Fully Integrated and Automated Project Processes – The Vision

Slides:



Advertisements
Similar presentations
Increasing Capital investments
Advertisements

Amitava Mitra, Solution Architect, Oracle Primavera, TCS
FIATECH’s Capital Projects Technology Roadmap: how we can use it today Ric Jackson Director The FIATECH Consortium National Streamlining Conference Washington,
QUALITY MANAGEMENT DEFINITIONS AND CONCEPTS QUALITY MANAGEMENT TOOLS QA / QC PROCESS COMPUTERS AND PROJECT QUALITY.
INDUSTRIAL & SYSTEMS ENGINEERING
Information Technology for Construction: Recent Work and Future Directions in W78.
OPERATIONS and LOGISTICS MANAGEMENT
Electronic Business Systems
Irwin/McGraw-Hill Copyright © 2001, The McGraw-Hill Companies, Inc. All rights reserved. I n t r o d u c t i o n t o I n f o r m a t i o n S y s t e m.
Electronic Business Systems
Construction Category Management Planning Version 1.1 (May 2015)
CPI Conference 2001 Education Tools and How to Access Them Education Committee Chris Hyvonen Kiewit Chris Hyvonen Kiewit.
FIATECH CII Annual Conference Nashville, Tennessee Bill Brubaker NASA Washington, D.C.
© 2010 Chevron A Day in the Life of a Project Manager Presented by Nancy Grossman, Project Manager Presented to Chabot College Engineering Class September.
“Integrating Standards in Practice” 10th Open Forum on Metadata Registries July 9-11, 2007 New York City, NY USA An international conference to share and.
Engineering Productivity Measurement Research Team Engineering Productivity Measurement Research Team Bob Shoemaker BE&K Bob Shoemaker BE&K CPI Conference.
Achieving Interoperability for Equipment Supply Chains Mark Palmer FIATECH AEX Project Leader National Institute of Standards and Technology.
CMAA 2010 Owners Forum Joe P. Gionfriddo May 3, 2010 Corporate Engineering Global Construction Manager The Procter & Gamble Company.
Chapter 8 Transaction Processing, Electronic Commerce, and Enterprise Resource Planning Systems.
The Value Driven Approach
June 17, 2009 Michael W. Howard, Ph.D. Sr. Vice President The Interoperable Smart Grid Evolving.
Unit 18: CADD in Construction Lesson Objective Be able to explain the use of Building Information Modelling in buildings.
IEEE IT (Information Technology) Strategy – 2005 Unapproved.
Benchmarking in the Information Technology Age Dave Hile Cherne Contracting Corporation CII Benchmarking & Metrics Committee 2000 CII Annual Conference.
1 Financials Advisory Board April 06, Office of State Finance Agenda FAB Purpose Responsibilities Project Updates Introductions/ New FAB Members.
Slide 1 PDT Europe 2014, October 2014, Paris 1 AeroSpace and Defence Industries Association of Europe Through Life Cycle Interoperability as developed.
1 3:00 PM, EST. 2 Don Hewitt Vice President, Business Operations OSEHRA Ramina Toy Program Manager Brad Triebwasser.
How Can the Federal Electronics Challenge (FEC) Help You? Federal Environmental Symposium June 5, 2007 Cate Berard U.S. Environmental Protection Agency.
PORTFOLIO COMMITTEE MEETING PRESENTATION ON THE APP AND BUDGET ALLOCATION FOR THE YEAR 2016/ th APRIL 2016.
Community of Practice K Lead Project Team: الالتزامالتحفيز التفكير المؤسسي المرونةالتميزالشراكةالاستقامة.
Engineering Productivity Measurement
Procurement Development Programs
Module 1: Overview of Information System in Organizations
Integrating CII Best Practices into Project Teams
NATIONAL e-STRATEGY Presentation to the Portfolio Committee on Telecommunications & Postal Services DG: ROBERT NKUNA AUGUST 2017 Building a better life.
Delivering on the Vision of FIAPP
Enterprise / Production System Interface Expand Internally/Externally
Energy Management System (EnMS) Awareness
Management Information Systems
CIM Modeling for E&U - (Short Version)
Electronic Simulation in Construction
Transaction Processing Systems
Multiple Partnering Consortium
Evaluating Onsite Design Project Team
Multi-state Corridor Pooled Fund Program
HERE Seminar “Universities and social engagement”
Carl Holmes Christy Lee
Education Tools and How to Access Them
Draft Strategy To Optimize Resource Management of Storm Water
Procurement’s Impact on Logistics.
Overview – Guide to Developing Safety Improvement Plan
The Life Cycle of a Project – START to FINISH
Contents A GENERIC IT BALANCED SCORECARD
Overview – Guide to Developing Safety Improvement Plan
Chapter 7 e-Business Systems.
By Jeff Burklo, Director
Chapter 7 Electronic Business Systems
GENERAL SERVICES DEPARTMENT Facilities Management Division PROOF-NM Project (Process Re-engineering & Optimization of Operations & Maintenance Functions.
Project Information Management Jiwei Ma
Infra program Project outline Jouko Kankainen
Lifecycle Data Management An EPC&M Perspective
Enterprise Resource Planning, 1st Edition by Mary Sumner
Strategic Inventory Positioning in Capital Project Supply Chains
Enterprise Resource Planning (ERP) Systems
Chapter 7 Electronic Business Systems
Technology Department Annual Update
NİŞANTAŞI ÜNİVERSİTESİ
An Introduction to LiFE
UML Design for an Automated Registration System
Presentation transcript:

Fully Integrated and Automated Project Processes – The Vision FIAPP Steering Team Reg Gagliardo Burns & Roe CII Annual Conference 2001

Discussion Items Overview of FIAPP and FIAPP-related players Review relationship between CII FIAPP Steering Team and FIATECH Present Steering Team’s mission and goals Summarize key objectives of FIAPP Vision Encourage feedback and participation

FIAPP ≠ CII FIAPP ST ≠ FIATECH What Is FIAPP? FIAPP is: a concept a vision an ideal end state FIAPP is NOT: a product an organization FIAPP ≠ CII FIAPP ST ≠ FIATECH

How can FIAPP & FIATECH be of benefit to all of us? The Challenge Types of CII Members Owners and operators Engineers and designers Constructors Suppliers Academics Differing Functions Differing Focuses Differing Needs How can FIAPP & FIATECH be of benefit to all of us?

FIAPP FIAPP Players An Industry Vision FIATECH Consortium: RD&D Owner Operator Forum CII FIAPP Steering Team Others FIAPP An Industry Vision Industry: Products, Conferences, Web Sites, Print CCIS: Research Reports Academia: Conferences, Web Sites, Print CII Research Teams: Best Practices CII New Technologies Web Site

Both working to achieve the FIAPP Vision FIAPP Steering Team FIATECH Strategic – Overarching Articulate Vision Theory – Vision Investigate FIAPP products in industry Report It – What’s Happening For CII Members – 15-20 reps on ST; $K/yr = FIAPP info, Best Practices Tactical – Targeted Implement Vision Practice – Reality Roll out FIAPP products for industry Do It – Research, Develop, and Deploy For FIATECH Members – 50+ mbrs; multi-$100k/yr = “Projects” with Products Both working to achieve the FIAPP Vision

Team Mission and Goals We are a steering team, not a research team. Develop the FIAPP vision, keep it in front of CII. Communicate FIAPP benefits and issues. Contribute FIAPP ideas to CII Research Committee.

Team Mission and Goals (continued) Communicate CII FIAPP needs to providers of FIAPP products and services. Provide a clearinghouse for FIAPP ideas. Promote understanding and use of FIAPP.

(coordinate/monitor) FIAPP Steering Team Roadmap Industry Workshops State of Practice Case Studies Networking (coordinate/monitor) Vendor Conferences Owner Research Sites Contractor FIATECH Sloan CCIS Constr. Non-Const CII RT’s CII Other

Communications FIAPP Steering Team Web site Research recommendations Reports

Current Capital Facilities Process Plan Design Procure Construct Start-Up Operate and Maintain People/Training – Organization/Partnering/Team Building Project Processes/TQM – Project Controls/Change Management Contracts (Disputes Resolution) Information Technology Systems RFIs Scope/ Alignment Bid/ Proposals Project Management O&M System Materials/ e-Commerce Submittals Design Review Owner Designer Suppliers Constructor Operator

Key Objectives of FIAPP Vision Enable one-time entry of data (multiple reuse) Permit free flow and flexible use of information Simplify and automate activities/processes and information flow Enable collaboration between owners, designers, specialists, contractors, and suppliers. Support all phases of facility life-cycle (EPCOM) Integrate EPCOM processes, functions, and activities

Key Objectives of FIAPP Vision (continued) Improve execution and financial performance through: Improved efficiency and productivity Higher quality and accuracy Reduced schedule and cycle times Improved supply chain management Enhanced communications

Examples of Current FIAPP Initiatives and Tools Smart software tools for analysis and design Integrated databases Expanded use of electronic plant models for: Integrated and collaborative design Construction sequencing and scheduling Construction and procurement statusing Maintenance and operations planning and training Visualization and simulation of material and process flows

Examples of Current FIAPP Initiatives and Tools (continued) Project Web sites (project management and e-Commerce) Direct submittal of design information for procurement, manufacturing, and fabrication

Where FIAPP May Go in the Future Field communications via cameras and computers Automated material receipt verification, location Material inventory control/just-in-time delivery Integrated progress monitoring systems Construction from a 3D model without “drawings” Standard construction material nomenclature Electronically gridded job site for erection control and material location Mechanical manipulators to position and hold pipe, steel equipment in position

Issues to Consider During the Conference Are we on the right track? What do you like? What would you improve/change? FIAPP focus priorities Inter (FEP - D - P - C - SU - O&M) Intra (Phase Specific: FEP, D, P, SU, O&M) Interactions with FIATECH Tell us what you’d like to see in the Vision. Tell us which processes need FIAPP most.

FIAPP Steering Team Jeff Brubaker Texaco Reg Gagliardo Burns and Roe Deb Grubbe DuPont Steve Hagan GSA Steve Jones Primavera Mike Mayra GM Kent Reed NIST Joe Rhodes Aramco Services Todd Sisti Washington Group Tony Songer Virginia Tech John Voeller Black & Veatch Phil Zicarelli BE&K