Planned Activities of GSICS Microwave sub-group

Slides:



Advertisements
Similar presentations
EUM/OPS/VWG/11/0361GEWEX/GlobVapour Water Vapour Workshop Issue 1 05/03/2011 EUMETSAT activities towards FCDRs for water vapour Slide: 1 Jörg Schulz EUMETSAT.
Advertisements

Global Space-based Inter- Calibration System (GSICS) Progress Report Mitch Goldberg, NOAA/NESDIS GSICS Executive Panel chair.
GSICS web meeting on Planning for Annual GSICS WG meeting Agenda.
Recommendations to GSICS from international working groups GSICS meeting, March 2015, New Delhi, India Rob Roebeling.
June, GSICS USER GUIDE Using GSICS Products and Services Manik Bali, Tim Hewison, Larry Flynn and Jerome Lafeuille 2016 GSICS Executive Panel Meeting.
GSICS Coordination Center Report Fangfang Yu, Fuzhong Weng, Fred Wu and George Ohring NOAA/Center for Satellite Applications and Research 8 April, 2013.
1.Bob Iacovazzi (NOAA) - Road to Pre-operational Phase Presentation 2.All – Discussion & Feedback 3.Tim Hewison (EUMETSAT) – Reminders: Korea, Conference,
Review of Methodology in Algorithm Theoretical Basis Document: MSU/AMSU Radiance FCDR Derived From Integrated Microwave Inter- Calibration Approach Chabitha.
Marianne König, Tim Hewison, Peter Miu
GSICS Procedure for Product Acceptance Update
GSICS MW products and a path forward.?
Summary Outcome of the First GSICS Users’ Workshop
NOAA/NESDIS/Center for Satellite Applications and Research
Introducing Me, GSICS, and the UV Sub-Group
Report to 8th GSICS Exec Panel
The Global Space-based Inter-Calibration System
In-orbit Microwave Reference Records
GSICS Review Summary Manik Bali.
Operational Aspects of GSICS
NOAA Inter-Calibrated MSU/AMSU Radiance FCDR Cheng-Zhi Zou
Second GSICS Users’Workshop:
Discussion of potential Beta Testing of GSICS Products
Analysis of free tropospheric humidity within CM SAF
Introduction to GSICS Mitch Goldberg (NOAA) For GSICS Executive Panel.
GSICS Microwave Sub-Group Summary Tim Hewison and Cheng-Zhi Zou
Microwave Sub-Group Updates
Strategy for Re-Analysis Products
Update from the GRWG/Microwave Subgroup
Overview of Global Space-based Inter-Calibration System (GSICS)
Fangfang Yu and Fred Wu 22 March 2011
Actions and Recommendations of the Joint Session
Larry Flynn and Manik Bali
M. Goldberg NOAA/NESDIS Z. Cheng (QSS)
Closing the GEO-ring Tim Hewison
Manik Bali1 Cheng-Zhi Zou2 and Ralph Ferraro2 1ESSIC/CICS, 2NOAA
Building-in a Validation cycle for GSICS Products
NOAA GSICS Processing and Research Center
Combining Multiple References
Use of NWP+RTM as inter-calibration tool
Tim Hewison1 (1) EUMETSAT
GSICS MW products and a path forward.?
WGCV-GSICS interactions
NOAA/NESDIS/Center for Satellite Applications and Research
GSICS Collaboration with SCOPE-CM IOGEO
Update on GSICS Product Development
Infrared Inter-Calibration Product Announcements
GRWG MW-SubGroup Candidate GSICS products – Window Channels
Inter-calibration of the SEVIRI solar bands against MODIS Aqua, using Deep Convective Clouds as transfer targets Sébastien Wagner, Tim Hewison In collaboration.
MW Products and Deliverables
NOAA/NESDIS/Center for Satellite Applications and Research
NOAA/NESDIS/Center for Satellite Applications and Research
Where do we stand on GSICS MW products?
Frank Ruethrich, Viju John, Rob Roebeling, Tim Hewison EUMETSAT
Use of GSICS to Improve Operational Radiometric Calibration
Hot summary of the Fourth GSICS Users Workshop
GSICS Products’ Improvements and Developments
GRUAN / GSICS Cheng-Zhi Zou and Tony Reale NOAA/STAR
Proposed best practices for Simultaneous Nadir Overpass (A Discussion)
Jörg Schulz (EUMETSAT) - Re-calibration of Meteosat archive using HIRS
Introduction to GSICS : Organisation, Membership and Scope
SCOPE-CM Statement of Needs John Bates (NOAA, SCOPE-CM Executive Panel Chair) Lothar Schüller (EUMETSAT, SCOPE-CM Secretariat)
Formation of IR Sub-Group and Reference Selection
Tim Hewison1 and all GSICS Developers EUMETSAT
GSICS Product Development Plan for Microwave Instruments
Second GSICS Users’Workshop:
Proposed best practices for Simultaneous Nadir Overpass (A Discussion)
IASI / AIRS / CRIS cross-calibrations 5a 0:20
Ideas for NRT Microwave Imager inter-calibration products
2s. Defining GSICS Products and Deliverables
GSICS Newsletter Microwave mini issue
Presentation transcript:

