Load Participation in Real-Time Market: Loads in SCED version 2

Slides:



Advertisements
Similar presentations
T&D Losses Reflecting Losses in DR within ERCOT August 22, 2012.
Advertisements

Achieving Price-Responsive Demand in New England Henry Yoshimura Director, Demand Resource Strategy ISO New England National Town Meeting on Demand Response.
INSULATING PRICE RESPONSIVE LOAD FROM RUC CAPACITY SHORT CHARGE Mark W. Smith J. Kay Trostle August 2008 DSWG.
SOUTHERN CALIFORNIA EDISON SM R , Phase 4 (Direct Participation) Financial Settlements By G. Muir Davis January 20, 2011.
Loads in SCED v2 Subgroup
Unresolved Issues in NPRR 555 Texas Steel Companies July 9, 2013.
Retail DR and Price Response 2014 Product Headcounts Paul Wattles, ERCOT Market Design & Development DSWG Feb. 3, 2015.
Discuss infrastructure to support bilateral contracting between CSPs and REPs in the Retail Market Loads in SCED Sub-group May 22,
Raine Cotton  Registered DG settlement is in accordance with Protocol Section as Real-Time Energy Imbalance at a Load.
Loads in SCED v2 Subgroup The LMP-G Journey 1. TAC Endorsement of LMP-G TAC voted to endorse “LMP-G” rather than “Full LMP” as the mechanism to enable.
Loads in SCED v2 Subgroup Update to DSWG 3/9/
Loads Acting as a Resource Relationships with QSEs and LSEs
Loads in SCED Version 2 Proxy G Proposal. This is a proposal from Carl Raish as an individual … it has not been vetted internally at ERCOT and should.
Floyd Trefny Director of Product Development Future of Demand Response In ERCOT A Presentation to the Workshop – September 15, 2006 Project Number
© 2013 McNees Wallace & Nurick LLC October 17, 2013 Robert A. Weishaar, Jr. ON SITE ENERGY – INTERPLAY WITH PJM DEMAND RESPONSE PROGRAMS Harrisburg, PA.
LMP-G Policy Issues Discussion Demand Side Working Group July 9 th,
Price Responsive Load Next Steps – Data Collection Paul Wattles Karen Farley DSWG and RMS sub team October 16, 2012.
NEET Workgroup #3 - Residential Subgroup Snohomish County PUD November 2008.
ERCOT Demand Side Working Group Mary Anne Brelinsky Eagle Energy Partners.
“Demand Response: Completing the Link Between Wholesale and Retail Pricing” Paul Crumrine Director, Regulatory Strategies & Services Institute for Regulatory.
Demand Response Workshop September 15, Definitions are important Demand response –“Changes in electricity usage by end-use customers from their.
Developing a Framework for Offset Use in RGGI Opportunities and Risks Dale Bryk, NRDC and Brian Jones, MJB&A – Northeast Regional GHG Coalition RGGI Stakeholder.
Grabbing Balancing Up Load (BUL) by the Horns December 2006.
PJM©2013www.pjm.com Economic DR participation in energy market ERCOT April 14, 2014 Pete Langbein.
TAC Credit Update July TAC July Credit Update To meet the F&A Committee’s request that the Credit WG develop options for dealing with residual credit.
PJM© Demand Response in PJM 2009 NASUCA Mid-Year Meeting June 30, 2009 Boston, MA Panel: Price Responsive Demand – A Long-Term Bargain.
The Wholesale Market Subcommittee Update Prepared for the September 25th TAC meeting.
Demand Response: What It Is and Why It’s Important 2007 APPA National Conference San Antonio, Texas June 26, :00 a.m. to Noon Glenn M. Wilson Director.
Load Participation in Real-Time Market: LMP Minus G.
October 14, 2015 LRIS v2 / Self-scheduled Third party DR Provider Data Submission Proposal Carl L Raish.
LMP-G Policy Issues Matrix LRISv2 Subgroup July 23 rd,
This slide deck contains animations. Please open this deck in slide show mode (“View” menu, then click on “Slide Show”). To move through the animations,
Load Resources Negative RRS Bidding in the Nodal Market Credit Working Group January 30, 2008.
LMP-G Policy Issues Matrix LRISv2 Subgroup July 23 rd,
Demand Response
Business Case NPRR 351 Floyd Trefny Amtec Consulting Brenda Crockett Champion Energy Services.
Programs/Products that ERCOT Does Not Presently Offer ERCOT Demand Side Working Group New DR Product Options Subgroup Jay Zarnikau Frontier Associates.
1 WMS Report TO TAC April In Brief Two Working Group reports Two Working Group reports Two Task Force Reports Two Task Force Reports BENA presentation.
Long Term Study Task Force Update Modeling Emerging Resources Through 2030 January 13, 2012 LTSTF.
Status Report on DSWG Task 11: Retail DR/Dynamic Pricing Project Presentation to the ERCOT Demand Side Working Group Jay Zarnikau Frontier Associates LLC.
LMP-G Update to DSWG LRISv2 Subgroup Aug. 20,
Building Blocks for Premise Level Load Reduction Estimates ERCOT Loads in SCED v2 Subgroup July 21, 2014.
AMIT/DSWG Workshop ERCOT Demand Side Working Group Meeting September 30, 2011 Jay Zarnikau, Frontier Associates.
NPRR 649 Addressing Issues Surrounding High Dispatch Limit (HDL) Overrides Katie Coleman for Air Liquide (Industrial Consumer) ERCOT Board February 9,
Third Party DR Self-Deployment Loads in SCEDv2 Subgroup Sept. 18, 2015.
RATF Policy Decisions Progress Report of RATF May 29, 2014.
DSWG Update to WMS 8/10/2011. DSWG Goals #DSWG GoalDeliverable Target Date Primary Owner Team MembersStatus 1SCED Load Participation Complete analysis.
Load Participation in Nodal Training Session Update DSWG December 7, 2007.
Proxy $G and other Loads in SCED 2 Litmus Tests Loads in SCEDv2 Subgroup Dec. 2, 2014.
Los Angeles County Community Choice Aggregation Regional CCA Task Force Meeting October 28, 2015.
ERCOT MARKET EDUCATION
TAC Report to the ERCOT Board
Retail Market Subcommittee Update to TAC
Pilot Project Concept 30-Minute Emergency Response Service (ERS)
Pilot Project Concept 30-Minute Emergency Response Service (ERS)
Alternative Approach for Loads in SCED v.2
Paul Wattles, Sai Moorty ERCOT Market Design & Development
Reflecting Losses in DR within ERCOT August 22, 2012
Chuck Goldman Lawrence Berkeley National Laboratory
Loretta Martin LCRA , Chair Josephine Wan AE, Vice Chair 05/07/2014
Energy Storage Settlements Consistent with PUCT Project & NPRR461
Hilton • Maher • Selto.
The Future of Demand Response in New England
MARKET RESEARCH.

