SPACE INTERNETWORKING SERVICES (SIS) AREA

Slides:



Advertisements
Similar presentations
1 Cross Support Architecture (CSAWG) Overview, Status, Goals Takahiro Yamada JAXA.
Advertisements

November SLS RFM and RNG REPORT 18 November 2004.
7-Apr-2014-cesg-1 Joint CMC-CESG Meeting NH Conference Centre, Nordwijkerhout, Netherlands Hosted by ESA/ESTEC 7 April 2014 CCSDS Engineering Steering.
30-March-2015-cesg-1 Martin Suess (AD) Rick Barton (DAD) SPACECRAFT ONBOARD INTERFACES SERVICES (SOIS) AREA.
Sep 2003 CCSDS Navigation WG Progress Report MOIMS Meeting Oct 2003 CSC, Maryland, USA Felipe Flores-Amaya CCSDS Navigation WG.
Apr12-cesg-1 Chris Taylor (AD) Stuart Fowell (DAD) SPACECRAFT ONBOARD INTERFACES SERVICES (SOIS) AREA.
Cesg-1 June 2010 Chris Taylor (AD) Stuart Fowell (DAD) SPACECRAFT ONBOARD INTERFACES SERVICES (SOIS) AREA.
10-Dec-2012-cesg-1 Chris Taylor (AD) Stuart Fowell (DAD) SPACECRAFT ONBOARD INTERFACES SERVICES (SOIS) AREA.
31 st October – 4 th November 2011 Fall 2011 Meeting Agenda Boulder, Colorado, USA SOIS Application Support Services WG Conclusions & Actions.
ESA UNCLASSIFIED – For Official Use Workshop #23 Pasadena, USA 23-27Mar15 Mario Merri, ESA/ESOC SM&C WG Plenary.
1 26 October 2005 Space Internetworking Services Report to the CCSDS Management Council 26 October 2005 R. Durst, D. Stanton.
Delta-DOR SIG: Report of the Fall 2007 Meeting Heppenheim, Germany October 5th, 2007 Roberto Maddè ESA/ESOC
Cesg-1 SLS REPORT 7 May 2010 Jean-Luc Gerner (AD) Gilles Moury (DAD) SPACE LINK SERVICES (SLS) AREA SLP and NGU sections Only.
Information Architecture WG: Report of the Fall 2010 Meeting October 29, 2010 Dan Crichton, Chair Steve Hughes (presenting) NASA/JPL.
November MOIMS AREA PLENARY NAVIGATION WG REPORT November 2004 CONSULTATIVE COMMITTEE FOR SPACE DATA SYSTEMS.
10-Dec-2012-cesg-1 Keith Scott (AD) Dai Stanton (DAD) SPACE INTERNETWORKING SERVICES (SIS) AREA REPORT.
Information Architecture WG: Report of the Spring 2004 Meeting May 13, 2004 Dan Crichton, NASA/JPL.
Cesg-1 22 October 2008 Bob Durst (AD) Dai Stanton (DAD) SPACE INTERNETWORKING SERVICES (SIS) AREA.
1 CCSDS 2007 Fall Meeting SOIS Plenary Chris Taylor Estec (27/09/2007.
1 19 September 2005 Space Link Services Area report to CMC Reston, Virginia, USA, 26 September 2005.
Delta-DOR WG: Report of the Spring 2010 Meeting Portsmouth, VA, USA May 7 th, 2010 Roberto Maddè ESA/ESOC,
Ty - 1 Space Communication Cross Support Architecture WG Closing Plenary Report Spring 2011 Meeting Takahiro Yamada (JAXA/ISAS) 20 May May 2011.
Apr12-cesg-1 Chris Taylor (AD) Stuart Fowell (DAD) SPACECRAFT ONBOARD INTERFACES SERVICES (SOIS) AREA.
Apr12-cesg-1 Chris Taylor (AD) Stuart Fowell (DAD) SPACECRAFT ONBOARD INTERFACES SERVICES (SOIS) AREA.
1 24 January 2007 SIS Report to CESG/CMC 24 January 2007 R. Durst, D. Stanton.
Apr SLS-SLP WG Goal: Progress TM, AOS Space Data Link Protocol Pink Sheets to Blue (OID frame)* Hold due to FSH/Insert Zone/Security discussion.
Security WG: Report of the Spring 2012 Meeting European Space Operations Centre Darmstadt, Germany 19 April, 2012 Howard Weiss NASA/JPL/SPARTA
