San Luis Potosi – New plant April 24th 2015

Slides:



Advertisements
Similar presentations
The process whereby human beings convert raw materials into finished products or useful goods designed to make ____ product ______ one on-site.
Advertisements

Durra Eco-Form Cabins Build your own home and move in within a week Fast, Simple and Affordable.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Beneficial Occupancy Readiness Evaluation Plan Update Brian Heneveld, P.E., CIH NSLS-II BORE Coordinator Conventional.
Engineering Services Planning Limited
Lessons Learned An Architectural Perspective April 21, 2005 René Tercilla, AIA, REFP Tercilla Courtemanche Architects, Inc.
Update on FCPS Construction/Renovation Projects August 2009.
Kitchen New sandwich prep table. Kitchen New pizza prep table.
DG Inyorkern Weekly Project Summary 1/17/14. DG Inyokern 1/17/14: Percentage Overview Demolition: Pad Prep: 100% Finished and ceriified Footing & Foundation:
Civil Engineering & Architecture 2.3 Residential Design.
IWTP Facility. Holes Drilled for Detailed Blast Drilling and Blasting for final grade prior to construction in 2011.
Muon g-2 Muon g-2 Experiment Quarterly Report Aria Soha All Experimenter’s Meeting March 2, 2015.
Cassidy Elementary – Renovation Architect: Tate.Hill.Jacobs: Architects General Contractor: D.W. Wilburn, Inc. Substantial Completion Date:August, 2010.
1 BROOKHAVEN SCIENCE ASSOCIATES Central Chilled Water Facility – Phase II Alan Raphael MPO Project Manager CFAC Committee Review November 9, 2009 Sub-basement/Pipe.
Industry information day INDUSTRY INFORMATION DAY Assembly & Installation Laurent Schmieder Buildings Infrastructure and Power Supplies Project.
1 Infrastructure issues Andy Nichols, STFC – RAL MICE Collaboration Meeting, Harbin, 13-17th January 2009.
Presentation Template
Site Plans.
ILCTA_NML Progress at Fermilab Jerry Leibfritz September 10, 2007.
1 MICE - INFRASTRUCTURE MICO meeting 7 th February 2008 Tim Hayler.
Architect Drawing of New Entrance. Location Location of Phase II Construction Project – Old tennis courts west of the existing building.
Board of Education Presentation 2015 Referendum Projects September 9, 2015 Update.
Lakes Creek Road Waste Transfer Station Construction highlights.
Facilities Modernization Program Funded by Measure B Project Report March 19, 2012.
Military Redevelopment – Kelly AFB to Port of San Antonio Tim Underwood Deloitte Consulting LLP May 2012.
Winchester Medical Center Campus Expansion June 21, 2011.
Magnetic Mitigation - Contents l Magnetic Mitigation General l West Wall Compressors l Rack Room 2 l Magnetic Shielding Yoke Jason Tarrant – Integration.
March 2015 ALLEN INDEPENDENT SCHOOL DISTRICT School Board Meeting March 2015 Construction Update for the Service Center.
PRESENTATION FOR POLO SETTIMO TORINESE PROJECT Nov.25 th.2009.
Project Update August 2008 Richard Rife Deputy Project Manager.
CENF – Civil Engineering Extension B887 Status – 02 October 2014 Done: (1/2) Preliminary civil engineering drawing and Functional specification approved.
SunSatFriThursWedTuesMon January
CENF – Civil Engineering Extension B887 Status – 18 September 2014 Done: (1/2) Preliminary civil engineering drawing and Functional specification approved.
EHN1 – EN/EL Progress update J. Devine G. Gross 11/02/16.
EHN1 – EN/EL Planning Lighting _ Containment_ Cabling J. Devine G. Gross 11/02/16.
OsC mtg 15/10/2014 MICE Step IV Alan Grant. Content Step IV – Construction Status – Finances – Schedule – Risks – Summary 2.
Construction Foundations of Technology Construction © 2013 International Technology and Engineering Educators Association STEM  Center for Teaching and.
Estimating and Scheduling CEE 492
LCLS-II Cryoplant Overview
ESKOM - MWP NEW ENERGY CENTRE Mechanical Installation 16 April 2014.
ILCTA_NML Progress at Fermilab Jerry Leibfritz August 16, 2007.
Br Anwar Hossain. BUILDING AREAS SQ. FT. PHASES1ST FLOOR2ND FLOORTOTAL 118,85017,55036, ,55317,99551, ,658 29, ,370 36, ,833 23,666.
Museum of Islamic Art Project Package # 3 Site Logistics and Progress Presentation.
WBS Experiment Infrastructure: LArTF GPP Project Status Dixon Bogert Prepared for the MicroBooNE Collaboration Meeting 11/02/12.
Preparing For A REAC Inspection Presented by: Patrick Ortiz Lead Housing Programs Analyst New Mexico Mortgage Finance Authority (505)
Aerial of the full site facing northeast taken on March 1, 2016.
Foundations of Technology Construction
Temporary Works – P8 Project Practice.
CBETA Technical Review
San Luis Potosi – New plant MAY 8TH 2015
Eagle P3 Project Update RTD Board of Directors Sept. 2, 2014.
CE Status: Activities executed until 03/08 and ongoing
Status of the cryogenic system for B180
Pinole-Hercules Water Pollution Control Plant Upgrade Project
Minuteman Vocational Technical Regional High School Progress
HANDICAPPED PEOPLE RESIDENT
Carleton College Summer 2018 Science and Campus Construction Plan
Hopewell Valley Regional School District
Value of contract: Length of contract: Contract start date:
Woodlane Timber, Hucknall
House Construction Budget Plan
Far Experimental Hall Hutches Civil Construction
Far Experimental Hall Hutches Civil Construction
Foundations of Technology Construction
ESS Project Status Roland Garoby – Technical Director August 2018.
Minuteman Vocational Technical Regional High School Progress
One Point & Two Point Perspective
Minuteman Vocational Technical Regional High School Progress
Minuteman Vocational Technical Regional High School Progress
Minuteman Vocational Technical Regional High School Progress
Linac4 Connection Broken Line 07/08/19
Presentation transcript:

San Luis Potosi – New plant April 24th 2015 HOME San Luis Potosi – New plant April 24th 2015 Schedule and Description Process

HOME Schedule program 2015-2016

HOME 2016-February 1st Area of paint shop ready for paint shop erection Area between B-1 and E.5-4 •Status Progress expected • Watertight ( roof) above the defined area • Foundations of the paint shop completed : 100% of the main pit • Slab completed • Paintshop mezzanine civil work, slab, masonnery done • Pit and mezzanine stairs, hand rails on the mezzanine • Painting of the structure above this area • Sprinkler above this area installed • Lighting above this area installed • Walls and fences all around the site

2016-March 1st HOME Area of paintshop ready for paintshop erection Area between A-1 and F-6 • Status- Progress expected • Watertight (roof) • Slabs in the area completed • Walls, cladding, doors : line 1, from A1 to A-5, from F-1 to F-6 • Paintshop trench/civil work completed • Crane gantry girders /rails completed with rails survey/dimensions • Painting, sprinkler, lighting completed above the area • Fire pumps room and tanks foundations • Outside utilities pads : silos, chillers pads, RTO pad

Paintshop and technical rooms - crane bay HOME 2016-April 1st Paintshop and technical rooms - crane bay • Building and canopy watertight (roof) and building airtight ( walls, doors, louvers, …) • 100% of the building and canopies slabs • 3 docks in F-6 operational • All the rooms above and below the mezzanine completed including sprinkler, lighting, painting. • Raw material room and grinder room completed • Specified finishing of the paintshop rooms completed • Utilities rack in the crane bay ( line B ) • Fire pumps room, water tanks completed • Guard houses

2016-April 15TH HOME Utilities 2016 • All utilities connected ( water, natural gas, sewer) • Electrial power certified : at least temporary permit for the main building • Injection bay completed including sprinkler, painting, lighting • Server room civil work

2016-May 1st HOME • Fire protection / commissionning 2016 • Fire pumps room, water tanks completed • 95% of the sprinkler in main building, canopies, offices • Guard houses • Server room completed ( including painting, sprinkler, power ) • Punch lists for all the areas, utilities, activities • Commissionning of the equipement in the building scope : 60% done • Training : 50%

2016-June 1st HOME Delivery of the site 2016 – June 1st • Final occupancy permit • Delivery of 100% of the buildings and offices • 100% of the commisionning of the building scope • Documentations, • Training : 100% done

New Plant Project