Purchasing supplies at CERN

Slides:



Advertisements
Similar presentations
Anglia Ruskin University European Preparatory Visits Grants Scheme.
Advertisements

REPLACEMENT AND MAINTENANCE OF LIFTS GIVING ACCESS TO LHC UNDERGROUND AREAS TENDERING PROCEDURE IT-4056/EN 105 December 2014 Floris Bonthond.
ESA UNCLASSIFIED – For Official Use POLAND AND THE EUROPEAN SPACE AGENCY Dr. Christina Giannopapa Coordination with Member States Office, Director General’s.
Recruitment Kick-Off Meeting in Geneva. Kick-Off Meeting in Geneva: Budget and FinancesSlide Recruitment Outline 1.Who can be recruited?
TENDERING PROCEDURE IT- 3927/EN
INVITATION TO TENDER PROCEDURE INVITATION TO TENDER PROCEDURE IT – 4123/EN Supply, Replacement and Repair of Crane Rails.
INVITATION TO TENDER PROCEDURE INVITATION TO TENDER PROCEDURE IT–4103/EN/LHCb Design, Supply, Installation and Commissioning of an HVAC system, a Smoke.
Doing business with CERN Anders Unnervik 3 November 2014.
Make it Smart&Creative ICM Cluj-Napoca, 21st April 2015.
Purchasing supplies at CERN Procurement Strategy Dante Gregorio FP-PI.
Doing business with CERN Anders Unnervik Ankara 5 October 2015.
DESIGN, SUPPLY, INSTALLATION AND COMMISSIONING OF HEATING, VENTILATION AND AIR-CONDITIONING (HVAC) SYSTEMS FOR THE PS ACCELERATOR INFRASTRUCTURE TENDERING.
CERN as a World Laboratory: From a European Organization to a global facility CERN openlab Board of Sponsors July 2, 2010 Rüdiger Voss CERN Physics Department.
© Enterprise Europe Network South West 2009 The Eurostars Programme Kenny Legg R&D Funding for the Environmental Sector – 29 June 2010 European Commission.
SFT News 16 th June CERN/FC/5806/RA2 Return Coefficient Industrial return Austria Belgium Bulgaria Switzerland.
INVITATION TO TENDER PROCEDURE INVITATION TO TENDER PROCEDURE IT–4134/EN/LHC Supply and Commissioning of HVAC Systems for Five LHC Surface Buildings B.
INVITATION TO TENDER PROCEDURE INVITATION TO TENDER PROCEDURE IT–4082/EN Design, Supply, Installation and Commissioning of the ventilation of the BAF3.
Doing business with CERN Anders Unnervik 20 May 2014.
Purchasing supplies at CERN Procurement Rules Someone FP-PI.
INVITATION TO TENDER PROCEDURE INVITATION TO TENDER PROCEDURE IT–4154/EN Supply Centrifugal Water Pumps B. Jenssen
PROCUREMENT RULES FOR EXPERIMENTS AT CERN Dante Gregorio CERN Procurement Service.
INVITATION TO TENDER PROCEDURE INVITATION TO TENDER PROCEDURE IT – 4142/EN Supply, Installation, Testing and Commissioning of the HVAC System for the.
INTERNATIONAL BUSINESS Unit 2 Business Development GCSE Business Studies.
Best Sustainable Development Practices for Food Security UV-B radiation: A Specific Regulator of Plant Growth and Food Quality in a Changing Climate The.
CERN Procurement Procedures for the HL-LHC project Civil Engineering work London, 24 June 2016 Lisa Bellini-Devictor, CERN/IPT-PI.
CERN Procurement Procedures Rome, 28 th June 2016 Adam Horridge.
2016 Floris Bonthond 31 May Agenda – Procurement at CERN 2 What does CERN buy? Procurement budget Industrial Return and Return Coefficients.
TowerJazz : 18 July 2017 Charles Carayon (Procurement Officer)
Doing business with CERN Anders Unnervik
THE EUROPEAN UNION How does the structure of government within the EU compare with the structure of government in the United States?
Agenda Procurement organization and budget What does CERN buy?
Doing business with CERN Anders Unnervik
Introduction to Procurement
Doing business with CERN Dante Gregorio (dante.
Purchasing supplies at CERN
Options for association and collaboration with CERN
INVITATION TO TENDER PROCEDURE IT-4344/EP Design, Supply, Installation, Testing and Commissioning of a Cleanroom extension for the integration of ATLAS.
Invitation To Tender Procedure
Invitation To Tender Procedure IT – 4327/SMB Technical specification for the civil Engineering works for the construction of the new building.
PRAG PRACTICAL GUIDE TO CONTRACT PROCEDURES FOR EXTERNAL ACTIONS
DISTRIBUTION AUTOMATIC - GENERATION
Purchasing supplies at CERN
PRAG PRACTICAL GUIDE FOR CONTRACT PROCEDURES
Cooperation between CERN and Ukrainian Industries 2017
TENDERING PROCEDURE IT-3981/EN
Ways to industry participation in CLIC 24th October, 2017
ALIGNMENT RULE PROCEDURE
EU members countries Import Export GDP % import + export in GDP
IT-4328/EN Bidders conference
The 1680 Family’s Reach.
History Dec 2015, FC Discussion about contract splitting
GLEB planning 05 March 2018.
The European Parliament – voice of the people
The European Parliament – voice of the people
Намалување на загадувањето на воздухот со електромобилност
Protection of the EU budget
Working with Steelcase Order Fulfillment Team EMEA
EU: First- & Second-Generation Immigrants
ESF FINANCIAL EXECUTION ESF Technical Working Group Meeting June 2018
Adriatic Persian Gulf Map Test #1 Answers.
Regional Accounts
European Union Membership
ALIGNMENT RULE PROCEDURE
ESF FINANCIAL EXECUTION ESF Technical Working Group Meeting June 2018
Adriatic Persian Gulf Map Test #1 Answers.
European representation of respiratory critical care HERMES participants. European representation of respiratory critical care HERMES participants. Countries.
ESF FINANCIAL EXECUTION ESF Technical Working Group Meeting June 2018
IT-4464/EN Bidders conference
Update on Derogation Reporting
Prodcom Statistics in Focus
Presentation transcript:

Purchasing supplies at CERN Procurement Rules and Procedures Supply contracts exceeding 200 kCHF Charles Carayon IPT-PI – 4 October 2017

Procurement function @ CERN 1. Close link between the procurement function and CERN organizational objectives and strategies; 2. Unlike private sector where the focus is profit, CERN is accountable to the taxpayers of its Member States whose money is being spent, including disappointed bidders and potential suppliers; 3. Procedures and practices have been put into place to stand up to the scrutiny of auditors and Member States on purchasing decisions made. Purchasing Supplies exceeding 200kCHF — Procurement Rules

Procurement objectives @ CERN Ensure contracts fulfil all the necessary: Technical requirements Financial requirements Delivery requirements Keep overall costs for CERN as low as possible; While achieving balanced industrial returns for the CERN Member States. Purchasing Supplies exceeding 200kCHF — Procurement Rules

Definition Supply contracts: Contracts for supplies of equipment including: R&D contracts, Telecommunications and insurance contracts, Maintenance and leasing contracts covering data processing, printing and telecommunication equipment. Purchasing Supplies exceeding 200kCHF — Procurement Rules

Purchasing Supplies exceeding 200kCHF — Procurement Rules CERN — 15/08/11 Purchasing Supplies exceeding 200kCHF — Procurement Rules

Purchasing Supplies exceeding 200kCHF — Procurement Rules CERN — 15/08/11 Purchasing Supplies exceeding 200kCHF — Procurement Rules

Announced Invitations to Tender (IT) https://found.cern.ch/java-ext/found/CFTSearch.do Purchasing Supplies exceeding 200kCHF — Procurement Rules

List of firms participating to Market Survey (MS): Firms proposed by Technical Officer Firms registered in CERN’s Supplier Database (by Procurement Officer) Firms having expressed an interest Firms proposed by ILOs and Delegations Purchasing Supplies exceeding 200kCHF — Procurement Rules

Technical auditing of tendering package Purpose: Review MS and IT documents Ensure Procurement Rules are complied with 2 phases: MS: Simplified Technical Auditing IT: Specification Committee Participants Technical Officer (TO) Procurement Officer Head of TO’s Dept. or representative A representative from HSE Unit A technical expert from another dept. Head of Procurement Service or representative If necessary, another representative appointed by chairman; e.g. Legal Service Purchasing Supplies exceeding 200kCHF — Procurement Rules

Award on ‘Lowest Compliant’ basis i.e. to the firm whose bid: Adjudication Award on ‘Lowest Compliant’ basis i.e. to the firm whose bid: complies with the technical, financial and delivery requirements and is the lowest taking into account the origin of the offer in order to ensure balanced industrial return coefficients for the Member States Purchasing Supplies exceeding 200kCHF — Procurement Rules

Adjudication Price based on ‘Free Carrier’ basis (FCA as per Incoterms 2010), i.e.: Without transport costs With packing and loading No disadvantage to firms located in distant countries However, if the ratio of DAP price (‘Delivered at Place’ as per Incoterms 2010) of the lowest FCA bid to the lowest DAP bid exceeds 1.10, Supply contracts shall be adjudicated on a DAP basis. Purchasing Supplies exceeding 200kCHF — Procurement Rules

