GSCM 520 RANK Let's Do This /gscm520rank.com

Slides:



Advertisements
Similar presentations
Final Exam Study Guide MIS 373: Basic Operations Management.
Advertisements

Logistics Network Configuration
1–11–1. 1–21–2 Chapter One Copyright © 2014 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
PRODUCTION PLANNING ELİF ERSOY Production Planning2 WHAT IS PRODUCTION PLANNING?  Production planning is a process used by manufacturing.
©© 2013 SAP AG. All rights reserved. Scenario/Processes Make-to-Stock Scenario Overview Planning Supply Initiating Production Executing Production Processing.
SchedulingProducingControllingSchedulingProducingControlling.
Carnegie Mellon University © Robert T. Monroe Management Information Systems Supply Chain Management Systems Management Information.
McGraw-Hill/Irwin © 2011 The McGraw-Hill Companies, All Rights Reserved Chapter 1 Operations and Supply Chain Management.
SchedulingProducingControllingSchedulingProducingControlling.
McGraw-Hill/Irwin Copyright © 2008 by The McGraw-Hill Companies, Inc. All rights reserved. Aggregate Sales and Operations Planning CHAPTER 11.
Supplier Up to Schedule Plan  Supplier receives releases from Lear on a weekly basis via EDI or Fax.  If the supplier does not receive a release on a.
© 2007 Pearson Education Sales and Operations Planning.
SchedulingProducingControllingSchedulingProducingControlling.
INTRODUCTION Chapter One Copyright © 2014 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
For more course tutorials visit MKT 421 Final Exam Guide 1 1) Which of the following statements best describes the modern view of marketing?
OPS 571 Academic Success / snaptutorial.com For more course Tutorials
OPS 571 genius Expert Success/ops571geniusdotcom FOR MORE CLASSES VISIT
MGT 322 Week 2 Global Strategy Check this A+ tutorial guideline at here are a.
McGraw-Hill/Irwin ©2009 The McGraw-Hill Companies, All Rights Reserved
Chapter 7: Manufacturing Processes
OPERATIONS MANAGEMENT Introduction to OM.
OPS 571 help / ops571helpdotcom
GSCM 520 RANK Success Our Tradition/gscm520rank.com
Acc 576 Course Experience Tradition / snaptutorial.com
Make-to-Stock Scenario Overview
ACC 281 GENIUS A Guide to career/acc281genius.com
Dikos, George, and Stavroula Spyropoulou
Operations Management
GSCM 520 RANK It's Your Life/gscm520rank.com
OPERATIONS MANAGEMENT Business Research and Service Institute LLC
Copyright ©2017 McGraw-Hill Education. All rights reserved.
The University of Jordan Mechatronics Engineering Department
BUAD306 MRP/ERP.
LOGISTICS NETWORK.
Make-to-Stock Scenario Overview
McGraw-Hill/Irwin Copyright © 2009 by The McGraw-Hill Companies, Inc. All rights reserved.
Supply Chain Network and Optimization Executive Seminar
The Best way to predict the Future is to create it.....To Best way....
BUS 644 Competitive Success/snaptutorial.com
BUS 430 Innovative Education-- snaptutorial.com
GSCM 520 Competitive Success/snaptutorial.com
HCA 311 Competitive Success/snaptutorial.com
OPS 571 Education for Service-- snaptutorial.com.
BUS 307Competitive Success/tutorialrank.com
GSCM 520 Innovative Education--snaptutorial.com
ACC 281Competitive Success/snaptutorial.com
GSCM 530Competitive Success/tutorialrank.com
GSCM 588 Competitive Success/tutorialrank.com
HCA 311Competitive Success/tutorialrank.com
GSCM 588 MENTOR Lessons in Excellence-- gscm588mentor.com.
BUS 644 Lessons in Excellence-- bus644.com. BUS 644 Entire Course (Ash Course) For more course tutorials visit BUS 644 Week 1 DQ 1 Ethical.
OPS 571 GENIUS Lessons in Excellence-- ops571genius.com.
BUS 644 Education for Service/snaptutorial.com
UOPOPS571 Lessons in Excellence--uopops571.com
GSCM 520 Education for Service/snaptutorial.com
MKT 421 Education for Service/tutorialrank.com
OPS 571 Education for Service/tutorialrank.com
OPS 571 Teaching Effectively-- snaptutorial.com
Gscm 588 Education for Service-- tutorialrank.com
BUS 644 Teaching Effectively-- snaptutorial.com
OPS 571 GENIUS Education for Service-- ops571genius.com.
OPS 571 HELP Education for Service-- ops571help.com.
GSCM 520 Teaching Effectively-- snaptutorial.com.
UOPOPS 571 Education for Service-- uopops571.com.
CHAPTER 14 MRP and ERP.
Chapter 9 Achieving Operational Excellence and Customer Intimacy: Enterprise Applications.
Manufacturing Production Planning
TIME BASED COMPETITION
OPS 571 HELP Dreams Come True / ops571help.com. OPS 571 Assignment Critical Path FOR MORE CLASSES VISIT a.Observe the critical path.
1. 2 Operational Efficiency and Business process Performance Operational Efficiency and Business process Performance Just in Time Systems (J I T) Reductions.
Presentation transcript:

GSCM 520 RANK Let's Do This /gscm520rank.com

GSCM 520 RANK Let's Do This /gscm520rank.com GSCM 520 Final Exam Guide FOR MORE CLASSES VISIT www.gscm520rank.com   Question 1.1. (TCOs 1 and 2) Current issues in OSCM do not include (Points : 4) coordinating relationships between organizations. making senior management aware that OSCM can be a competitive weapon. the triple bottom line. managing customer touch points. increasing global supply chain employment.

GSCM 520 RANK Let's Do This/gscm520rank.com GSCM 520 Week 1 Case Study The Tao of Timbuk2 (2 Papers) FOR MORE CLASSES VISIT www.gscm520rank.com   This Tutorial contains 2 Papers of this Assignment (written in different ways) GSCM 520 Week 1 Case Study The Tao of Timbuk2 GSCM520 Case Study The Tao of Timbuk 2 Case—The Tao of Timbuk2 (p. 43)

GSCM 520 RANK Let's Do This/gscm520rank.com GSCM 520 Week 1 Quiz FOR MORE CLASSES VISIT www.gscm520rank.com   1. Question : (TCO 1) The Goods-Services Continuum consists of which set of the following categories? 2. Question : (TCOs 1 and 2) Which of the following is a measure of operations and supply management efficiency used by Wall Street? 3. Question : (TCO 2) In development of an operations and supply chain strategy, which of the following may be an important product-specific criteria to consider?

GSCM 520 RANK Let's Do This/gscm520rank.com GSCM 520 Week 2 Case Study Shouldice Hospital A Cut Above FOR MORE CLASSES VISIT www.gscm520rank.com   GSCM 520 Week 2 Case Study Shouldice Hospital – A Cut Above Review the Shouldice Hospital case study. You can find the questions for this case study in Doc Sharing. Compose an APA-formatted Word document, no more than three pages in length; please answer each of the questions in the presented case study. In a three-page paper, answer the following. How well does the hospital currently utilize its beds? Develop a similar table to show the effects of adding operations on Saturday. (Assume that 30 operations would

GSCM 520 RANK Let's Do This /gscm520rank.com GSCM 520 Week 2 Quiz FOR MORE CLASSES VISIT www.gscm520rank.com   1. Question : (TCO 5) In most cases, demand for products or services can be broken down into several components. Which of the following is not considered a component of demand? 2. Question : (TCO 5) In most cases, demand for products or services can be broken into several components. Which of the following is considered a component of demand?

GSCM 520 RANK Let's Do This /gscm520rank.com GSCM 520 Week 3 Case Study Pro Fishing Boats FOR MORE CLASSES VISIT www.gscm520rank.com   Pro Fishing Boats Review the Pro Fishing Boats case study on page 428 in the textbook, and refer to the questions noted in Doc Sharing. Case—Pro Fishing Boats—A Value Stream Mapping Exercise (p. 428) · Create a value stream map (VSM) of this supply chain. What other information is needed? · Where are there risks for supply chain disruptions or stoppages to the flow of materials? · Where do opportunities reside in improving supply chain operations, and how has VSM helped to reveal these?

GSCM 520 RANK Let's Do This /gscm520rank.com GSCM 520 Week 3 Case Study Quality Parts Company(2 Papers) FOR MORE CLASSES VISIT www.gscm520rank.com   This Tutorial contains 2 Papers of this Assignment (written in different ways) GSCM 520 Week 3 Case Study Quality Parts Company Quality Parts Company Review the Quality Parts Company case study on page 426 in the textbook, and refer to the questions noted in Doc Sharing.

GSCM 520 RANK Let's Do This /gscm520rank.com GSCM 520 Week 3 Case Study Value Stream Mapping FOR MORE CLASSES VISIT www.gscm520rank.com   In a three-page paper, answer the following. ·Eliminating the queue of work dramatically quickens the time it takes a part to flow through a system. What are the disadvantages of removing those cues? ·How do you think the machine operators would react to the change? ·What would you do to ensure that the operators were busy?