Restructuring Roundtable:
Benefits of New England’s Proposed Capacity Market
New England Resource Adequacy
John Williams | Senior Procurement Specialist
Load Participation in SCED v1 Overview & Refresher
Presentation transcript:

Load Participation in Real-Time Market: Loads in SCED version 2

Efforts to Allow More Load Participation in Energy Market State law calls for ERCOT to permit demand response to participate in markets Significant potential resource in residential and commercial air conditioning load REP and third-party demand response providers have sought broader opportunities Third-party DR providers could bring focus and expertise, could invest in DR equipment at customers’ premises

TAC Deliberations TAC voted to endorse “LMP-G” rather than “Full LMP” as settlement mechanism in 2011 TAC decision based on a conceptual discussion, rather than detailed examination of LMP-G Presentation to TAC emphasized avoiding double payment: LMP to DR provider plus customer’s avoided cost of energy TAC endorsed “volumetric” LMP-VG, in which amount of energy curtailed would be added back to the customers’ consumption

Recent Stakeholder Efforts DSWG’s Loads in SCED subgroup has worked on details of how LMP-G could be implemented Volumetric LMP-G is not workable for residential and small commercial, because ERCOT believes it cannot estimate load reductions for individual residential and small commercial sites with sufficient accuracy New approach, LMP-Proxy $G can work for all classes of customers This approach has broad support in DSWG

LMP-Proxy $G Settlement LMP-G would be implemented at the wholesale market level ERCOT would pay DR QSEs for customers load reduction at LMP-Proxy $G ERCOT would charge the customer’s LSE at LMP-Proxy $G for the load reduction Proxy $G would be based on POLR rates No new market uplifts under this approach

LiSCED Consensus Principles Loads should be permitted to actively participate in Real Time Market Loads participating in Real Time Market would contribute to wholesale price formation Loads should not receive financial benefit more than once for providing demand response The existing ORDC and Loads in SCED “bid to buy” market structures should be preserved

LiSCED Consensus Customer Policies Customer has the right to select or change a DR QSE REP would be notified if customer agrees to have his load response managed by a DR QSE Rules should preclude DR-blocker strategies by REPs Rules should ensure an adequate transition period for REPs to manage existing customer relationships For the transition period, rules should define what will happen to a customer’s rate plan when customer joins a DR QSE, if the current rate plan includes an incentive tied to DR capability Customer engagement rules will be needed, so that REPs and DR QSEs compete on equitable term

LiSCED Consensus Implementation Mechanisms New concept of demand response provider of record (DR-POR) System to notify ERCOT and current REP or DR provider of customer enrollment in DR program and other key events System needed to resolve competing claims to be customer’s DR-POR

Areas of Particular PUC Interest Can REP charge customer for energy not consumed or for risks related to customer’s participation in 3d party DR? What are REP’s options when customer joins a DR QSE, if the current rate plan includes an incentive tied to DR capability Transition period for REPs to manage existing customer relationships Prohibition of DR-blocker strategies by REPs Customer engagement rules: REPs and DR QSEs to compete on equitable term System to resolve competing claims to be customer’s DR-POR

Questions for TAC Should the PUC be brought into the deliberations on Loads in SCED? If so, when and how? DSWG has taken a different approach to LMP-G than the one discussed at prior TAC meeting. Is there a problem with this change?