FNAL recent coupler troubles

Slides:



Advertisements
Similar presentations
6/Nov/2012 TTC Meeting 1 Improvement of cavity performance by T-mapping/X-ray-mapping, optical inspection and local grinding Kirk.
Advertisements

KEK cavity status, March 2011 H. Hayano, ALCPG11, WG3, Eugene.
SRF Cryomodule Assembly Facility Plans Tug Arkan AAC, May 10-12, 2005.
ILC08 Chicago Global Design Effort 1 Discussion of Optical Inspection and Temperature mapping Results Several new inspection and mapping systems.
Status of RFCC-Module Development Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory MICE Collaboration Meeting at INFN-LNF, Frascati,
201 MHz NC RF Cavity R&D for Muon Cooling Channels
1.3 GHz SRF Cavity R&D Plan Jiyuan Zhai ILC Group, IHEP 3 rd IHEP-KEK 1.3 GHz SRF Meeting, 7 Dec 2010, Beijing.
ESS cavities interfaces
SRF Cryomodule 2 Cavity Test Results Andy Hocker TD/SRF Dev Dept. All Experimenters Meeting, 10-OCT-2011.
Cavity status; recent KEK activities : Hayano (1) STF CM-1 cavities are; MHI-014: 3-rd VT:36MV/m (finished) MHI-015: 3-rd VT: > 18.4MV/m.
Status of crab crossing studies Presented by NAKANISHI Kota (KEK) 2008/1/25.
FNAL Cavities for S1 Global Jim Kerby ALCPG 09. FNAL Deliverables Discussed in meetings 15/16 July and 10/11 Sept, and Webex and s 9/30/20092FNAL.
STF EP, VT commissioning by FNAL AES001 H. Hayano, KEK
9-cell cavity coordination CM Ginsburg 8 Mar
TILC09 / SCRF Session Update on S0 Work in the Americas Region Mark Champion, Fermilab With slides provided by: Zack Conway, Cornell Rongli Geng, Jefferson.
LCLS-II Power Coupler Nikolay Solyak, Ivan Gonin, Andrei Lunin C.Adolphsen - SLAC TTC meeting, March 23-27, 2014 AWLC2014, FNAL, May 12-16,
Parallel session summary ML/SCRF L. Lilje, H. Hayano, N. Ohuchi, S. Fukuda, C. Adolphsen (with help of Chris Nantista) TILC09,
Nikolay SolyakILC-GDE, Beijing, Feb.4-8, Fermilab 3 rd Harmonic Cryomodule Status N.Solyak, H. Edwards, D.Mitchell, M.Foley, T.Khabiboulline, E.Harms,
Americas Region: T4CM Status and Plans H. Carter TD SRF Dev. Dept. July 14, 2006.
Global Design Effort 1 S0 Status High-Gradient cavities Lutz Lilje DESY supplement by H. Hayano 04Sep2008 EC
Americas Cavity Specification C.M. Ginsburg (Fermilab) On behalf of the Fermilab cavity crew October 20, 2010.
Dec/1/2015WG3 in TTC Meeting Test Result of STF-2 Cryomodule Kirk Jun/2013Jul/2015 Preliminary.
Superconducting rf test facility LCWS 2010 in Beijing, 28 Mar 2010, Ken Watanabe Replica-method and local grinding repair K. Watanabe (KEK) LCWS 2010 in.
FNAL efforts on LHC Crab Cavity R&D (Proposals for R&D sub-tasks, resources and schedule) Nikolay Solyak.
Summery of the power coupler session at the LCWS13 workshop E. Kako W.-D. Möller H. Hayano A. Yamamoto All members of SCRF WG November 14, 2013.
(1)[12~13/Dec/2009] Optical inspection (2)[14/Dec] frequency & field flatness measurement (3)[10/Mar/2010] pre-EP (5μm) (4)[11/Mar] EP1 (100μm) (5)[11/Mar]
E. KAKO (KEK) 2009' Oct. 26 ILC KEK Global Design Effort 1 Cavity Preparation for S1-Global Eiji Kako (KEK, Japan)
Medium Beta Cavities Paolo Michelato, Paolo Pierini, and Carlo Pagani INFN Milano - LASA.
Medium beta cavities Paolo Michelato, Paolo Pierini, Carlo Pagani INFN Milano - LASA.
Update on S0 Work in the Americas Region Mark Champion 17 June 2008.
KEK-STF Vertical Test and Diagnostics Brief History & Future Plan Vertical Test Facility Cavity Diagnostic System Example of MHI#7 Cavity Summary of T-mapping.
Americas S0 Cavity (Tesla-style) Test Philosophy and Test Status results from JLab, Cornell and FNAL C.M. Ginsburg (FNAL) GDE SCRF Meeting April 21, 2008.
S1-Global status report KEK Norihito Ohuchi 2008/11/171ILC08-GDE-Meeting-Chicago.
Status of the TTF-3 RF Power Coupler Activity Andrei Lunin, Ken Premo, Tug Arkan Feb
Update on S0 Work in the Americas Region Camille Ginsburg (FNAL) 2 June 2009 Slides/Info from: Zack Conway (Cornell) Rongli Geng (JLab) Genfa Wu, Dmitri.
Recent FNAL/ANL Cavity Performance C.M. Ginsburg (FNAL) On behalf of the FNAL/ANL Cavity Crew TTC Meeting - Milano 28.Feb.-3.Mar
Gradient Degradation Experience at Fermilab (NML/CM-1) Elvin Harms TTC Meeting, Beijing 5-8 December 2011.
All Metal Gate Valve from VAT
9-cell cavity coordination CM Ginsburg 15 Mar
SRF Collaboration Shekhar Mishra Fermilab. Overview Charge: Does the laboratory make effective use of collaboration and existing SRF capabilities at other.
Americas Report C.M. Ginsburg (FNAL) for the FNAL/ANL, JLab, and Cornell (no report this time) cavity teams S0 Meeting 7.June 2011.
Developments of new treatment techniques for SRF cavities at KEK HORIZONTAL HPR FOR PERFORMANCE RECOVERY Yoshiyuki MORITA Motivation of developing HHPR.
JLAB Cryomodule Assembly Facilities Visit Report Tug Arkan, Yuriy Orlov March 26, 2012.
Prototype Cryomodule FDR Ken Premo 21 – 22 January 2015 High Power Coupler Design.
Guillaume Olry on behalf the IPN Orsay SPIRAL2 team TTC Meeting – Milan, 28 Feb-3 March 2011.
Rongli Geng ILC Cavity Group Meeting October 25, 2011
Cornell Updates Commissioning of T-map for ILC single cell starts.
Strategy and Status of Reference Cavities for European XFEL
Field Emission Minimization for LCLS-II
Status and plans for the 3.9 GHz section of XFEL
ILC10 Beijing Global Design Effort
Electropolishing of Dressed ILC 9-cell Cavity
Energy (ILC) and Intensity (Project X) SRF Cavity Needs
for the FNAL/ANL, JLab, and Cornell cavity teams
WG-1 Session Cavity Performance Cryomodule Performance
S1-G cryomodule assembly status
S0 Status report from KEK
Production Cavities in progress
R&D Activity for Field Emission and Vertical EP
Jiyuan Zhai ( IHEP ) TTC Meeting, JLAB, 6 Nov 2012
SNS Fundamental Power Coupler History
Quality control study with single-cell cavities
Modified TTF3 Coupler Design and Related R&D for LCLS-II
V. Veshcherevich Cornell University
Main Coupler R&D at DESY
Degradation and possible sources Statistic of resonators
IHEP ILC Cavity Status Jiyuan Zhai (IHEP)
TTC Meeting, 28 February - 2 March, 2011, Milan
Cavity Degradation Experience at S1-Global
Cavity & Cavity Integration; recent KEK activities
Presentation transcript:

FNAL recent coupler troubles General coupler handling: TTF3-type couplers purchased from CPI Quality control, cleaning, room temperature conditioning at SLAC Sent to FNAL in clean room bag / Pairs of cold-end parts arrive mounted on coupling waveguide used for conditioning at SLAC Blown with dry nitrogen in FNAL clean room, using particulate counter, before assembly to cavity Additional room temperature and cold conditioning in FNAL Horizontal Test Stand before full cavity test Coupler photos and related information from Tug Arkan, Andy Hocker, Andrei Lunin, and many others from the FNAL/ANL cavity team

Ginsburg TTC Meeting - Milano TB9ACC013 Vertical qualification test 41 MV/m at JLab (1st EP, 1st test, 8.Dec.2008), retested without processing at FNAL for statistically consistent 38 MV/m Preparation for horizontal test: Titanium transition ring welding at Sciaky Helium vessel welding at MP9 HPR at FNAL/ANL horizontal test assembly at MP9 including coupler, magnetic shielding, tuner, etc. In horizontal test, initially achieved 37 MV/m, then heavy FE after an arc event finally reaching max 35 MV/m, with FE onset 20 MV/m (Feb.2010) Disassembly, HPR, re-assembly for horizontal test Defect seen on copper coating of inner rim of input coupler flange [see photo] Optically inspected cavity coupler region with Questar system, saw nothing unusual Reassembled for second horizontal test with different coupler after HPR Second horizontal test: FE onset 5 MV/m, 20 MV/m max. (Jul.2010) Lots of field emission seen already during cold coupler conditioning Since cavity performance during 2nd test was even worse than at the end of the 1st test, perhaps an additional failure mechanism was present Both couplers were blown clean and returned to SLAC for analysis 1.Mar.2011 Ginsburg TTC Meeting - Milano

Ginsburg TTC Meeting - Milano TB9ACC013 Coupler Photo shows feature in copper coating 1.Mar.2011 Ginsburg TTC Meeting - Milano

Ginsburg TTC Meeting - Milano TB9ACC016 Vertical qualification test 39 MV/m at JLab (2nd EP, 3rd test, 10.Feb.2010), shipped clean and sealed to FNAL Preparation for horizontal test: Titanium transition ring welding at Sciaky Helium vessel welding at MP9 HPR at FNAL/ANL Horizontal test assembly at MP9 including coupler, magnetic shielding, tuner, … In horizontal test, heavy FE was seen: FE onset 18 MV/m, 27 MV/m max. (Oct.2010) Disassembly after horizontal test: Flakes were found on input coupler antenna tip [see photo] , size 0.1~0.2 mm Standard optical inspection of cavity equators and irises with KEK/Kyoto system; no obvious problem observed EDX measurement of flakes confirmed flakes were copper Coupler was blown clean and returned to SLAC for analysis 1.Mar.2011 Ginsburg TTC Meeting - Milano

Ginsburg TTC Meeting - Milano TB9ACC016 Coupler Photo shows flakes on a glove, after flakes were wiped off coupler antenna 1.Mar.2011 Ginsburg TTC Meeting - Milano