- PANDA EMC Readout System

Slides:



Advertisements
Similar presentations
StreamBlade SOE TM Initial StreamBlade TM Stream Offload Engine (SOE) Single Board Computer SOE-4-PCI Rev 1.2.
Advertisements

Digital RF Stabilization System Based on MicroTCA Technology - Libera LLRF Robert Černe May 2010, RT10, Lisboa
An ATCA and FPGA-Based Data Processing Unit for PANDA Experiment H.XU, Z.-A. LIU,Q.WANG, D.JIN, Inst. High Energy Physics, Beijing, W. Kühn, J. Lang, S.
CMS ECAL End Cap EDR Meeting CERN 28 Nov. to 29 Nov 2000 A.B.Lodge - RAL 1 ECAL End Cap CMS ECAL End Cap Engineering Design Review. EDR meeting held 28.
GEM Electronic System Status New releases of electronic boards: ◦ MPD v 4.0 ◦ Backplane 5 slot short (for UVa design) ◦ APV Front-End with Panasonic connector.
DLS Digital Controller Tony Dobbing Head of Power Supplies Group.
Update on APV25-SRS Electronics Kondo Gnanvo. Outline Various SRS Electronics Status of the APV25-SRS UVa Test of the SRU with multiple.
PHENIX upgrade DAQ Status/ HBD FEM experience (so far) The thoughts on the PHENIX DAQ upgrade –Slow download HBD test experience so far –GTM –FEM readout.
25/05/2010 RD51 Collaboration Meeting Cisbani-Musico-Minutoli / Status JLab Electronics 1 Status of the APV25 electronics for the GEM tracker at JLab Evaristo.
LNL 1 SLOW CONTROLS FOR CMS DRIFT TUBE CHAMBERS M. Bellato, L. Castellani INFN Sezione di Padova.
CMX status and plans Yuri Ermoline for the MSU group Level-1 Calorimeter Trigger Joint Meeting CERN, October 2012,
Acquisition Crate Design BI Technical Board 26 August 2011 Beam Loss Monitoring Section William Vigano’ 26 August
Status of NA62 straw electronics Webs Covers Services Readout.
Update on final LAV front-end M. Raggi, T. Spadaro, P. Valente & G. Corradi, C. Paglia, D. Tagnani.
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept and status of the PSD temperature control - Concept of the PSD analog part.
ASIC Activities for the PANDA GSI Peter Wieczorek.
09/10/2010 RD51 Collaboration Meeting Cisbani-Musico-Minutoli / Status JLab Electronics 1 Status of the APV25 electronics for the GEM tracker at JLab Evaristo.
APD. photosensors: L arge A rea A valanche P hoto D iodes (LAAPD) in collaboration with Hamamatsu Photonics CMS 5x5mm 2 10x10mm 2 new excellent performance.
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept of the PSD temperature stabilization and control - Upgrade of HV control system.
New digital readout of HFRAMDON neutron counters Proposal Version 2.
New ATCA compute node Design for PXD Zhen-An Liu TrigLab, IHEP Beijing Feb , 6th International Workshop on DEPFET Detectors and Applications.
DAQ ELECTRONICS 18 March 2015MEG Collaboration Meeting, Tokyo Stefan Ritt.
1 Hardware Tests of Compute Node Carrier Board Hao Xu IHEP, CAS.
Outline Upgrade status of the ECAL/HCAL HV control mezzanine board;  Firmware design,  Setup for making functional tests and validation FPGA firmware.
DHH Status Igor Konorov TUM, Physics Department, E18 PXD DAQ workshop Münzenberg –June 9-10, 2011.
Johannes Lang: IPMI Controller Johannes Lang, Ming Liu, Zhen’An Liu, Qiang Wang, Hao Xu, Wolfgang Kuehn JLU Giessen & IHEP.
CLB demonstration board & prototype tests (CLB: Central Logic Board) 1 WPFLElectronics PPMCLB F. Louis.
E. Hazen1 MicroTCA for HCAL and CMS Review / Status E. Hazen - Boston University for the CMS Collaboration.
Front End. Charge pre-amp and detector Voltage regulator. TOP side. Detector linear voltage regulator BOTTOM side. Charge pre-amp.
E. Hazen -- CMS Week HCAL Back-End MicroTCA Upgrade Status E. Hazen Boston University.
M. Tiemens, M. Kavatsyuk KVI, University of Groningen EMC Front-End Electronics for the Preassembly.
E. Hazen -- Upgrade Week1 AMC13 Project Status E. Hazen - Boston University for the CMS Collaboration.
E. Hazen - Back-End Report1 AMC13 Status Update ● Version 1 (5Gb/s links, Virtex-6 chip) ● 15 modules built, all but 3 distributed to colleagues.
Creotech Instruments Jacek Kosiec On behalf of.
Counting Room Electronics for the PANDA MVD
Valérie Chambert and Joël Pouthas
DAQ ACQUISITION FOR THE dE/dX DETECTOR
The Data Handling Hybrid
AMC13 Project Status E. Hazen - Boston University
DAQ and TTC Integration For MicroTCA in CMS
The SLAC Instrumentation and Control Platform
Data and Control link via GbE
Test Boards Design for LTDB
AMC13 T1 Rev 2 Preliminary Design Review E. Hazen Boston University
LKr status R. Fantechi.
- PANDA EMC Readout System
E. Hazen - Back-End Report
Baby-Mind SiPM Front End Electronics
AMC13 Status Report AMC13 Update.
M. Tiemens The hardware implementation of the cluster finding algorithm and the Burst Building Network.
Future Hardware Development for discussion with JLU Giessen
96-channel, 10-bit, 20 MSPS ADC board with Gb Ethernet optical output
cooling and supports of the forward endcap EMC
Large Area Endplate Prototype for the LC TPC
CoBo - Different Boundaries & Different Options of
LATOME LAPP Nicolas Dumont Dayot on behalf of the LAPP team
HCAL Data Concentrator Production Status
E. Noah, A. Blondel, Y. Favre, R. Tsenov 29 July 2015
MicroTCA Common Platform For CMS Working Group
MicroTCA Common Platform For CMS Working Group
Development of new CN for PXD DAQ
JLAB Front-end and Trigger Electronics
Front-end electronic system for large area photomultipliers readout
Status of n-XYTER read-out chain at GSI
Pierluigi Paolucci - I.N.F.N. Naples
University of California Los Angeles
CMX Status and News - post PRR -
ESS BCM Firmware 1.
Safety, reliability and maintainability
Command and Data Handling
Presentation transcript:

- PANDA EMC Readout System ADC for EMC - PANDA EMC Readout System 3,600 Photosensor VPTT Preamplifier Basel 13,888 Data Concentrator, 16-ch 60 949 Compute Node ADC 64-ch, 14-bit, 80-MSPS 949 60 Compute Node Compute Node 11,952 Photosensor APD Preamplifier APFEL (GSI) 46,788 Pawel Marciniewski, EMC FEE/DAQ Meeting, KVI, 30.03.2016

- PANDA EMC Readout System ADC for EMC - PANDA EMC Readout System 3,600 217 ADC 64-ch 217 Photosensor VPTT Preamplifier Basel 13,888 Data Concentrator, 16-ch 22 Compute Node 22 Compute Node Compute Node 366 ADC 64-ch 11,952 Photosensor APD Preamplifier APFEL (GSI) 46,788 122 Pawel Marciniewski, EMC FEE/DAQ Meeting, KVI, 30.03.2016

- Final ADC Count OPTION1 OPTION2 OPTION3 ADC for EMC CHANNELS SENSORS per ch. RANGES ADC CH ADC NO ADC SUM SPARES PROD OPTION1 FWE-VPTT 768 1 2 1536 24   FWE-APD 3088 12352 193 217 33 250 BAR-APD 11360 45440 710 BKE-APD 692 1384 22 732 68 800 SUM 60712 949 101 1050 OPTION2 22720 355 11 366 34 400 37300 583 650 OPTION3 BAR-APD (65 MSPS) BKE-APD (65 MSPS) Pawel Marciniewski, EMC FEE/DAQ Meeting, KVI, 30.03.2016

- Final ADC Modifications ADC for EMC - Final ADC Modifications   Modification Comment Status 1 Versatile Link/SFP+ options SFP+ is still kept as a fall-back option √ 2 GTX-link added to the backplane Allows for external cascading of the readout chain 3 Power via backplane Bigger backplane connector with more pins providing power 4 Power and control over front panel Option for front power distribution. 5 Passive power monitor All voltages and currents assembled on two connectors for monitoring 6 Active power monitor 32-channel slow ADC for health monitoring under run conditions 7 Test pulse generator Risk of performance drop X Pawel Marciniewski, EMC FEE/DAQ Meeting, KVI, 30.03.2016

- Final ADC Modifications ADC for EMC - Final ADC Modifications Pawel Marciniewski, EMC FEE/DAQ Meeting, KVI, 30.03.2016

