Lockheed Martin Additive Manufacturing

Slides:



Advertisements
Similar presentations
Fischer Manufacturing is an electrical fabrication company based in New Brighton, MN. We specialize in building to engineering specified requirements.
Advertisements

Opening the Chassis There are two screws at the top of the system and three at the base that should be removed to enable to (Delete) removal of the rear.
RockOn! Canister Integration RockOn! 2009.
Optical Manufacturing Solutions 1 Probe Assembly.
Installation. Indoor Unit Installation Typical Installation.
Laser Enclosure to Elevated Rail Assembly Wyman Gordon Forging Locator Original Revision: 2/14/2013.
Getting Started with your Diagnostic Station Getting Started with your Diagnostic Station.
Installation Instructions. Delivery Light fixtures, mounting structures and electrical components ship together Poles ship on a separate truck.
Northwest Natural 12” Pipeline Integrity Project Team Members Jon Ziring Zack Lemmon Long Nguyen Academic Advisor Faryar Etesami NWN Sponsor Advisors Ross.
OHT 14.1 Galin, SQA from theory to implementation © Pearson Education Limited 2004 Software quality infrastructure components The need for procedures and.
Electrosurgical Life-test Fixture Team E.L.F. Design Review Mechanical Engineers Mary Hamann Brad Watson Naomi Sanders Electrical Engineers Tony Giedl.
TT Assembly Structure Reference-Reinforcement System: 1.Description of the system 2.Assembling Procedure 3.Production Project Board, march 2005 D.Orlandi.
Solid Performance Solutions This presentation was created to give you the ideas and support to present “Rethinking New Product Training Development” in.
Candela Display Systems 3x2 Interactive Video Wall System.
Autodesk Inventor ® Professional Design, Validate and Document the Complete Machine Autodesk Inventor ® Professional Introduction.
Topcat with Access Technology. Features In-ceiling audio system Plenum rated Full-range audio Hybrid speaker solution Rich sound for multi-media Wireless.
Essential Standard 2.00 Understand the nature of business. 1.
Engineering Design Dein Shaw. Chapter 1 Introduction What is design?
Design Brief Introduction to Engineering Design. Why do you need a DB?  A Design Brief is essentially the specification by which one designs…  It creates.
1 CERTIFIED SOLIDWORKS ASSOCIATE (CSWA) EXAM Nov 26, 20119:00-12:00 Dec 3, :00-12:00 SEB1015 NOTES We’ll take registrations in November but you’ll.
Interviewer: Chris Meador. Introduction  J C Bamford Excavators Limited  Interviewee Background  Job Description  Typical Day  Positive/Negative.
Smart Vehicle Tracker Installation Guide AVT-2000B V2.10.
Abstract Introduction End Product & Deliverables Resources Project Requirements Team Members: Faculty Advisors: Client: Team Members: Faculty Advisors:
Design for Manufacture and Assembly Introduction Note: this is an adaptation of a presentation from Dr. Denis Cormier, intended for use as an Intro to.
P11211, P11212, P11213 Land Vehicle for Education System Team: Michael Deyhim & Megan Ott Project Description: The Land Vehicle for Education, or LVE,
Getting Started with your Diagnostic Station Your ADC ADVIEW Diagnostic Station Unpacking the contents, you will find… Quick start guide (a printed version.
The Infirno by Lockheed Martin Lockheed Martin, a global security and aerospace company, developed a turrent-mounted infrared system Titled “Infirno”,
Redesigning an Electric Toothbrush Dora the Explorer Merna Hanna Chris Valez Lauren Gabryluk Floyd Dorazio.
Lockheed Martin Project Matt Moreno, Shane Heacox, Bailey Dickson Group 4 EDSGN 100 Section 8 Design Project #2.
USB Port Bracket Presented by: Elizabeth Roach, Filbert Giovanni, Elijah Lazar, Simran Soni April 26, 2016 Professor: Junfeng Ma.
USB in the USA Tyler Joseph Reimer, Sang Jun Han, Lukas Shaw Smugar, Alexa Marguerite Trautz.
REVOLVING USB HUB By Amir Amiri, Zachary Rollman, Joseph Deptula, Emily Branstetter Advised by Junfeng Ma 4/21/2016.
Lockheed Martin Additive Manufacturing Introduction to Engineering Design EDGSN 100 Section 002 Family First Designs/ Team 5 (Carolyn Baker,
Lockheed Martin Additive Manufacturing Introduction to Engineering Design EDGSN 100 Section Girls 1 Guy / Team 8 Rebekah Moshier,
EDGE™ Preliminary Project Plan P09102 – METEOR Stage Separation System JJ Guerrette (ME)
Replacement of Vehicle Bridge over Spring Creek
Lockheed Martin Additive Manufacturing
Smart Trash Bin Project
Sustainability in Marcellus Shale Development
Detachable Percutaneous Endoscopic Gastrostomy Tube (PEG) Tube
Replacement of Vehicle Bridge over Spring Creek
Replacement of Vehicle Bridge over Spring Creek
Sustainability in Marcellus Shale Development
Lockheed Martin Additive Manufacturing
Replacement of Vehicle Bridge over Spring Creek
Sustainability in Marcellus Shale Development
Sustainability in Marcellus Shale Development
Sustainability in Marcellus Shale Development
Introduction to Engineering Design
Freight, Fuel, & Emissions
Replacement of Vehicle Bridge over Spring Creek
Walter Ortiz, Shane Scott, Hidayah A Shukor, Shawn Clark
Freight, Fuel, & Emissions Presented to: Prof. Berezniak
Teacher training resource: Robotic Assembly
Software Development Initiation Planning Design Analysis Development
P16462: Wind Energy Base Station MSD II Phase 4 Review 4/15/2016
Bonneville Power Administration Aerial Line Cart Progress Report
This shows the bracket (blue) and part of the metal end of one of the lines (red) the bolt is removed (green)
EXAMPLE 1-1 Defining the Problem and Developing Alternatives
Replacement of Vehicle Bridge over Spring Creek
Replacement of Vehicle Bridge over Spring Creek
EXAMPLE 1-1 Defining the Problem and Developing Alternatives
Chapter 11: Software Configuration Management
Improvement Report This is a template to be used to summarize and report on an intervention in the work place using the OU/BWC developed tools to improve.
Replacement of Vehicle Bridge over Spring Creek
INTRODUCTION TO SUPPLY CHAIN MANAGEMENT
Lockheed Martin Additive Manufacturing
Teacher training resource: Robotic Assembly
Bunker Wall Design Wall ESS
Radiopharmaceutical Production
Presentation transcript:

Lockheed Martin Additive Manufacturing Introduction to Engineering Design EDGSN 100 Section 002 Rebridgerators / Design Team 4 Derrick Andreassi, personal.psu.edu/daa5344, daa5344@psu.edu Gabe Ferreri, personal.psu.edu/gzf5062, gzf5062@psu.edu Jimmy Nowoswait, personal.psu.edu/jpn5202, jpn5202@psu.edu Stephen Gordon, personal.psu.edu/sfg5219, sfg5219@psu.edu Presented to: Prof. Berezniak Date: 04/29/2016

Purpose The purpose of this presentation is to present a redesigned USB Hub Mounting Bracket as a debug and auxiliary mounting device for a custom avionics mission system requiring fewer parts Use this slide to create a new slide—use this template slide if you would prefer to have a Penn State blue background for your slides. 2

Background Mounting brackets are typically used to hold USB Hubs in place on a given surface while preventing attached cables from being disconnected Use this slide to create a new slide—use this template slide if you would prefer to have a Penn State blue background for your slides. 3

Sponsor Lockheed Martin is headquartered in Bethesda, Maryland and is a global security and aerospace company. The company employs nearly 126,000 people around the globe. Specifically, Lockheed Martin is involved in research, development, design, manufacturing, integration, and technology systems sustainment Use this slide to create a new slide—use this template slide if you would prefer to have a Penn State blue background for your slides. 4

Project Description The Design Team came to the conclusion that the new bracket could easily be made in SolidWorks. The redesigned Mounting Bracket is meant to reduce the number of assembly parts and provide a vertical installation configuration Use this slide to create a new slide—use this template slide if you would prefer to have a Penn State blue background for your slides. 5

Procedures (1 of 2) The design team first began by sketching possible alternatives based on previous designs. In an effort to improve the economic efficiency the new bracket design, materials were removed where they were deemed unnecessary for the bracket Use this slide to create a new slide—use this template slide if you would prefer to have a Penn State blue background for your slides. 6

Procedures (2 of 2) Once a final concept for the new alternative bracket was visualized, the design team used SolidWorks to create a 3-D model of the bracket. , the SolidWorks model of the mounting bracket that was created ended up having a unique, cage-like design Use this slide to create a new slide—use this template slide if you would prefer to have a Penn State blue background for your slides. 7

Results and Discussion New Model Total Unique Part Count: 1 Total Part Count: 1 Base Hub Enclosure: 1 Power Retention Bar: 1 USB Retention Bar: 1 Screws: 6 Washer: 0 Lock Washer: 0 Original Model Total Unique Part Count: 6 Total Part Count: 27 Base Hub Enclosure: 1 Power Retention Bar: 1 USB Retention Bar: 1 Screws: 8 Washer: 8 Lock Washer: 6 Use this slide to create a new slide—use this template slide if you would prefer to have a Penn State blue background for your slides. 8

Conclusions and Recommendations The re-designed bracket is unibody rather than the original six unique parts. Retention bars for both the power and USB are part of the unibody and are essentially prongs that are close enough together to ensure the wire does not slip through. Rather than eight screws, washers, and lock washers, there are now only six screws and zero washers and lock washers Use this slide to create a new slide—use this template slide if you would prefer to have a Penn State blue background for your slides. 9

Closing The new 7-port USB hub has minimized total part count by about 20 parts. Made with the correct material, this design is the best prototype. Working on this project was very enjoyable and we welcome any other tasks and future projects. Use this slide to create a new slide—use this template slide if you would prefer to have a Penn State blue background for your slides. 10