Risk assessment GSM-R blocking

Slides:



Advertisements
Similar presentations
Operations of District and Provincial Environmental Committees. An E-Learning Course for the National Environment Management Authority (NEMA) in Kenya.
Advertisements

Activities in CEPT ECC/WGFM/ Project Team FM54
World Meteorological Organization Working together in weather, climate and water Assistance for Haïti Side meeting 9 March 2010 RA IV Hurricane Committee.
Reliability Software1 Reliability Software Minimum requirements & Best practices Frank Macedo - FERC Technical Conference July 14, 2004.
Ray Tracing A radio signal will typically encounter multiple objects and will be reflected, diffracted, or scattered These are called multipath signal.
Propagation loss models Lab 4 Engr. Mehran Mamonai.
Shashika Biyanwila Research Engineer
Frequency Co-ordination -for what? The Agreement Frequency Co-ordination -Advantages Frequency Co-ordination -Disadvantages The Procedure Administrative.
SUMMER 2005 JUNE Preparing an Organizational Change Management Plan Org Change Management Activities by Project Phase.
0-1 Team # Status Report (1 of 4) Client Contact –Point 1 –Point 2 Team Meetings –Point 1 –Point 2 Team Organization –Point 1 –Point 2 Team #: Team Name.
0-1 Team # Status Report (1 of 4) Client Contact –Status Point 1 –Status Point 2 Team Meetings –Status Point 1 –Status Point 2 Team Organization –Description.
First Generation (1G) Alison Griffiths C203 Ext:3292
First Generation Justin Champion C208 Ext:3273. First Generation What we will look at 1 st Generation technology Analogue signals Frequency Division Handover.
Nadi, Fiji, 4-6 July 2011 Digital dividend from broadcasting and mobile perspectives Cristian Gomez Head, Validation Group, Space Services Division, ITU-R.
SSC Page 1 Frequency Agile Spectrum Access Technologies Presentation to FCC Workshop on Cognitive Radios May 19, 2003 Mark McHenry Shared Spectrum Company.
Model Verification of Short Range High Impact Weather in Central Florida Christopher Hicks Department of Marine and Environmental Systems Florida Institute.
Radio Interference Calculations
NBTC/ITU Workshop on Cross-Border Frequency Coordination June , 2015 Bangkok, Thailand István Bozsóki Head of Division BDT/IEE/SBD 1.
DPG HEALTH MEETING USAID CONFERENCE ROOM 6 NOVEMBER 2013 International Health Regulation (2005)
#UIC ERTMS World Conference 1. – 3. April 2014, Istanbul UIC Rail System Department UIC ERTMS World Conference Dirk Schattschneider UIC Frequency Manager.
Regulatory Impact on Deployment in the United States - or - Non-commercial deployment of un- licensed radio networks will be more successful than.
High Power RFID Trials in Australia Gabriel Phillips, GS1 Australia.
United Nations Economic Commission for Europe Transport Division United Nations Economic Commission for Europe Transport Division Konstantin Glukhenkiy,
M O V E – Management – Of – Vibration – Emissions/Exposure.
NAVSTAR GPS Mike Mickelson KD8DZ 08 Dec GPS BASICS.
Overview of Service Rules: Technical Issues Phase II 220 MHz Service (Auction No. 72) Gary Devlin Engineer, Mobility Division Wireless.
UIC ERTMS World Conference ERTMS Baselines Pio GUIDO, Head of ERTMS Unit Istanbul, 2 April 2014.
Overview of Service Rules and Due Diligence Keith Harper Electronics Engineer Mobility Division, WTB March 7, 2007 BROADBAND PCS Auction No. 71 Seminar.
Technical Issues, Due Diligence and Licensing Parameters Keith Harper Engineer Mobility Division, WTB June 10, 2008 Auction 78 Seminar BROADBAND PCS.
Using Bayesian Nets to Predict Software Defects in Arbitrary Software Lifecycles Martin Neil Agena Ltd London, UK Web:
By: Nthabiseng Mosupye GITO Portfolio Committee 30/05/
Connections are loose for draining pump Water in From street Water out to house This is the setup for public water Pressure and the pump system turned.
Overview of Service Rules: Technical Issues Gary Devlin Engineer Mobility Division, WTB December 3, MHz SMR Auction No. 55 Seminar.
European Social Fund Promoting improvement 15 th March 2016 Nigel Finch.
By: Mark Reed.  Protecting information and information systems from unauthorized access, use, disclosure, disruption, modification, or destruction.
Spectrum Policy Technological Solutions for Policy Problems Allen Petrin ©2003 all rights reserved 1 System Architecture for a Dynamic-Spectrum.
IS&T Project Reviews September 9, Project Review Overview Facilitative approach that actively engages a number of key project staff and senior IS&T.
Community Speed Watch Scheme Mobile Vehicle Activated Signs Lee Quincey - Safe & Sustainable Team Manager June 2016.
ICAO Regional Spectrum Seminar, Cairo, Egypt June 2006
GSM-R / Mobile coexistence National Cooperation/coordination Process
Cross Border Interference Management Current Issues of Cross Border Interference in Cambodia 1 Dr. KY-Leng (DDG of MPTC)
RFI Protection Activities in IAA RAS
Impact of wind farms on radio systems
EE359 – Lecture 2 Outline Announcements Review of Last Lecture
RFI Protection Activities in IAA RAS
Mobile Broadcast and Spectrum Issues (DVB-T) Workshop April 2003
Noise Maps and House Building – potential future influence on planning and design Peter Hepworth Tuesday 31st October 2006 Sustainable New Homes and.
Regional Preparatory Workshop for the ITU WRC-2015
Session II: System authority for ERTMS 4RP Trackside approval
“Safety precautions for urgent maintenance works or repair works on the railway infrastructure during train operations by using modern IoT / wireless solutions.
Business Practices Subcommittee Update
RAILWAY TRACK SNAP NOTIFICATION
WICI Presentation to FLEWUG
Align Project Risk Assessment
Radio spectrum for present and future rail transport needs
Radio spectrum for future railway applications
STEP 8 - CLOSING PHASE: TRANSITION SUPPORT
Interference in DVB-T reception resulting from LTE base stations
Spectrum Management and Monitoring Presented to Training participant, Kunming China Date: 21st April 2018 The Government of The Republic of Vanuatu.
Liaison statement and Request for Specification and Implementation of Harmonised Pan-European Emission Limits relevant for the GSM-R Operating Range.
IS&T Project Reviews September 9, 2004.
Cristian Gomez Head, Validation Group, Space Services Division, ITU-R
RADIO INTERFFERENCE IN BORDER AREAS
ICAO Regional Spectrum Seminar, Cairo, Egypt June 2006
Shashika Biyanwila Research Engineer
Neopay Practical Guides #2 PSD2 (Should I be worried?)
Spectrum Management System for Developing Countries (SMS4DC) Training on SMS4DC 12 – 14 Feb 2019 Vientiane, Lao P.D.R Aamir Riaz International Telecommunication.
Assumptions INFS 4810.
HSE Requirements for Pipeline Operations GROUP HSE GROUPE (CR-GR-HSE-414) EXECUTIVE SUMMARY This rule defines the minimum HSE requirements related to the.
Presentation transcript:

Risk assessment GSM-R blocking to support the coordination process in the Netherlands Loek Colussi June 30, 2014

Coordination agreement technical committee: UMTS/LTE900 will increase probability of blocking/intemodulation agreement between MNOs, GSM-R operator and regulator interim solution  sustainable solution mid 2015 no legal basis, appeal on social engagement single points of contact valid until July 1st 2015 June 30, 2014

Coordination process Before site activation information to regulator >1 week prior to activation base stations within 500 m from railway track probability of blocking  software tool/modeling & field measurements impact analysis  ‘severity map’ from GSM-R operator After site activation active monitoring by GSM-R operator report interference to MNO and regulator severe disturbance  switch off site/sector within 4 hours moderate disturbance  mitigation June 30, 2014

Pre-activation coordination process June 30, 2014

Post-activation interference management June 30, 2014

Risk of blocking/intermodulation Risk = Probability x Impact Probability of blocking determined by: simulations with coordination tool, translated to geografic picture measurements from railway detailed inspection feedback from field Impact of blocking determined by : annoyance/danger to be predicted location (station, shunt, port) expected train speed application of ERTMS June 30, 2014

Coordination tool ‘proportional method’ all block of MNO filled with UMTS GSM-R on highest channel (924.8 MHz) single MNO basestation (Tier 0) rural & suburban HATA propagation model fixed distance between GSM-R basestations good & bad radios with & without filters Tx power of MNO June 30, 2014

Model GSM-R radio June 30, 2014

Simulations with coordination tool rural suburban June 30, 2014

Translation to geografic picture for each 100 m railway bin: what is the distance to the nearest MNO basestation? what is the distance to the nearest GSM-R basestation? is the protection distance jeopardized? June 30, 2014

Geotool GSM-R: all basestations MNO: < 500 m from track analysis resolution: 100 m = GSM-R = KPN = T-Mobile = Vodafone = blocking June 30, 2014

June 30, 2014

Measurements June 30, 2014

Risk assessment Low risk: small chance of blocking according to simulation and measurement outside area of potential risk expected range of disturbance short special railway provisions High risk: large chance of blocking according to simulation or measurement inside area of potential risk expected range of disturbance large cumulation of signals June 30, 2014

Example: high risk June 30, 2014

Example: low risk June 30, 2014

Example: high or low risk? June 30, 2014