Cesg-1 28 April October 2008 Bob Durst (AD) Dai Stanton (DAD) SPACE INTERNETWORKING SERVICES (SIS) AREA.
SOIS Application Support Service WG and SOIS Plug-and-Play BoF Spring 2008 Report.
Information Architecture BOF: Report of the Fall 2003 Meeting October 28, 2003 Dan Crichton, NASA/JPL.
May SPACE LINK AREA MID-TERM REPORT SUMMARY TECHNICAL STATUS 1.DATA COMPRESSION WG Goal : specify an image compression algorithm fulfilling identified.
Security WG: Report of the Fall 2004 Meeting November 19, 2004 Howard Weiss.
1 CCSDS Security Working Group Fall 2011 Meeting 1-2 November 2011 University of Colorado Boulder, Colorado USA Howard Weiss NASA/JPL.
01-05 October 2007 Heppenheim, Germany eb - 1 SMWG Closing Plenary Report Fall 2007 Meeting Erik Barkley 5 October 2007.
1 Space Communications Cross Support Architecture WG: Charter and Work Plan April, 2009 Colorado Springs, CO, USA Takahiro Yamada, JAXA/ISAS.
13-17 October 2008 Berlin, Germany ty - 1 Cross Support Architecture WG Closing Plenary Report Fall 2008 Meeting Takahiro Yamada (JAXA/ISAS) 17 October.
1 20 April 2009 Cross Support Service Area Cross Support Service Area Opening Plenary Colorado Springs, Colorado, USA 20 April 2009 Erik Barkley (AD) /
Apr SLS-SLP WG Goal: Progress TM, AOS Space Data Link Protocol Pink Sheets to Blue (OID frame)* Hold due to FSH/Insert Zone/Security discussion.
Security WG: Report of the Spring 2013 Meeting Bordeaux, France 18 April, 2013 Howard Weiss NASA/JPL/PARSONS skype:
10-Dec-2012-cesg-1 IOAG-17d telecon 19th Nov 2013 CCSDS Engineering Steering Group (CESG) Report to the IOAG.
19-May-2015-cesg-1 CESG Spring 2015: Project Schedule & Resources.
Wireless WG Monthly Teleconference
The CCSDS Security WG is chartered to:
CCSDS SOIS Wireless WG Monthly Webcon: 04-Aug-2015
Security WG: Status Briefing
Colorado Springs, CO, USA, 24 April 2009 Deputy – David Giaretta
JAXA CCSDS Secretary Office
SOIS Application Support Services WG – Fall 2009 Meeting
[Area Name] Area Report [Name] (Area Chair) [Name] (Area Deputy Chair)
CCSDS Systems Engineering Area: Security Working Group
SPACECRAFT ONBOARD INTERFACES SERVICES
Security WG: Report of the Spring 2016 Meeting
Space Communication Cross Support Architecture WG
Systems Architecture WG: Charter and Work Plan
Cross Support Architecture WG: Charter and Work Plan
SOIS-APP Working Group Report Jonathan Wilmot (WG Chair)
CCSDS Navigation Working Group
Recommended CCSDS actions in response to IOAG-11
Wireless WG Monthly Teleconference
Security WG: Report of the Fall 2013 Meeting
SLS AREA REPORT November 2004 November 2004.
Delta-DOR WG: Report of the Fall 2010 Meeting
Joint IPR/DAI Workshop
Atlanta, Georgia, USA, 16 September 2005
SPACECRAFT ONBOARD INTERFACES SERVICES
SPACECRAFT ONBOARD INTERFACES SERVICES
CCSDS Navigation Working Group
CCSDS P1J FINAL REPORT Spring Meeting, ESA/ESTEC, Netherlands Dates: April 1-4, 2003 Felipe Flores-Amaya NASA/GSFC/Code 450/Code 572 April 2003.
SPACE LINK AREA MID-TERM REPORT
JAXA CCSDS Secretary Office
Presentation transcript:

SPACE INTERNETWORKING SERVICES (SIS) AREA Bob Durst (AD) Dai Stanton (DAD) 28 April 2009 22 October 2008 1 1

CURRENT GROUPS WITHIN AREA SIS REPORT CURRENT GROUPS WITHIN AREA Space Packet Protocol Working Group Asynchronous Message Service Working Group IP Over CCSDS Working Group Motion Imagery and Applications Working Group Delay Tolerant Networking Working Group Voice Working Group 28 April 2009 22 October 2008 2 2

UPDATE SIS REPORT B. ATTENDANCE METRICS IPO WG AMS WG Voice WG DTN WG MIA WG Plenary Secretariat 1    1 BNSC 3 CNES 2 CSA DLR ESA 4 FSA JAXA USA 8 7 5 14 18 Total 12 11 22 25 Meeting Duration 1 day 2.5 days Agency Diversity UPDATE *x/y x = registered; y = attended. 22 October 2008 28 April 2009 3 3

SUMMARY TECHNICAL STATUS SIS REPORT SUMMARY TECHNICAL STATUS Space Packet Protocol WG Goals: Did not meet Working Group Status: Green Book awaiting disposition of NASA comments Pink Sheets past agency review. Resolution to publish from SLS Working Group Summary Situation: Will move to dissolve when when Pink Sheets incorporated and Green Book published. status: OK CAUTION PROBLEM comment: Completion expected this cycle 28 April 2009 22 October 2008 4 4

SIS REPORT Asynchronous Message Service WG Goals: In joint meeting with SOIS, resolve any residual AMS/MTS alignment issues Discuss interoperability testing plan and findings Resolve any residual specification issues Working Group Status: AMS/MTS alignment satisfactory; two additional conformance classes requested (minimal and sub-minimal sets) Interoperability testing completed, judged satisfactory by WG participants; test report to be updated with additional explanatory notes (APL, Goddard, JPL, Marshall) All remaining specification issues (emerged in implementation) resolved by consensus Working Group Summary Situation: status: OK CAUTION PROBLEM comment: On schedule. 28 April 2009 22 October 2008 5 5

AMS WG Findings The AMS WG reiterates its recommendation that, funding permitting, ESA/SciSys – JHU/APL interoperability testing over SOIS packet service begin as soon as feasible. Completion of this testing is not a precondition to formal standardization of AMS, as interoperation between independently developed implementations has already been successfully demonstrated, but it is highly desirable. Action on ESA to confirm resources. The WG agrees to divide the Basic Message Exchange capability set into two sets – send/receive, query/reply – and add two bare- minimum conformance classes: send/receive only, with and without MAMS. This will fully align AMS with the current MTS service definition. The WG agrees that development of the AMS specification is complete. Upon completion of some copy editing and the addition of new conformance classes as noted above, the AMS Red Book will be ready for final Agency review and poll. The WG asks the Area Director to issue a resolution to this effect at his convenience. 28 April 2009 6

SIS REPORT IP Over CCSDS WG Goals: Develop a CCSDS recommended best practice document for how to transfer IP datagrams over the 4 CCSDS link layer protocols. New – Develop IP in Space Internetworking Magenta and Green books Working Group Status: IP over CCSDS Red-3 completed Agency Review NASA-RID on IP over ENCAP to be resolved in SLS-SLP meeting Fri PM IP over CCSDS on hold until SLS-SLP depreciates IPv4 in link layer documents and interoperability testing between NASA/JPL and GSFC done. Expect this task to be completed by Fall 09 meeting. New task: IP in Space Internetworking Magenta and Green Books (resolution by CESG meeting) Working Group Summary Situation: status: OK CAUTION PROBLEM comment: Good 28 April 2009 22 October 2008 7 7