- Final ADC Modifications ADC for EMC - Final ADC Modifications Ceramic Capacitors Pawel Marciniewski, EMC FEE/DAQ Meeting, KVI, 30.03.2016

- Final ADC Modifications ADC for EMC - Final ADC Modifications Mounting Holes Pawel Marciniewski, EMC FEE/DAQ Meeting, KVI, 30.03.2016

- Final ADC Modifications For power distribution ADC for EMC - Final ADC Modifications Bigger Connectors For power distribution and GTX Pawel Marciniewski, EMC FEE/DAQ Meeting, KVI, 30.03.2016

- Final ADC Modifications ADC for EMC - Final ADC Modifications Versatile Link option Pawel Marciniewski, EMC FEE/DAQ Meeting, KVI, 30.03.2016

- Final ADC Modifications ADC for EMC - Final ADC Modifications Flat Zero-cost power monitoring and supply connector Pawel Marciniewski, EMC FEE/DAQ Meeting, KVI, 30.03.2016

- Final ADC Modifications 16-channel full power monitors ADC for EMC - Final ADC Modifications 16-channel full power monitors (option) Pawel Marciniewski, EMC FEE/DAQ Meeting, KVI, 30.03.2016

- Encapsulation and Cooling ADC for EMC-Endcap - Encapsulation and Cooling Courtesy KVI Pawel Marciniewski, EMC FEE/DAQ Meeting, KVI, 30.03.2016

- Pre-production tests ADC for EMC - Pre-production tests   Tests Comment Status 1 GTX Bandwidth Done for 2 GB/s, faster SFP+ is ordered to test higher frequencies Done 2 Input configuration ADC prepared with different input filters to be tested in Stockholm. Preparations with TRB started Work on 3 Radiation immunity Tests with a neutron beam at TSL, Uppsala were planned in cooperation with KVI, but were postponed.  Urgent 4 Burn-up tests We have 6 modules which should be left powered and cooled for a longer time to detect possible failures/shortcomings. Urgent Pawel Marciniewski, EMC FEE/DAQ Meeting, KVI, 30.03.2016

- Pre-production tests – IBERT 2.0 Gbps ADC for EMC - Pre-production tests – IBERT 2.0 Gbps Pawel Marciniewski, EMC FEE/DAQ Meeting, KVI, 30.03.2016

- Completing the system ADC for EMC - Completing the system   Tests Comment Status 1 Test station Start-up station with controlled power supply and power monitoring, configuration, test and readout. Engineer needed 2 ADC enclosure 230 enclosures needed Preliminary design 3 Crate mechanics and cooling ADC prepared with different input filters to be tested in Stockholm. Preparations with TRB started 4 Power Supply 1V – 6A, 2.5V – 6A, 3.3V – 1A per module. Air core DC/DC design needed. Pawel Marciniewski, EMC FEE/DAQ Meeting, KVI, 30.03.2016

- Data Concentrators VME64x AMC (uTCA) Kintex Ultrascale 20nm ADC for EMC - Data Concentrators VME64x AMC (uTCA) 180 mm 151 mm Kintex Ultrascale 20nm 16 Optical Links 10 Gbit/s 8 10Gbit/s lanes to uTCA 1Gbit Ethernet Pawel Marciniewski, EMC FEE/DAQ Meeting, KVI, 30.03.2016

- ZYNQ Data Concentrator ADC for EMC - ZYNQ Data Concentrator Pawel Marciniewski, EMC FEE/DAQ Meeting, KVI, 30.03.2016

ZYNQ Data Concentrator - Tests and debugging Hardware check: SFP+ optical loopback test @ 6.25 Gbps DDR 533 √ UART Flash SDHC PLL SFP+ USB 2.0 ? HDMI X Firmware & software Basic Configuration √ Hello world test DDR test Hardware test LINUX X Pawel Marciniewski, EMC FEE/DAQ Meeting, KVI, 30.03.2016

ZYNQ Data Concentrator - 6.25 Gbps Pawel Marciniewski, EMC FEE/DAQ Meeting, KVI, 30.03.2016

- Schedule EMC SADC EMC Data Concetrators ADC for EMC 2014 2015 2016   2014 2015 2016 2017 2018 EMC SADC ADC tests Final design Final version production Firmware development Radiation immunity test First production batch Batch testing Batch burn-in Partial assembly Second production batch Final implementation EMC Data Concetrators DC design   DC testing Prototype production Batch production System testing Pawel Marciniewski, EMC FEE/DAQ Meeting, KVI, 30.03.2016

Thank You ! ADC for EMC-Endcap Pawel Marciniewski, EMC FEE/DAQ Meeting, KVI, 30.03.2016