Global Core List survey materials for regional PPP updates

Slides:



Advertisements
Similar presentations
Operational Material. A 7-sheet Survey Questionnaire Resource Inputs and Basic Headings Outline Overall Validation Process Timetable Overall Methodology.
Advertisements

Regional Coordinators Meeting September 28-30, 2009 Washington DC Housing in ICP 2011: Outstanding Issues.
United Nations Statistics Division/DESA
LiberRATE Estimating It thinks like you do! Edition 3 Instructions Click on buttons to advance or to repeat the previous slide PreviousNext.
1 of : Multi-Currency Payments / DA0813 Last updated: Project Walkthrough: Multi-Currency Payments Multi-Currency Payments.
Chain-linking and rebasing of national accounts Expert Group Meeting on National Accounts Cairo May 12-14, 2009 Presentation points.
Operational Material. 2 Presentation Outline Fast Evolving Technology Products Introduction Approach Implementation Item Specifications Pricing Guidelines.
MC and Commissioning Preparation
International Workshop on Industrial Statistics Dalian, China June 2010 Shyam Upadhyaya UNIDO Statistical units and data items.
United Nations Statistics Division/DESA International Recommendations for the Index of Industrial Production (IIP)
Regional Coordinators Meeting September 28-30, 2009 Washington DC Machinery & Equipment: Using Exchange Rates as PPPs for M&E.
10 September 2009 OECD STESEG Introducing NACE rev 2 in EU Short-term business Statistics Brian Newson Head of STS unit Eurostat.
United Nations Statistics Division/DESA International Recommendations for the Index of Industrial Production (IIP)
ICP-Africa Regional Workshop Pretoria, South Africa June 2011.
Summary of Local Seminars & Focus Groups 20/06/ Athens WP8 – TESTING II coordinated by IFI.
12 October 2009 EU-OECD Workshop Introducing NACE rev 2 in EU Short-term business Statistics Brian Newson Head of STS unit Eurostat.
Machinery and Equipment and PPPs Richard Dibley 3 rd Technical Advisory Group Meeting.
1 Report to Regional Coordinators of TAG Meeting Sept 22-24, 2004.
Operations Management Aggregate Planning
5 th Regional Coordinator’s Meeting October 5-6, 2011 Washington DC Global Office.
1 A framework for international comparisons of volume and prices in health care Interim Report Manfred Huber 7 th Meeting of HA Experts and Correspondents.
1 An experimental ISP for ICT for France 28 June 2006 STESWP Task Force on Services.
Regional Coordination Agencies Meeting ICP 2015 – Updates to Machinery and Equipment Goods Washington DC, May 27 – 29, 2015.
Housing Update SPD and Questionnaires 2 nd Regional Coordinating Agencies meeting May 27-29, 2015 Washington, DC.
Ring Comparison Product List Yonas Biru Sixth ICP Regional Coordinators Meeting Washington D.C. Sept
Session III:Global Core List survey materials for regional PPP updates Government Compensation 2 nd Regional Coordinating Agencies meeting May 27-29, 2015.
2 nd Regional Coordinating Agencies meeting May 27-29, 2015 Washington, DC Session V: Discussions on the future ICP integration into work programs and.
Maximizing synergies in regional and global post-2011 activities Requirements and challenges for linking regional PPP updates 2 nd Regional Coordinating.
Session IV: Expenditures and price deflators reporting Estimation of National Account Expenditures for Non-benchmark Years 2 nd Regional Coordinating Agencies.
Light Touch Calculator Growth that doesn’t cost the earth Emma Hutchinson This webinar is designed to introduce you to the Resource Efficient Scotland.
Typical farms and hybrid approaches
SharePoint 101 – An Overview of SharePoint 2010, 2013 and Office 365
Quality Assurance Procedures for Estimating Purchasing Power Parities
Configuration Slide Last Reviewed:- 15 May 13 Last Amended:- 25 Jul 13
Extrapolation of the ICP 2011 PPPs
Allocation of costs in complex cropping and mixed farming systems
Agricultural Cost of Production : Determination of Cash Costs
Index of Industrial Production: Methods of Compilation
Session I: Global core lists and survey forms
Consumer Price Indexes
Status Report on ICP Methodological Development
ICP Expenditure Classification
Marcel van Kints United Nations Statistics Division/DESA
Industrial Assessment Center Database
Software Project Management
(Additional materials)
Construction Approach and Productivity Issues
Program Management Portal (PgMP): Catalog and the Client
Does each Subway $5 Footlong cost the franchisee more than $5?
ICP 7-th Regional Coordinators Meeting World Bank, Washington D.C.
UN List of Industrial Products
LIVESTOCK PRODUCTION AND PRODUCTIVITY
Session 7: Adjustment for quality changes
Presenter: Lorena Pulido
G063 - Distributed Databases
Item III.3: Research and Development
UIS Culture Statistics: Program of Work Meeting of the WG Culture Statistics  Eurostat, Luxembourg November 2016 José Pessoa Head of Culture Statistics,
International Comparison Program 2011
Eurostat/ OECD regional report
Quality-Adjusted Labour Input
Objectives To gain a basic understanding of the Construction Pathway.
United Nations Voluntary Fund on Disability (UNVFD)
Geant4 Documentation Geant4 Workshop 4 October 2002 Dennis Wright
Passenger Mobility Statistics 21 May 2015
AICT5 – eProject Project Planning for ICT
M. Kezunovic (P.I.) S. S. Luo D. Ristanovic Texas A&M University
Part B of CMF: Metadata, Standards Concepts and Models Jana Meliskova
Situation of Annual National Accounts data and metadata in 2009
General aspects of the data validation process
and Forecasting Resources
Presentation transcript:

Global Core List survey materials for regional PPP updates Construction and Civil Engineering 2nd Regional Coordinating Agencies meeting May 27-29, 2015 Washington, DC

Recap: ICP 2011 construction approach 38 Material items 33 “Pure” material items; 5 “equipment-type” items Allocated to basic headings based on relevance 5 + 5 Equipment hire items 5 original items; splitted to w and w/o operator For global PPP calculation ref. PPP from M&E Input Cost Approach 7 labor items 1 un-skilled labor; 6 skilled labors No adjustment for productivity Other input data Resource mixes: used to weight sub-heading Mark-ups and professional fees: not used

…Challenges with the 2011 approach Price data quality and reporting Generally very high CVs and several missing data points Item definitions In order to ensure regional “representativity” several item definition were possibly too loose, especially for equipment Unit of measurement (tons, m2, m3, hours, days, etc.) Prices were allowed to be reported to “alternative” unit of measurement, which lead to issues with comparability Resource mixes, mark-ups and professional fees Several missing data points and issues with data quality

Suggestions for improvements: Materials (1) 1. Introduction of Structured Product Definitions (SPDs) All sub-headings To ensure clear, structured and comprehensive item definitions A review by construction expert(s) would still be recommended… 2. Fixing unit of measurement NCAs need to ensure reporting in requested unit of measurement

Suggestions for improvements: Materials (2) 3. Providing more technical details to “equipment-type” items In order to ensure comparability Brand and model are presented as examples Alternative would be to follow “fixed” or “unspecified” brands as in M&E 4 items “linked” to M&E 1 item defined but not linked Air-conditioning equipment 1 item suggested to be deleted Electric fan 1 item could be modified to fit M&E Metal storage tank; from single skinned 15m3 to double skinned 50m3?

Suggestions for improvements: Equipment hire 1. Providing more technical details on the equipment to-be-hired Including example brand and model 2. Fixing ex/inclusion of operator Duplicated items for with and without operator 3. Defining exclusion of fuel Alternative would be inclusion? 4. Adding “specify” parameter To record exact hiring details

Suggestions for improvements: Labor 1. Proving item specifications as per ISCO classification General definition and example tasks 2. “Fixed” details Unit of measurement Hour; day; month? Skill level and training Salary type Information to be specified Items to added? Painter; would however increase the ratio of unskilled vs. skilled to 1:7

Points for discussion (1) General Suggested “refinement” approach agreeable? SPDs; fixing of units; more detailed definitions Materials Any suggestions for removing or addition of items? Suggested “links” to M&E items agreeable? Change the metal storage tank item? Any volunteers for re-refining the item definitions? Equipment hire “Price capture approach” still feasible? Exclusion of operating fuel agreeable?

Points for discussion (2) Labor Suggested links to ISCO classification agreeable? Fix the unit of measurement to hour, day or month? Add “painter” item? Resource mixes Keep the data requirement? Update or keep global default values? Professional fees Keep the data requirement? Further research potential usage of professional fees in PPP estimation? Eurostat-OECD program Extrapolate 2011 ICP prices; OR Carry-out a survey for global PPP update(s)?