussion, 23th November, 2015.
Horst Breuker Review Oct ELENA Safety and Radio Protection ELENA TDR : Chapter 6; Safety Files in preparation; Descriptive, Demonstrative (Risk.
PSB H- injection concept J.Borburgh, C.Bracco, C.Carli, B.Goddard, M.Hourican, B.Mikulec, W.Weterings,
MEF - Machines & Experimental Facilities March 2013 Project meeting Activities in Linac4 tunnel and building in 2013 March 2013 Project meeting 14/03/2013J.Coupard1.
INJECTORS BLM SYSTEM: PROGRESS REPORT Christos Zamantzas on behalf of the BLM team. MSWG 28/08/2015.
13 January 2005 PS&SPS DAYS How can we restart AD in 2006? Slide 1 How can we restart AD in 2006 ? Tommy Eriksson AB/OP/AD.
ASTRID2 Niels Hertel Nov 2012 AARHUS UNIVERSITET ASTRID2 – Status ESLS XX Berlin 2012 Niels Hertel ISA, Aarhus University, Denmark 1.
Reminder of upcoming milestones For all machines: Nov. 2012:Table of performance parameters Jan. 2013: Baseline activities defined Feb. 2013: Update APT/EVM.
ELENA Layout Naming Convention F. Butin / ELENA collaboration.
Proton PMG September 3 rd 2015 Cons Gattuso AD Shutdown Manager.
ILCTA_NML Progress at Fermilab Jerry Leibfritz August 16, 2007.
Cost and schedule for ELENA Beam Transfer Systems W. Bartmann, J. Borburgh, E. Carlier, L. Ducimetiere, T. Fowler, M. Hourican, R. Ostojic, L. Sermeus.
ELENA installation progress F. Butin / ELENA collaboration.
LS1 Day: The Injectors S. Baird EN/MEF Thanks to R Brown, N Gilbert, D McFarlane & V Chohan, IEFC workshop…. LS1 Day: The Injectors 1.
Steering committee ELENA Project Structure S. Maury, project leader C. Carli, deputy project leader Beam physics and Performance Committee (G. Tranquille,
Infrastructure status and plans at CERN 1) W. Weingarten/CERN TTC Milano 28 February - 3 March W. Weingarten/CERN 1)Most of the slides are based.
ELENA Integration F. Butin / ELENA collaboration.
Report Technical Director Storage-Ring-Installation Completed
Vacuum System P. Chiggiato TE-VSC
Preparation Phase of the FAIR Project
Report Technical Director Storage-Ring-Installation Completed
ELENA – Vacuum chambers and vacuum activities
Francois and Lau EATM 17 July 2012
CLEX Building Layout, Conventional Facilities, TL2, TL2’,
EYETS David Hay EN-OSS.
Jorge Sánchez-Quesada BE-RF-FB
Installations up to Start of Commissioning
CLEX* Status and Plans CTF3 complex CLEX
AD consolidation activities in LS2
Configuration Management and Layout Database ELENA Project
ELENA Beam Transfer Workpackage
on behalf of the RF group
ELENA Overview and Layout Start of ELENA Commissioning Next Steps
BE/RF-IS Contribution to LIU C. Rossi and M. Paoluzzi
News from Projects Lau Gatignon / EN-EA Input from F.Butin, Q.Bouirek
Status of the BI Work Package in the LIU-PSB frame
ELENA electron cooler and SEM grids status
Teleconference ACS – FREIA 31st October 2017
SPS Planning for the EYETS Meeting 8 (07/12/2016)
ELENA Technical Coordination
Summary of ECRs for the YETS Booster, PS, ISOLDE and associated transfer lines (LIU + Consolidation) T. Birtwistle (EN-MEF-DC)
YETS PS + PS SWY + TT2 Facility Coordinator:
How can we restart AD in 2006 ? Tommy Eriksson AB/OP/AD
Machine Protection Xu Hongliang.
ELENA Extra Low ENergy Antiproton Ring
Petra Schütt Operateurs-Schulung
Experimental Areas – LS2 planning
Two-beam Test-stand Design and Construction Status
ThomX – Commissioning Meeting – 25/01/2018
Hardware Commissioning
ELENA beam commissioning
Linac4 Connection Broken Line 07/08/19
Presentation transcript:

ELENA installation and commissioning status ADUC meeting, 17 Jan 2017 ELENA installation and commissioning status   F. Butin / ELENA collaboration

Infrastructure installation Infrastructure installation is complete: Racks installation complete in AD hall and power room Signal cables and connectors installation complete AC powering to racks and around ring complete Optical fibers installation complete IT connections complete Shielding elements installation complete RP equipment complete Access system operational Support and access structures installation complete Power converters installation complete F. Butin / ELENA collaboration

F. Butin/ ELENA collaboration 06/01/2017 F. Butin/ ELENA collaboration

F. Butin / ELENA collaboration Machine ring elements All machine ring elements are installed, but: Electron cooler: See G. Tranquille’s talk for details Correction dipoles: 8 out of 10 installed (completion expected 25th January, alignment to follow). Can be fitted around beam pipe without perturbation 2 additional correction dipoles will come with e-cooler F. Butin / ELENA collaboration

Transfer lines (Phase 1): LNS Injection line from source: complete, SEM not yet complete, only 4 channels connected LNI injection line from AD: complete, but 2 SEM missing (being assembled) LNE00 ejection line: 3 SEM +1 LPU missing (availability TBC, internal electric problem) LNE50 ejection line to GBAR: 2 SEM, 1 LPU missing (being repaired, availability TBC), will be replaced by beam tube if needed All transfer lines are leak-tight and remain to be vacuum baked-out F. Butin / ELENA collaboration

Main problems encountered Vacuum elements availability (bending magnet chambers and supports, LNS pumping chamber, ECR fast valves etc.) NEG coating issues (LPU, BPM, kicker) Injection kicker external and internal (virtual) vacuum leaks: vacuum level now nearing 6.10-11 mbar… SEM production delays, cleanliness, read-out availability Correction dipoles production delays (complex H/V combined design). Electron cooler magnetic system production and testing F. Butin / ELENA collaboration

ELENA Commissioning status First completed turn in ELENA ring on Friday 18/11 Many systems working well from the start w. minor debugging; Source incl. controls, timing, cycle editor, BTV:s, vacuum, access system, OASIS, scraper movement, BPM:s etc…. LNR3 BPM signal 7 ms Courtesy T. Eriksson F. Butin / ELENA collaboration

ELENA commissioning status After further tuning, beam is injected and can be observed on BPM:s for 1-2 ms on Wednesday 23/11 Until ion source insulator broke on 25th Nov… No more beam till 13th Feb 2017 LNR6 BPM signal 0,4 ms F. Butin / ELENA collaboration Courtesy T. Eriksson

GBAR experimental area Infrastructure installation in progress: LINAC bunker installed, waiting for LINAC to close roof, Paint job will be completed then, Safety grid to be added over access point Racks installed Cables trays installed Cabling ongoing (RP, access control, LINAC alim..) Cooling water piping ongoing Access control system in place Shielding complete F. Butin / ELENA collaboration

LINAC bunker installation status F. Butin / ELENA collaboration

F. Butin / ELENA collaboration Transfer lines phase 2 Transfer lines installation planned for LS2 (as of December 2018) Proposed planning entered in PLAN, waiting for confirmation from service groups Pending question: fast valves for experiments protection ? ? F. Butin / ELENA collaboration

Transfer lines fast valves LNE 01 LNE 06 LNE 04 (1) LNE 04 (2) LNE 07 First proposal, to be discussed further ! Financing expected from concerned experiments… F. Butin, D. Brethoux / ELENA collaboration

F. Butin / ELENA collaboration Conclusions 1 Infrastructure installation was complete, in time Installation of injection line inside AD shielding was performed during 2016 YETS in time Ion source was available in time Some ring elements production, vacuum system and SEM monitoring encountered issues, resulting in a 4 months delay on commissioning start First H- injected beam on 16th Nov, circulating beams observed on 18th Nov, max ~500 turns… Electron cooling process to be tested spring 2017 Big thank you to the whole installation team ! F. Butin / ELENA collaboration

F. Butin / ELENA collaboration Conclusions 2 GBAR infrastructure progressing well, expected to be complete for LINAC delivery (30th January) Bunker ready to host LINAC and Klystron No noticeable impact on AD alignment ELENA Extraction line LNE expected to be ready in March 2017 All remaining transfer lines installation planned for LS2, fast valves integration/financing to be agreed F. Butin / ELENA collaboration