US 92 Pedestrian Connectivity & Safety Assessment Study

Slides:



Advertisements
Similar presentations
WASHOE COUNTY TRAFFIC ANALYSIS WORKSHOP FEBRUARY 19, 2008.
Advertisements

Louisiana Safe Routes To School Program
January 8, 2014 FMATS College Road Corridor Study FMATS Technical Committee Update.
Tower Road Enhancement Project Prepared for Alachua County By Causseaux & Ellington, Inc. Alachua County Roadway Network Improvements.
Southern Corridor Study Recommendations March 16, 2011.
Facilities & Campus Planning North Pleasant Street Improvement Plan Faculty Senate – February 28, 2008.
An Integral Perspective on the S.E. 17 Corridor October 29, 2013 Calgary.
Florida Department of Transportation, November 2009
Advancing Active Transportation In Toronto ACT Canada Sustainable Mobility and Healthy Communities Summit December 2, 2014 Carol Mee, Toronto Public Health.
Tysons 1 Operational Analysis of Dulles Toll Road Ramps to Tysons Board Transportation Committee Meeting September 17, 2013 Seyed Nabavi Fairfax County.
SUISUN CITY Suisun City Planned Development Area Connectivity for a Better Community.
Plan Purpose:  To provide pedestrian environments that are safe, attractive, and accessible to community institutions, employment and retail services.
Bicycle and Pedestrian Funding Overview NYS Bicycle and Pedestrian Advisory Council August 2, 2010 Albany, New York.
1 City of Rapid City and Rapid City Community Planning RAPID CITY BICYCLE AND PEDESTRIAN MASTER PLAN in collaboration with: Kadrmas, Lee and Jackson RDG.
Hillsborough County Walk/Bike Action Safety Plan Hillsborough County MPO Prepared for: Prepared by: Hillsborough County Bicycle/Pedestrian Advisory Committee.
History of US Bicycle Routes In 1970’s interest in long distance bicycle travel proliferates.
Utah Collaborative Active Transportation Study.  Regional Collaboration.
Multimodal Corridor Plan BCC Discussion Item Transportation Planning Division August 19, 2014.
1 Item 11: Review of Draft Bicycle and Pedestrian Plan for the National Capital Region Michael Farrell TPB Staff Presentation to the Transportation Planning.
Public Comment Mobility Vision Plan 2035 MVP Website 2035 MVP Brochure and Survey. Provides specific information on the Plan Update. Survey – your opinion.
SR 436 / SR 50 Area Redevelopment Plan Board of County Commissioners February 24, 2009 Board of County Commissioners February 24, 2009.
Sustainable Transportation Design Project: Proposed Changes to Belmont/Morrison Couplet By: Bryan Blanc, Marisa DeMull, Andy Kading.
Regional Trails Corridor Assessment. Project Goals »Complete the regional trails network in the TPO Planning Area and advance the Florida Greenways and.
What is a TSP? Provides City with guidance for operating and improving a multimodal transportation system Focuses on priority projects, policies, and programs.
Titusville to Edgewater Bike Loop PD&E Study FDOT Project Number: Volusia County, Florida FDOT Project Number: Brevard County,
Complete Streets Training
East-West Corridor Connectivity Study – Study Recommendations November 17, 2009.
Livingston County Transportation Connectivity Plan Final Report December 2013.
District VI, Florida Department of Transportation SE 2 nd Avenue and SE 4 th Street/Biscayne Boulevard Way March 25 th, 2014 Bicycle/Pedestrian Advisory.
Federal Highway Administration University Course on Bicycle and Pedestrian Transportation Publication No. FHWA-HRT Bicycle and Pedestrian Planning.
A presentation by Kittelson & Associates, Inc. Broward Boulevard Presentation to the Broward MPO TCC and CIR March 2012 Agenda Item NA-1, Attachment.
2040 LONG RANGE PLAN UPDATE Congestion Management Process Plan (CMPP) Major Update February 24, 2016.
City of Belmont Comprehensive Bicycle and Pedestrian Plan Parks and Recreation Commission Meeting 11/4/2015.
Rock Creek East II Livability Study April 28, 2016.
Rock Creek East II Livability Study
Urban Street Design Standards Overview of Project and Details
NE Pasco (The Hills) Multimodal Safety Action Plan Pasco County, FL
A Presentation to: River to Sea TPO Board October 26, 2016.
Hesperian Boulevard Corridor Improvement Project San Lorenzo
S.R. 44 Corridor Management Plan S.R. 44 Corridor Management Plan
Pedestrian Safety & Mobility Study
A Presentation to: River to Sea TPO BPAC November 9, 2016.
River to Sea TPO - CAC/TCC
North Lamar Boulevard Project
Transit Development Design Guidelines Update May 2016
Montgomery County Bus Stop Improvements Program
BELLE TERRE BLVD/PKWY CORRIDOR COMMUNITY DEVELOPMENT DEPARTMENT
2010 Regional Intelligent Transportation Systems Plan: 2017 Progress Report on Implementation The Florida-Alabama, Okaloosa-Walton, and Bay County Transportation.
Waltham Road (Andover – North Star).
Nolanville Main Street Sidewalk & Bicycle Connectivity
SR 60/Kennedy Boulevard and Jackson Street Resurfacing Projects
River to Sea TPO Meeting US 92/International Speedway Boulevard
US 92 Pedestrian Connectivity & Safety Assessment Study
Transportation Alternatives (TA) Set-aside
Citrus Park Drive Extension
Bicycle and Pedestrian Plan Vision/Goals/Objectives
SANDY SPRINGS CITY COUNCIL MEETING
City of Wilmington Bike Plan Update
Lyle Parkway to SR 540 (Winter Lake Road)
TELL THE TPO Community Transportation Survey
Committee Update August 27, 2018.
Orange Grove Boulevard Complete Streets Project
Protected Bicycle Lanes Finally Pedal Their Way to KC…
MPO Board Presentation
Alex Henry FDOT District Seven Safety Office
STATE ROAD 61/369 CRAWFORDVILLE HIGHWAY
Interlocal Cooperative Agreement FY 20
New Hanover Comprehensive Plan
Project Location: 35th Ave HSIP8
West Cervantes Traffic Feasibility Study Jill Lavender, Transportation Planner Cory Wilkinson, AICP CEP, Project Manager Mary Morgan, PE, Engineer.
Presentation transcript:

US 92 Pedestrian Connectivity & Safety Assessment Study Study Overview February 10, 2016

US 92 Pedestrian Connectivity & Safety Assessment Purpose and Need To identify existing pedestrian facilities along US 92/ISB and neighboring roadways that connect to specific pedestrian-generating development Determine improvements needed for enhanced pedestrian connectivity and safety Identify funding options for implementation strategies Prioritize improvements needed for enhanced pedestrian connectivity and safety Cyclist on International Speedway Boulevard Transit stop on Dunn Avenue US 92 Pedestrian Connectivity & Safety Assessment

Study Area Map I-95 (west) to SR 5A/Nova Road (east) US 92 Pedestrian Connectivity & Safety Assessment

What We Found Summary of Issues & Constraints Limited bicycle parking facilities Bicyclists observed using sidewalks instead of designated bike lanes Limited or no shade trees along sidewalks Lack of sidewalk continuity Majority of crosswalks are unmarked Lack of pedestrian refuges at traffic signals Sidewalks are disconnected from adjacent land uses Many bus stops lack amenities Transit stop on Thames Road US 92 Pedestrian Connectivity & Safety Assessment

US 92 Pedestrian Connectivity & Safety Assessment What Was Accomplished Project Deliverables Recommended Improvement Prioritization Criteria based on the 2014 Volusia County ADA Transition Plan Recommended Improvements Prioritization and Cost Estimate Matrix Conceptual Design Criteria to guide future safety enhancements and bicycle/pedestrian improvements Cyclist on International Speedway Boulevard US 92/International Speedway Blvd. US 92 Pedestrian Connectivity & Safety Assessment

What We’re Doing Now Phase II Study Area (Nova Road to SR A1A/Atlantic Avenue) US 92 Pedestrian Connectivity & Safety Assessment

Planning Project Manager FL Dept. of Transportation US 92 Pedestrian Connectivity & Safety Assessment Study Judy Pizzo, MS Planning Project Manager FL Dept. of Transportation 386-943-5167 Judy.Pizzo@DOT.State.FL.US February 10, 2016