SIS AREA REPORT Goals: Motion Imagery and Applications WG Review and edit draft Green book text Plan Fall 09 meeting planning for beginning work on Magenta Book WG Status: Active WG Summary Situation: Excellent active participation, consensus on current and future direction WG Summary progress: Successfully testing HDTV MPEG-4 link between HOSC and Col-CC Could be beginning of test bed work for the future Reviewed current draft Green Book content and reviewed new content provided by International partners Agreed on general direction toward development of Magenta Book On schedule for completion of Green Book status: OK CAUTION PROBLEM comment: 03/06/2018

SIS AREA REPORT MIA WG (cnt’d) Planning : Working on merging content from partners into single CCSDS Green Book format Planning on coordinating with selected CCSDS groups to hold joint “education” meetings during Fall CCSDS meetings as a starting point for Magenta Book development Beginning to think about proto-typing in late 2010/2011 time frame 03/06/2018

Probable 6 month schedule slip to Blue Books (Fall 2010) SIS REPORT Delay Tolerant Networking WG Goals: Review and finalize draft Green Book. Start development of DTN protocol specifications Discuss additional WG documents and way forward Working Group Status: Met jointly with representatives from SOIS and identified areas of interface between DTN and SOIS onboard services. Virtual Reviewed draft Green Book, identified some new material on resource management; expect submission to CESG within 2 months Achieved agreement on RFC5050 and RFC5326 as base DTN protocols and goals of maintaining CCSDS interoperability with terrestrial versions Planned next steps for protocol spec development – WG to generate white books by July; modify schedule for Blue Book finalization to Fall of 2010 Note to CESG: WG may submit a charter modification to generate a detailed architecture Green Book (target completion date +1year) Working Group Summary Situation: status: OK CAUTION PROBLEM comment: Probable 6 month schedule slip to Blue Books (Fall 2010) 28 April 2009 10 10

SIS REPORT Voice WG Goals: Out of cycle meeting to accommodate meeting schedules and constraints Develop Green Book second draft Incorporate international contributions Working Group Status: Green Book second draft completed and distributed as scheduled Further actions assigned for additional Green Book content Team is reviewing second draft Working Group Summary Situation: status: OK CAUTION PROBLEM comment: On Schedule. 28 April 2009 22 October 2008 11 11

Cross Area Meetings for Spring ‘09 SIS-SOIS: Identified areas of interface between DTN and SOIS onboard services. ‘Soft’ recommendation for SOIS to consider standardized ‘transponder access’ service (device virtualization of communication resources) that could be accessed by DTN. SIS-SOIS: Resolved the only residual AMS/MTS alignment issue, the need to identify an even-more-minimal capability set as the basis for two new minimal conformance classes: send/receive only, with and without MAMS. Recommended that interoperability testing between the ESA/SciSys and JHU/APL implementations of AMS, over SOIS packet service, should begin as soon as feasible. 28 April 2009 22 October 2008 12

Forthcoming Resolutions from SIS to CESG Close moribund working groups. SPP Pink Sheet incorporation and Blue Book upissue. SPP Green Book publication. AMS Red Book to go for final Agency review and poll. Followed, in this cycle for resolution for AMS Blue and Green Book publication and WG shutdown. DTN GB for CESG review followed by agency review. 28 April 2009 22 October 2008 13

D. SUMMARY: MAJOR ACCOMPLISHMENTS, S’09 MEETING AMS nearing completion SIS REPORT D. SUMMARY: MAJOR ACCOMPLISHMENTS, S’09 MEETING AMS nearing completion DTN now has active multi-agency participation. Rationale Green Book nearing completions and scope of blue books agreed Voice/video? 28 April 2009 22 October 2008 14 14