Industrial Return Coefficient For Supply contracts and for a 12-month period starting on 1st March, defined as: “The ratio between a Member State's (MS) percentage share of all purchases of supplies (excluding purchases funded by non-MS) during the preceding four calendar years and that State's percentage contribution to the budget over the same period”. Return Coef. = % expenditure in the MS % contribution to CERN budget for this MS Purchasing Supplies exceeding 200kCHF — Procurement Rules

Industrial Return Coefficient Very poorly balanced  < 0.30 (<0.4 as of March 2018) Poorly balanced (PB)  0.30 ≥ x < 0.90 Well balanced (WB)  ≥ 0.90 (≥ 1 as of March 2018) Supply contracts (period 1/03/2017 to 28/02/2018): Well balanced : Bulgaria, Czech Republic, France, Hungary, Italy, Switzerland; Poorly balanced: Austria, Belgium, Denmark, Finland, Germany, Netherlands, Pakistan*, Poland, Portugal, Romania, Serbia*, Spain, Sweden, United Kingdom; Very poorly balanced: Cyprus*, Greece, India*, Israel, Norway, Slovakia, Slovenia*, Turkey*, Ukraine*. *Associate Members Purchasing Supplies exceeding 200kCHF — Procurement Rules

Origin of the Offer According to standards defined by EU: “the country(ies) where the supplies (including their components and sub-assemblies) are manufactured or undergo the last major transformation by the contractor or his sub- contractor” If at least 60% of the total amount of the bid comes from a poorly balanced MS, then the whole bid will be treated as that from a bidder in a poorly balanced MS Purchasing Supplies exceeding 200kCHF — Procurement Rules

Alignment Rule (Scenario 1) Lowest bid from a PB MS contract placed with it Bid (CHF) Well balanced MS Poorly balanced MS Contract Purchasing Supplies — Procurement Rules

Alignment Rule (Scenario 2) Lowest bid from a WB MS realignment rule applies if bid difference <20% Bid (CHF) <20% Well balanced MS Poorly balanced MS Purchasing Supplies — Procurement Rules

Alignment Rule (Scenario 2) Lowest bid from a WB MS (a) 1st bidder from PB MS aligns contract placed Bid (CHF) <20% Well balanced MS Poorly balanced MS Contract Purchasing Supplies — Procurement Rules

Alignment Rule (Scenario 3) Lowest bid from a WB MS (b) if not, 2nd lowest bidder from PB MS aligns contract placed Bid (CHF) <20% Well balanced MS Poorly balanced MS Contract Purchasing Supplies — Procurement Rules

Alignment Rule (Scenario 4) Lowest bid from a WB MS (c) if no alignment, contract placed with lowest bidder from WB MS Bid (CHF) <20% Well balanced MS Poorly balanced MS Contract Purchasing Supplies — Procurement Rules

Contract splitting CERN will give priority to bidders offering supplies or services originating in a poorly balanced Member State in case of splitting, provided their bids fall within 20% of the lowest bid. CERN — 15/08/11 Purchasing Supplies — Procurement Rules

Contract splitting, Scenario 1 Lowest bid from a PB MS, another bid from a PB MS falls within 20% of the lowest bid Bidder from PB MS aligns Contracts placed with the 2 lowest bids from PB MS Bid (CHF) <20% Well balanced MS Poorly balanced MS Contracts Purchasing Supplies exceeding 200kCHF — Procurement Rules

Contract splitting, Scenario 2 Lowest bid from a WB MS and two bids from PB MS fall within 20% of the lowest bid Both bidders from PB MS align Contracts placed with bids from PB MS Bid (CHF) <20% Well balanced MS Poorly balanced MS Contracts Purchasing Supplies exceeding 200kCHF — Procurement Rules

Contract splitting, Scenario 3 Lowest bid from a WB MS and only one bid from PB MS falls within 20% of the lowest bid Lowest bidder from PB MS aligns Contracts placed with the lowest bid and the bid from PB MS Bid (CHF) <20% Well balanced MS Poorly balanced MS Contracts Purchasing Supplies exceeding 200kCHF — Procurement Rules

Award: Communication of relevant information to bidders is limited to: Procurement Service (< 750 kCHF) Head of Procurement Service or a member of Directorate (≥ 750 kCHF) Purchasing Supplies exceeding 200kCHF — Procurement Rules

Accessing Procurement Website http://procurement.web.cern.ch/ Purchasing Supplies exceeding 200kCHF — Procurement Rules