GSCM 520 RANK Let's Do This /gscm520rank.com GSCM 520 Week 3 Quiz FOR MORE CLASSES VISIT www.gscm520rank.com   1. Question : (TCO 6) An analytical tool used in six-sigma quality improvement programs is which of the following? 2. Question : (TCO 6) Which of the following is not an analytical tool used in six-sigma quality improvement programs? 3. Question : (TCO 6) An opportunity flow diagram as part of a six-sigma quality improvement process

GSCM 520 RANK Let's Do This /gscm520rank.com GSCM 520 Week 4 Case Study Toshibas Notebook Computer Assembly Line FOR MORE CLASSES VISIT www.gscm520rank.com   Task In a three-page paper, answer the following. Pg 199 ·What is the daily capacity of the assembly-line design by the engineers? ·When it is running at maximum capacity, what is the efficiency of the line relative to its use of labor? Assume that the supporter is not included in efficiency calculations?

GSCM 520 RANK Let's Do This /gscm520rank.com GSCM 520 Week 4 Quiz FOR MORE CLASSES VISIT www.gscm520rank.com   1. Question : (TCO 7) Using the assembly-line balancing procedure, which of the following is the required cycle time in minutes per unit if the daily production time is 480 minutes and the required daily output is 50 units?

GSCM 520 RANK Let's Do This /gscm520rank.com GSCM 520 Week 5 Case Study Bradford Manufacturing FOR MORE CLASSES VISIT www.gscm520rank.com   Prepare an aggregate plan for the coming year, assuming that the sales forecast is perfect. Use the spreadsheet Bradford Manufacturing. In the spreadsheet, an area has been designated for your aggregate plan solution. Supply the number of packaging lines to run and the number of overtime hours each quarter. You will need to set up the course calculations in the spreadsheet. ·Review your solution carefully and defend your answers.

GSCM 520 RANK Let's Do This /gscm520rank.com GSCM 520 Week 5 Case Study Brunswick Motors FOR MORE CLASSES VISIT www.gscm520rank.com   GSCM 520 Week 5 Case Study Brunswick Motors Assume that Phil wants to minimize his inventory requirements. Assume that each order will be only for what is required for a single period. Using the forms in the case, calculate the net requirements and planned order releases for the gearboxes and input shafts. Assume that the lot sizing is done using a lot for lot. · Calculate a schedule using lease-total-cost lot sizing. What are the savings with this new schedule?

GSCM 520 RANK Let's Do This /gscm520rank.com GSCM 520 Week 5 Quiz FOR MORE CLASSES VISIT www.gscm520rank.com   1. Question : (TCO 8) In an overview of the major operations planning activities in a typical logistics organization, which of the following activities follows aggregate sales and operations planning? 2. Question : (TCO 8) The main purpose of aggregate operations planning is to specify the optimal

GSCM 520 RANK Let's Do This /gscm520rank.com   GSCM 520 Week 6 Case Study Grainger Reengineering the China US Supply Chain FOR MORE CLASSES VISIT www.gscm520rank.com Case—Grainger: Reengineering the China/U.S. Supply Chain (p.457) Please address the following. ·Evaluate the current China/Taiwan logistics costs. Assume a current total volume of 190,000 CBM and that 89% is shipped direct from the supply is plants in containers.

GSCM 520 RANK Let's Do This /gscm520rank.com GSCM 520 Week 6 Case Study Inventory Management at Big10Sweater FOR MORE CLASSES VISIT www.gscm520rank.com   Case—Inventory Management at Big10Sweater (p.395) Please address the following. ·Using the data provided in the text, calculate how much Rhonda and Steve made for taxes last year. ·What was your reasoning behind using the aggregate demand forecasts when determining the size of your order rather than the individual school forecasts? Should you rethink this or is there a sound basis for doing it this way? ·How many sweaters should you order this year? Write down your order by individual school. Document your calculations in your spreadsheet. Calculate this based on the aggregate forecasts and also the forecast by individual school.

GSCM 520 RANK Let's Do This /gscm520rank.com GSCM 520 Week 6 Quiz FOR MORE CLASSES VISIT www.gscm520rank.com   1. Question : (TCO 4) Which of the following is one of the categories of manufacturing inventory? 2. Question : (TCO 4) When material is ordered from a vendor, which of the following is not a reason for delays in the order arriving on time?

GSCM 520 RANK Let's Do This /gscm520rank.com GSCM 520 Week 7 Case Study Distribution Center Location Grainger FOR MORE CLASSES VISIT www.gscm520rank.com   GSCM 520 Week 7 Case Study Distribution Center Location-Grainger Case—Distribution Center Location-Grainger (p.477) Please address the following: Relative to the U.S. distribution network, calculate the costs associated with running the existing system. Assume that 40% of the volume arrives in Seattle and 60% in Los Angeles, and the port processing fee for federal processing at both locations is $5.00 per CBM.

GSCM 520 RANK Let's Do This/gscm520rank.com