IFMIF/EVEDA – RFQ Legnaro Local Control System M. Giacchini INFN-LNL
Outline Purchases Lipac Control System review Power tests status IFMIF-EVEDA –INFN Legnaro LCS RFQ LCS Monthly Meeting ,Legnaro, December 3, 2013
Purchases from Sept. SIEMENS HW IT HW ( RDO ) Lab Trolley Workstations Firewire cables D-SUB cables Scope HD docking station Still to buy: EPICS Acq systems Acknowledgements: Lava, D’Este IFMIF-EVEDA –INFN Legnaro LCS RFQ LCS Monthly Meeting ,Legnaro, December 3, 2013
CCS integration issues (sw) Archiver Alarm manager Integration between different LCSs: PVs, network bonding Common environment (a main topIFMIF, merge versioning sys) Network architecture ( CA gateway, ntp servers distribution) Central Deployment control management Central Virtual architecture management Central backup server CSS: build product customized to IFMIF -or- SNS version CSS-workspace location into topIFMIF MicroIOC software architecture porting softIOCs server: daemons topIFMIF/opcApp/db contains db-s to opc server (out of EPICS guidelines) OS: switch to CentOS 5 (maintenance updates till March 31st, 2017) Technical discussions are required, technical interlocutors are needed
CCS integration issues (hw) In order to perform the SECONDARY ELECTRICAL BOARD design we need information about the following topics: Have been already defined the cable trays path for RFQ cryogenic pump compressors ? Are these cable trays coming from secondary electrical board or LCS control Bays? Is a PPS interface requested for this board? (Ex. power cut in case of fire) Couplers control stuff and cables We need details about the stuff and cable list for couplers control (vacuum, cooling, Arc detector)? Who is in charge of provided these cables? Cables to the vault Is there any problem to install cables already terminated with industrial heavy connectors? Are there some limits on connector dimensions? LCS MPS phisical interface interface: Elettrical interface standard (TTL, Clean contact etc..) for different interlock types (BRTZ, FBI,SBI, GVOI[ALL GV]) Elettrical interface standard for GV1 and GV2 signals Technical discussions are required, technical interlocutors are needed
Actions from previous meeting Assigned status Vacuum Rack transport to 3rd room Mauro, Maurizio, Loris Done Test of vacuum control system Maurizio, Loris, Carlo, Mauro Doing Cooling system specs Enrico Antonio Francesco IFMIF-EVEDA –INFN Legnaro LCS RFQ LCS Monthly Meeting ,Legnaro, December 3, 2013
Sub-systems status System status To do RF Fast acq. Completed Test on 3rd Bunch Length Monitor STM SW developed Bench test w power tests sensors PPS Water Cooling In progress Requirements, specs Vacuum Sub-system Debugging Architecture Ready Main server cloning, Archiver, re-boot tests, RF amplif interface IFMIF-EVEDA –INFN Legnaro LCS RFQ LCS Monthly Meeting ,Legnaro, December 3, 2013