Planned Activities of GSICS Microwave sub-group Agenda GRWG web meeting: Planned Activities of GSICS Microwave sub-group • Introductions • Proposed strategy for Microwave sub-group • Presentation by Cheng-Zhi Zou on (A)MSU/SSU work at NOAA • Presentation by Bob Iacovazzi on AMSU SNO work NOAA • Scope of group • Representation of microwave inter-calibration activities • Membership of the GSICS microwave sub-group Agenda & Date of Next Meeting

GSICS Microwave Strategy 0. Form microwave sub-group of GRWG Review Existing Calibration Activities Scope Users’ Requirements Identify Requirements met by Existing Activities Work with developers towards GSICS compliance Identify Requirements not met by Existing Activities Consider development of new products within GSICS Define Inter-Calibration References and Traceability Work together with NIST to develop standards & guidelines Ensure Consistency between Different Products Through traceability

1. Existing Calibration Activities 08 June 2018 1. Existing Calibration Activities Already much work on microwave inter-calibration Microwave Sounders (i.e. MSU/AMSU) Radiance level products (level 1c) NOAA : SNO NCAR: GPSRO Microwave Imagers GPM X-cal: Windsat-TMI-AMSRE by Vicarious Calibration NOAA: SSM/I by SNOs Bias Monitoring NWP Centres: Bias monitoring system for data assimilations NOAA: Double-differences and SNOs Check SSM/I?

2. Scope Users’ Requirements 08 June 2018 2. Scope Users’ Requirements Who are GSICS users? – Consult at Users’ Workshops Internal – to generate level 2 products & Re-processing NWP centres reanalysis development SCOPE-CM projects Satellite Application Facilities (CM-SAF) and NOAA CDR program produce TCDRs & ECVs What do the GSICS users want? Which instruments/channels/time periods, etc...? e.g. MSU/AMSU, SSM/I Recalibrated radiances? What is not met by existing activities? We can approve external products meeting GSICS standards GSICS Products: GSICS Bias Monitoring GSICS Correction – Near Real-Time or Re-Analysis? Inter-calibrated level 1c radiances For MSU/AMSU, only available: NOAA SNO recalibrated level-1c products Check scope-cm

3. Requirements met by Existing Activities NOAA SNO recalibrated level-1c FCDR have been assimilated into the new generation of NCEP CFSR and NASA MERRA reanalyses; improved bias correction pattern were achieved. NOAA SNO recalibrated level-1c FCDR can successfully removed the time-varying inter-satellite bias, which may cause spurious climate signals when these satellite measurements are used for climate product retrievals and reanalysis data assimilation.

4. Requirements not met by Existing Activities For historic microwave observations, there is no absolute calibration standard and hence inter-comparison is required to determine the absolute truth (cannot be resolved by inter-calibration) For future microwave observations, SI traceable standard that meets climate accuracy requirements is needed (See next slides)

5. Microwave references and traceability NIST is interested in developing standards & guidelines Microwave Brightness Temperature Standard Blackbody SI traceable Standard Reference Microwave Radiometer Well-characterised Improving evaluation & documentation of uncertainty Best Practice document To aid designers in standardizing procedures & analysis True SI traceability is the long-term goal Steps towards that are now achievable

6. Future Activities NOAA expects to submit MSU/AMSU-A historical inter-calibration products to the GPPA for demonstration mode distribution within a few months. In the planned next GSICS web meeting: Cheng-Zhi Zou (NOAA) will present his algorithm Bob Iacovazzi (NOAA) to follow up with a presentation on his analysis of near-realtime AMSU-A SNOs

7. Summary GSICS Microwave Sub-group Scope: Coordination Rapportage Review Certification of external products as GSICS-compliant Development of GSICS Products To Review: Different calibration methods SNO Statistical Analysis Method (regional/global) NWP Double-Differencing Method Requirements met by the activities Reference Instruments/Traceability Membership Internal: from GSICS from GRWG/GCC External: to represent each major activity in microwave inter-calibration

Scope of Group Rapportage/Coordination with other inter-cal activities Definition of users’ requirements for microwave inter-calibration Support development of guidelines & standards Certification of external products as GSICS-compliant Development of new inter-calibration products

Representation of Activities Rapportage/Coordination with other inter-cal activities

Membership of Microwave Sub-Group

Plan of Action Review existing activities & methodologies Review GSICS Users’ requirements Identify potential products to submit to GPPA Identify potential new products for development Support developments of standards and guidelines Timeline? Next Meeting Web meeting? GDWG/GRWG in Korea, 21-25 March 2011?