IFMIF/EVEDA – RFQ Legnaro Local Control System M. Giacchini INFN-LNL

Slides:



Advertisements
Similar presentations
LBT Q Eng/SW Review SFWG – Software Group General Norm Cushing.
Advertisements

André Augustinus 16 June 2003 DCS Workshop Safety.
Brian Martlew 25 th Sept 2006 MICE Control & Monitoring Plan Brian Martlew.
EPICS on TPS RF System Yu-Hang Lin Radio Frequency Group NSRRC.
Diagnostics and Controls K. Gajewski ESS Spoke RF Source Accelerator Internal Review.
IBL CO 2 cooling control system development status Lukasz Zwalinski – PH/DT/DI Maciej Ostrega – PH/DT/DI Florian Corbaz – EN/CV/DC.
Clara Gaspar, November 2012 Experiment Control System LS1 Plans…
EtherCAT for Advanced LIGO
NCSX NCSX Preliminary Design Review ‒ October 7-9, 2003 G. Oliaro 1 G. Oliaro - WBS 5 Central Instrumentation/Data Acquisition and Controls Princeton Plasma.
LIPAc status report EPICS Integration and Commissioning + RFQ LCS status at INFN/LNL Alvaro Marqueta LIPAc Project Team on behalf of the LIPAc Control.
RF power & FPC status Eric Montesinos, CERN BE-RF on behalf of all people involved, great thanks to all of them !
L.Jirden1 Update on Power Supplies DCS WS L.Jirden u Wiener u Caen u Global Support Contracts.
LEGNARO - LCS - LEGNARO - LCS - IFMIF/EVEDA – RFQ Legnaro Local Control System M. Montis INFN-LNL Monthly Collaboration Meeting - May 29, 2012.
André Augustinus 26 October 2004 ALICE Technical Board DCS for ‘services’ costs On behalf of Lennart Jirdén.
Overview of Tracker Interlocks Designed to protect tracker equipment, in particular the VLPC cassettes, from damage due to failure in part of the tracker.
Adrian Oates Daresbury Laboratory ALICE Control System July 08.
Eugenia Hatziangeli Beams Department Controls Group CERN, Accelerators and Technology Sector E.Hatziangeli - CERN-Greece Industry day, Athens 31st March.
R. Fantechi. TDAQ commissioning Status report on Infrastructure at the experiment PC farm Run control Network …
CERN, O.Pinazza: ALICE TOF DCS1 ALICE TOF DCS Answers to DCS Commissioning and Installation related questions ALICE week at CERN O. Pinazza and.
ECS and LS Update Xavier Vilasís-Cardona Calo Meeting - Xvc1.
News from LAL on Vacuum System Racks for cryotraps: call for tender done provider selected purchase of electro-tech components in progress prototype expected.
1 Mice Collaboration Meeting CM33 Glasgow University 25 th – 29 th June 2012 STFC Daresbury Laboratory Electrical Infrastructure Report Authors : Ian Mullacrane.
11 th February 2008Brian Martlew EPICS for MICE Status of the MICE slow control system Brian Martlew STFC, Daresbury Laboratory.
R. Krempaska, October, 2013 Wir schaffen Wissen – heute für morgen Controls Security at PSI Current Status R. Krempaska, A. Bertrand, C. Higgs, R. Kapeller,
T0 DCS Status DCS Workshop March 2006 T.Karavicheva on behalf of T0 team.
Project X RD&D Plan Controls Jim Patrick AAC Meeting February 3, 2009.
NML - RF Unit Test Facility Jerry Leibfritz Fermilab.
PX FY14 Budget PXIE Infrastructure R. Stanek J. Leibfritz.
Conventional Facilities integration: Approach and Issues Daniel Piso Fernández WP Leader (WP13 Conventional Facilities Integration Support) November 5,
110 th November 2010EN/CV/DC Detector Cooling Project - advancement status of Work Package N3 Thermosiphon project Michele Battistin 18 May 2011.
WA105, SC Collaboration Meeting, CERN, 07th March 2016 AIMARD B., LAPP BALIK G., LAPP BOURGEOIS N., CERN BRUNETTI L., LAPP CANTINI C., ETHz MURPHY S.,
ESS RFQ INTERFACES | Didier CHIRPAZ-CERBAT CEA-ESS INTERFACES.
CV works in the non- LHC accelerator complex during 2008 and plans for 2009 ATOP days 2009.
ELENA installation progress F. Butin / ELENA collaboration.
Andrew Faulkner April 2016 STFC Industry Day: Low Frequency Aperture Array Andrew Faulkner Project Engineer.
David BAILLEUX On behalf of the Caltech group Issues for the Laser Monitoring System M&O - US CMS ECAL IB meeting 19 March Chilled water supply.
Detector Safety System overview DSS is a PLC based system designed to protect ATLAS detector from damages. Front end (hardware) 2 redundant PLC ~700 input.
LBT Q Eng/SW Review SFWG – Software Group General Norm Cushing.
ITER & CODAC Core System Status Update
IFMIF/EVEDA – RFQ Legnaro Local Control System M. Giacchini INFN-LNL
Status & Plans for WA105 Control System
SESAME Control System Status
Software Overview Sonja Vrcic
IT Services Katarzyna Dziedziniewicz-Wojcik IT-DB.
MICE RF System Power Supplies, Control and Monitoring Status report
Introduction Functional Requirements (Stephanie) SLC Executive (Diane)
LCLS-II 2K Cold Box Controls Design Review
WinCC-OA Upgrades in LHCb.
LIPAc Control System Reliability improvements
XFEL Vacuum System Commissioning
WP02 PRR: Master Oscillator and RF Reference Distribution
Installation XFEL Tunnel WP 34
ACS news Circulator TCU: control tests in progress All cavity racks
SC1R Cold Box PDR Controls
TEST PLANS for HL LHC IT STRING
LLRF and Beam-based Longitudinal Feedback Readiness
Undulator Vacuum System
Prototype cryomodule development
Undulator Vacuum System
ESS Main Control Room & ICS Infrastructure
System Architecture of MPSVac and MPSID
Pierluigi Paolucci & Giovanni Polese
The spoke CM tests at FREIA
Ola Ingemansson Electrical & Instrumentation Engineer
Status of the ESS High Power RF Systems
Pierluigi Paolucci & Giovanni Polese
Vacuum Controls Stephen Schuh Tom Porter 25 October 2006
Target Safety System Interfaces
Vacuum Control System for Monolith Vacuum
LCLS Control System Personnel Linac & BC2 Controls progress
Presentation transcript:

IFMIF/EVEDA – RFQ Legnaro Local Control System M. Giacchini INFN-LNL

Outline Purchases Lipac Control System review Power tests status IFMIF-EVEDA –INFN Legnaro LCS RFQ LCS Monthly Meeting ,Legnaro, December 3, 2013

Purchases from Sept. SIEMENS HW IT HW ( RDO ) Lab Trolley Workstations Firewire cables D-SUB cables Scope HD docking station Still to buy: EPICS Acq systems Acknowledgements: Lava, D’Este IFMIF-EVEDA –INFN Legnaro LCS RFQ LCS Monthly Meeting ,Legnaro, December 3, 2013

CCS integration issues (sw) Archiver Alarm manager Integration between different LCSs: PVs, network bonding Common environment (a main topIFMIF, merge versioning sys) Network architecture ( CA gateway, ntp servers distribution) Central Deployment control management Central Virtual architecture management Central backup server CSS: build product customized to IFMIF -or- SNS version CSS-workspace location into topIFMIF MicroIOC software architecture porting softIOCs server: daemons topIFMIF/opcApp/db contains db-s to opc server (out of EPICS guidelines) OS: switch to CentOS 5 (maintenance updates till March 31st, 2017) Technical discussions are required, technical interlocutors are needed

CCS integration issues (hw) In order to perform the SECONDARY ELECTRICAL BOARD design we need information about the following topics: Have been already defined the cable trays path for RFQ cryogenic pump compressors ? Are these cable trays coming from secondary electrical board or LCS control Bays? Is a PPS interface requested for this board? (Ex. power cut in case of fire)   Couplers control stuff and cables We need details about the stuff and cable list for couplers control (vacuum, cooling, Arc detector)? Who is in charge of provided these cables? Cables to the vault Is there any problem to install cables already terminated with industrial heavy connectors? Are there some limits on connector dimensions? LCS MPS phisical interface interface: Elettrical interface standard (TTL, Clean contact etc..) for different interlock types (BRTZ, FBI,SBI, GVOI[ALL GV]) Elettrical interface standard for GV1 and GV2 signals Technical discussions are required, technical interlocutors are needed

Actions from previous meeting Assigned status Vacuum Rack transport to 3rd room Mauro, Maurizio, Loris Done Test of vacuum control system Maurizio, Loris, Carlo, Mauro Doing Cooling system specs Enrico Antonio Francesco IFMIF-EVEDA –INFN Legnaro LCS RFQ LCS Monthly Meeting ,Legnaro, December 3, 2013

Sub-systems status System status To do RF Fast acq. Completed Test on 3rd Bunch Length Monitor STM SW developed Bench test w power tests sensors PPS Water Cooling In progress Requirements, specs Vacuum Sub-system Debugging Architecture Ready Main server cloning, Archiver, re-boot tests, RF amplif interface IFMIF-EVEDA –INFN Legnaro LCS RFQ LCS Monthly Meeting ,Legnaro, December 3, 2013