Galt WWTP Clarifier Renewal Program

Slides:



Advertisements
Similar presentations
Risk Analysis Fundamentals and Application Robert L. Griffin International Plant Protection Convention Food and Agriculture Organization of the UN.
Advertisements

The real cost of modernisation Phil Hoare Head of Customer Support.
Risk-Based Asset Management
See the Present… Know the Future…. RECAPP ® Markets Telecom Facilities Municipalities Government Transportation.
Maintenance At Your WWTP August 2010
Preventive Maintenance
Module 3 UNIT I " Copyright 2002, Information Spectrum, Inc. All Rights Reserved." INTRODUCTION TO RCM RCM TERMINOLOGY AND CONCEPTS.
UK WIR The UK Experience Christopher Royce Anglian Water Services.
Application of Asset Management Principles During Asset Creation and Design Presented By Pervaiz Anwar at: CWEA, San Francisco Bay Section Asset Management.
Unit III Module 4 - Hard Time Task
Integrating work flows of five utilities utilizing Oracle’s WAM
10.5 Report Performance The process of collecting and distributing performance information, including status reports, progress measurements and forecasts.
Lucas Phillips Anurag Nanajipuram FAILURE MODE AND EFFECT ANALYSIS.
Chapter 2 A Strategy for the Appraisal of Public Sector Investments.
Privileged and Confidential Strategic Approach to Asset Management Presented to October Urban Water Council Regional Seminar.
1 BUSINESS CONTINUITY AND DISASTER RECOVERY PLANNING Reducing your Risk Profile MIDWEST DATA RECOVERY INC.
RAM Modelling in the Project Design Phase Friday 30 th April, 2010 Paul Websdane Reliability Modelling for Business Decisions Asset Management Council.
An Introduction to AlarmInsight
Long Range Infrastructure Planning The Gilbert, Arizona Experience Kenneth C. Morgan, PE Public Works Director.
Office of Facilities Deferred Maintenance UTSA Strategic Resource Planning Council Deferred Maintenance UTSA Strategic Resource Planning Council March.
ea technology Effective Condition Assessment of MV Switchgear
Chief Operating Officers & Facilities Directors Orlando, Florida April 17, 2013 Reversing the Decay Cycle of School Buildings.
Project Management April 28, 2008 Eric Verzuh Project Management April 28, 2008 Eric Verzuh.
October 22, 2004 Holistic Asset Management – It’s Not an Isolated Function 2004 Urban Water Council US. Conference of Mayors.
Proposed Supply Chain Risk Management Process Flow Supply Chain Risk Leadership Council 20 April 2009 DRAFT.
Asset Management in Action: Use of a Triple Bottom Line Approach to Prioritize Capital Improvement Needs Richard Cuthbert R. W. Beck, Inc.
Presentation on Preventive Maintenance
Margin Management. PAGE 2 Margin Management Plant Shutdowns 1.Late 1990’s – numerous “surprise” long-term plant shutdowns 2.Shutdowns resulted when a.
1 Community Asset Management Program (CAMP) Asset Management GFOA Presentation April 3, 2007 Step 3 Visioning Step 4 Design Step 5 Pilot/Rollout “As Is”,
Glen Fields - Final Project Presentation. What Sets CSI Apart... GBA 573 Consultants Company Background Located in San Diego, CA 5 Engineering Consultants.
Practical Investment Assurance Framework PIAF Copyright © 2009 Group Joy Pty. Ltd. All rights reserved. Recommended for C- Level Executives.
Risk Analysis for Major Rehabilitation. Major Rehabilitation Background  Prior to FY 1992  Funded under Operation and Maintenance, General, Appropriation.
NC AWWA-WEA 95th Annual Conference
Modern Maintenance. Management
Continual Service Improvement Methods & Techniques.
1 Develop Policy & Procedures for the: Maintenance & Repairs of Property and Plant Establish & implement systems to monitor condition of assets THHGGA08B.
Equipment Life Optimization Program (ELOP) Doug Hilleman February 10, 2011.
Portfolio-Based Roof Management How to Get More Service Life and Energy from your Roof Portfolio.
Department of Defense Voluntary Protection Programs Center of Excellence Development, Validation, Implementation and Enhancement for a Voluntary Protection.
ON “SOFTWARE ENGINEERING” SUBJECT TOPIC “RISK ANALYSIS AND MANAGEMENT” MASTER OF COMPUTER APPLICATION (5th Semester) Presented by: ANOOP GANGWAR SRMSCET,
Trigo White Ltd Practical project risk assessment VIII Conferencia Internacional Hotel Tivoli Oriente, Lisbon 28 th November 2014 Simon White Consultant,
Review of the water industry UKWIR project – when to repair, refurb or replace assets ICS Consulting November 2011 :diagnostics/ :transformation/ :investment.
Grace McLenaghan Asset Management Reporting at the Region of Peel
Asset Management in the Arab Region and its Role in Improved Performance and Utility Efficiency Lina Sheqem Cowater International.
Role of O&M in Asset Management
Parts Management Agreements
Maintenance strategies
Capital Planning & Risk Management
Ensuring Value for Money Asset Management Project at American Samoa Power Authority By William Spitzenberg (ASPA) and Richard Taylor (Thomas Civil.
Level of Service and Risk: What’s the Connection?
ANALYTICAL METHODS IN MAINTENANCE
Benefit: Cost Ratio.
City of Vaughan | Corporate Asset Management Strategy
Asset Management - From Theory to Implementation
Duffin Creek WPCP Optimized Renewal Planning & Decision-Making
100% Exam Passing Guarantee & Money Back Assurance
Implementing Effective Energy O&M Strategies on a Limited Budget
15S Maintenance.
Total Productive Maintenance and Maintenance Management
HSE Case: Risk Based Approach.
GE 6757 TOTAL QUALITY MANAGEMENT
Village of Ruidoso Water and Wastewater Systems
What is the State of Asset Management?
AWWA Leadership Forum ASSET MANAGEMENT November 14, 2017.
Costing Process in support of CFO Attestation
Unit I Module 3 - RCM Terminology and Concepts
Managed Content Services
Operationalization of a Public Works AM Strategy
Asset condition and priority in Maximo
Capital Asset Management
Presentation transcript:

Galt WWTP Clarifier Renewal Program Richard Pinder Region of Waterloo, Senior Project Engineer Thomas Uda GHD, Asset Management Consultant CNAM 2014 Conference Toronto, Ontario May 20-23, 2014

Background Information Region of Waterloo has 13 WWTPs, consisting of 20 primary and 36 secondary clarifiers Pilot a clarifier renewal strategy at the Galt WWTP for five primary and six secondary clarifiers

Objectives Make informed decisions related to maintenance and capital programming activities Justification of yearly expenditures on maintenance and renewal Develop a program we could use

Galt WWTP Clarifiers Primary Clarifiers Secondary Clarifiers Plant A (4 x 18.3m) Plant B (1 x 25m) Secondary Clarifiers Plant A (4 x 22.86m) Plant B (2 x 31m)

Project Steps Understanding the current state of maintenance planning activities Improving the Current State Prioritization of Maintenance (Risk Profiles) Lifecycle Costing (three options considered) Recommendation and Overall Cost Summary

Understanding the Current State of Maintenance Understand the existing failure modes of the clarifiers Gear drive typically fails from bearing wear and improper lubrication Other assets are structural elements that fail due to overall wear, rusting, or corrosion Use failure modes to identify gaps in clarifier maintenance activities

Improving the Current State: Maintenance Program Development of strategies based on criticality to reduce risks and prevent unexpected failures Condition-based Time-based Run-to-failure Key step: Input from operators

Improving the Current State: Maintenance Program Gear drive failure is a main source of reactive maintenance Increase frequency for changing oil and checking gear drive for wear Inexpensive and less critical components follow a run-to-failure strategy Scum heater and level transmitter

Improving the Current State: Maintenance Program Current asset hierarchy Recommended asset hierarchy

Prioritizing Maintenance: Developing Risk Profiles Risk depends on probability and consequence of failure Condition assessment = physical mortality

Prioritizing Maintenance: Developing Risk Profiles Plant B clarifiers are the highest priority (lack of redundancy compared to Plant A)

The Lowest Cost Approach: Lifecycle Costing The goal is to perform the right maintenance and renewal activities at the right time Three approaches to maintenance and renewal are considered 50 year lifecycle

The Lowest Cost Approach: Lifecycle Costing Option 1: Minimal preventive maintenance Option 2: PM Program with scheduled asset replacement Option 3: Similar to Option 2, but refurbishments are performed to extend the effective life of the asset

The Lowest Cost Approach: Lifecycle Costing Capturing Consequence Costs Repair or replacement cost Cleanup Extra labour Contingency Plans Option 1: Highest Consequence Costs Option 2 and 3: Benefit from timing the renewal of assets in groups

Option 3 (PM Program with refurbishment) results in lowest lifecycle cost

The Lowest Cost Approach: Lifecycle Costing Example of Yearly Costs

The Lowest Cost Approach: Lifecycle Costing Costs (run-to-failure vs scheduled renewal)

The Lowest Cost Approach: Lifecycle Costing 12 Year Outlook

Conclusions Operator involvement is key to developing and implementing a renewal plan Renewal Plan assists in focusing resources on critical and high risk assets Risk can be quantified in dollar values by estimating the cost of the consequence of failure

Conclusions The Region’s current maintenance strategies were in line with Option 3 (preventive maintenance and refurbishment strategy). Renewal plan justifies this approach compared to other maintenance approaches Prioritization of assets was established (PC#5, SC#5, and SC#7)

Next Steps The renewal plan is an ongoing process; refurbishment and renewal intervals are to be updated The recommendations from this project contribute to the Region’s overall Capital Improvement Plan Similar strategies are planned to be implemented for clarifiers at other Region WWTPs

Questions? Contact Us: Richard Pinder Region of Waterloo RPinder@regionofwaterloo.ca Thomas Uda GHD, Asset Management Consultant thomas.uda@ghd.com