10 Steps – Follow these and you're on the way to Reduced ELFs, 100% ToC and Happy End Users 1 - Before traveling to the PCP, the Engineer run a FastTest.

Slides:



Advertisements
Similar presentations
NetComm Wireless Dial on Demand Feature Spotlight.
Advertisements

GP Patient Survey Mouse-click your way through step-by-step instructions Software Installation Guide.
EdTech BootCamp Session #6 Presented By: Daniel Greening and LeRoy Wong, Apple Support Specialists
11 TROUBLESHOOTING Chapter 12. Chapter 12: TROUBLESHOOTING2 OVERVIEW  Determine whether a network communications problem is related to TCP/IP.  Understand.
Network Layer and Transport Layer.
Lecture 9 Resistors in series and parallel Kirchoff’s laws
Engineering H193 - Team Project Gateway Engineering Education Coalition P. 1 Spring Quarter 2008 Robot Programming Tips Week 4 Day 2 By Matt Gates and.
On-Line Database Placement Application Tutorial. How to Change Your Information On York’s System.
MSO Access Network Alerts 17 th December Background  Objective – Update on the success of a pilot to identify Major Service Outages in the access.
Google (LBC) Local Business Center Free Listing, Free Updates, and ( New ) Free Insights Organize your Ownership Listing for enhanced Optimization and.
9/8/20151 Voice Mail Training for State Employees Presented by: Stacy Knickerbocker Telecommunications Specialist DOA/ITSD/NTSB
Starter System Service Chapter 33 Page 439. Service Begins with Checking System Check the battery first –Voltage should be 12.6 and while the starter.
Unemployment Insurance (UI) Initial Claim Filing Guidance.
Booting. Booting is the process of powering it on and starting the operating system. power on your machine, and in a few minutes your computer will be.
10.7 Cells in Series and Parallel (page 310). A “dry cell” is another term for a battery. Dry cells can be put together in two ways to change the energy.
DEBUGGING. BUG A software bug is an error, flaw, failure, or fault in a computer program or system that causes it to produce an incorrect or unexpected.
1 The UAX13 - Dialling the First Digit The UAX13 Group Selector is seized by a calling earth from the associated linefinder and returns a holding earth.
TEKS 5.6B Demonstrate that the flow of electricity in circuits requires a complete path through which an electric current can pass and can produce light,
C3 confidentiality classificationIntegrated M2M Terminals Introduction Vodafone MachineLink 3G v1.0 1 Vodafone MachineLink 3G Connect on demand Feature.
Boosting a Car Battery Cables should have sufficient length (12-16-ft) with #6 gage stranded wire and well-designed clips. Follow the proper sequence of.
1 Work Orders. 2 Generating a Work Order There are two methods to generating a Work Order in the WYNNE STSTEM. First method: Option 11 – 12 – 13 * Open.
Register training Click one of the boxes below to enter a training area Using “My 5 Day Timetable” The student view 1 Using the college register system.
IPitomy SIP Trunks 101 Programing and activating SIP Trunks with IPitomy’s assisted turn-up.
SuccessFactors - Frequently Asked Questions FAQs Question: I don't have easy access to a computer at work. What other options do I have? Answer: SuccessFactors.
Wireless Networking What You need to remember. What you need: A wireless router (Microsoft MN-700 Wireless router shown) A Wireless Adapter (Microsoft.
Filing the FCC Form 471 E-rate Program Applicant Training
Current Electricity and Circuits
Electric Circuits.
Welcome to BLT Online NQT Induction.
CASD Mobile Labs.
Tracking Students Throughout the Scholarship Season
Applied Software Testing
Traceroute traceroute is a Unix utility designed by Van Jacobson in 1987 The Windows equivalent is called tracert The Linux equivalent is called tracepath.
Live Customer Support Solution
Student SOLE Page – Living Page
Acquirly Review Generation Setup and Overview
Patient access Forgotten password
Cisco Router Technology
P2 REVISION – CHAPTER 7– Electricity
MS Office 2010 Activation Errors 0xc004f074
How to Navigate MyNaropa
Placing an order for Etherway Fibre and Etherflow Connected
New Functionality in ARIN Online
Placing an order for Etherway Copper
Register training Using the college register system
Conditions and Ifs BIS1523 – Lecture 8.
Electricity Chapter 17.4.
Telephone & Exchange Tester ETET 30
Why it is required and how to confirm
Lesson 1: Simple Circuits
General Data Protection Regulations
Electricity is a flow of electrons.
Telephone & Exchange Tester ETET 30
Direct Current Circuits
Ombudsman Services Good for consumers – Good for business EHU Update 2nd November 2016 Sue Jackson – Relationship Manager Jay Ross- Energy Sector Expert.
Why it is required and how to confirm
Parallel and Series Circuits
Series and Parallel Circuits
F-1 Student Regulations.
Stress Management Techniques
You must log in using both you address and your Full name before proceeding
Types of application letter
Approvals Mobile User Interface WORK BETTER.
Raising a Customer Controlled SFI (CCSFI) fault Version 1
Electricity Chapter 17.4.
Raising a Fault Version 1
Electric Circuits Circuits control the movement of electric current by providing paths for electrons to follow. The path of an electric circuit is.
How to raise a fault on Business Zone
TEKS 5.6B Demonstrate that the flow of electricity in circuits requires a complete path through which an electric current can pass and can produce light,
Housing Selection Guide FALL 2019
Presentation transcript:

10 Steps – Follow these and you're on the way to Reduced ELFs, 100% ToC and Happy End Users 1 - Before traveling to the PCP, the Engineer run a FastTest 2 to check current condition of the line Gives a good reference point, your test should be as “Good” when you close the job – If it isn’t, check what have you changed 2 - Drive to cabinet and set up RWG as required and check for any damage to the fabric of the PCP. If you find any you must report this to the DCU Sometimes out records are incorrect, so by using a CPI tone, this will ensure you have the correct E and D side for your job – Always make sure its your Circuit on E & D 3 - On opening of the cabinet check that the earth bonding if required is in good condition, if not contact the DCOE or your manager for advice 4 – Confirm E side routing using the correct adaptor lead via 17070,if unable to identify use CLI tone 17070 with either DN or OGEA., you must then prove the D side routing by tracing the jumper, don’t take the quoted routing as correct. If you find that this is different from what is quoted on the Job you must take a note of this and update the routing on completion of the task. Its essential that this Sync test is performed, it will identify any potential port failures, DOA and subsequent ELFs that comes as a result. 5 - Make sure you leave the jumper connected at the D-side as a marker. run jumper from correct copper e side to quoted fibre d side pair. 6 - Check dial tone passes through the fibre pairs by testing at the E side fibre pair using either your test phone or by requesting a tone Once you have connected the Fibre E to Copper D, allow 3 minutes since previous test – This stops the test systems sending back a failed Test 7 - Connect your test Rig to the fibre E Side and run GEA service test for SYNC (minimum 3 minutes), FT2 opt 3,1,8,1 - You Must have a fully charged battery pack 50% or more 8 - Run jumper from fibre E side to copper D side but before you connect to the D side copper pair check once more that you have the correct dial tone before proceeding and make sure you have achieved sync on your modem for more than 3 minutes. ( this is really important to allow test system to register a good test.) Complete a “No Break Test, using the correct adaptor leads. Initiate the ECLIPSE test on the actual pair of wires – Note via Fastest. 9 - Connect jumper from E side fibre pair to copper D side pair and Allow 3 minutes since previous test. Using the correct test leads connect to circuit via a “non break” connection , to start the final test, ONLY using ECLIPSE as the first option. Once test initiated remove test leads from the circuit. If you don’t get “GEA service test and no fault found” on the GEA and as “Good “a test as your baseline on the copper results then don’t close the job. Instead check all your work in the PCP. 10 - You will receive 2 Text messages with same time on them. 1 for copper results & 1 for GEA results. If GEA says “GEA service test completed and no fault found.” then close job as complete. FINALLY - Make sure before you leave site you update routing and records if any changes are required and report all defects via a1024