Mark 5 / VLBA Correlator Topics

Slides:



Advertisements
Similar presentations
Mark 5C VLBI Data System Alan Whitney MIT Haystack Observatory 16 June 2008 e-VLBI workshop Shanghai, China.
Advertisements

Prototype SKA Technologies at Molonglo: 3. Beamformer and Correlator J.D. Bunton Telecommunications and Industrial Physics, CSIRO. Australia. Correlator.
DBBC3 Development - Digital Base-Band Converter 3
Atacama Large Millimeter/submillimeter Array Expanded Very Large Array Robert C. Byrd Green Bank Telescope Very Long Baseline Array Digital Signal Processing.
Atacama Large Millimeter/submillimeter Array Expanded Very Large Array Robert C. Byrd Green Bank Telescope Very Long Baseline Array Spectrometer PDR John.
Current LBA Developments Chris Phillips CSIRO ATNF 13/7/2005.
C. ChandlerEVLA Advisory Committee Meeting September 6-7, Scientific Commissioning Plan Claire Chandler.
Highly Scalable Packetised correlators Jason Manley CASPER workshop 2009.
Backend electronics for radioastronomy G. Comoretto.
DBBC Stutus Report November 2007 G. Tuccari, W. Alef, S. Buttaccio, G. Nicotra, M. Wunderlich.
EVLA Early Science: Shared Risk Observing EVLA Advisory Committee Meeting, March 19-20, 2009 Claire Chandler Deputy AD for Science, NM Ops.
Systems Integration and Testing EVLA Advisory Committee Meeting, March 19-20, 2009 Jim Jackson Systems Engineer.
A Low-Cost Phase Cal Monitor and RFI Spectrum Analyzer for VLBI2010 Mark-5 / Mark-6 using Cheap,COTS Software Defined Radio (SDR) Hardware & Software Gleaned.
DLS Digital Controller Tony Dobbing Head of Power Supplies Group.
Update on LBA Technical Developments CASS Chris Phillips 11 October 2013.
Nov 29, 2006Dwingeloo, EVN CBD Meeting EVN D igital B ase B and C onverter Status Report Status Report G. Tuccari.
Atacama Large Millimeter/submillimeter Array Expanded Very Large Array Robert C. Byrd Green Bank Telescope Very Long Baseline Array The VLBA Sensitivity.
Nov 1, 2011 RN - 1 Jet Propulsion Laboratory California Institute of Technology Implementation Issues and Choices for VLBI data Acquisition System in DSN.
VLBA Sensitivity Upgrade Project Status Jon Romney NRAO, Socorro 7 th US VLBI Technical Coordination Meeting Haystack Observatory 2009 November 3–4.
Atacama Large Millimeter/submillimeter Array Expanded Very Large Array Robert C. Byrd Green Bank Telescope Very Long Baseline Array The VLBA Sensitivity.
DBBC - EVN CDR Meeting, Bologna May 2005 DBBC Project G. Tuccari, S. Buttaccio, G. Nicotra - Istituto di Radioastronomia CNR, Sezione di Noto - Italy M.
IVS-4th General Meeting, Concepción- Chile, Jan 2006 DBBC - A Flexible Platform for VLBI Data Process G. Tuccari, S. Buttaccio, G. Nicotra - Istituto di.
High Sensitivity VLBI Sheperd Doeleman MIT Haystack Observatory.
The BEST-2 SKA pathfinder is composed by 32 receivers. The front ends are installed on the focal lines of 8 cylinders, offering a collecting area of about.
Eleventh Synthesis Imaging Workshop Socorro, June 10-17, 2008 THE VLBA SENSITIVITY UPGRADE Craig Walker, NRAO.
Correlator Growth Path EVLA Advisory Committee Meeting, March 19-20, 2009 Michael P. Rupen Project Scientist for WIDAR.
JVLA capabilities to be offered for semester 2013A Claire Chandler.
Nov 3, 2009 RN - 1 Jet Propulsion Laboratory California Institute of Technology Current Developments for VLBI Data Acquisition Equipment at JPL Robert.
Casper 2010Marc Torres Part 2: Building blocks for the next generation.
Moscow presentation, Sept, 2007 L. Kogan National Radio Astronomy Observatory, Socorro, NM, USA EVLA, ALMA –the most important NRAO projects.
© ASTRON On the Fly LOFAR Station Correlator André W. Gunst.
CASPER Packetised correlators Jason Manley CASPER workshop 2009.
Jason Manley, Aaron Parsons, Don Backer, Henry Chen, Terry Filiba, David MacMahon, Peter McMahon, Arash Parsa, Andrew Siemion, Dan Werthimer, Mel Wright.
Atacama Large Millimeter/submillimeter Array Expanded Very Large Array Robert C. Byrd Green Bank Telescope Very Long Baseline Array VLBA Operational Status.
Brent CarlsonEVLA System PDR (Correlator V2) December 4-5, Correlator.
18-19 July, 2002Correlator Backend System OverviewTom Morgan 1 Correlator Backend System Overview Tom Morgan, NRAO.
VLBA Implementation of the ROACH Digital Backend Jonathan Romney on behalf of the VLBA Upgrade development team NRAO / Socorro First International VLBI.
DBBC Status Report 1) Summary of firmware development and results of tests and Haystack comparison 2) Status of FiLa 10 GE board (needed for Mark 5C and.
03/6/121 Using the VLBA for Spacecraft Navigation Jonathan Romney National Radio Astronomy Observatory VLBA 10 th Anniversary 2003 June 9 – 12.
The Green Bank Telescope Frank Ghigo, National Radio Astronomy Observatory 7 th US VLBI Technical Meeting, Haystack, Nov 2009.
April 8/9, 2003 Green Bank GBT PTCS Conceptual Design Review John Ford September 28, 2009 Casper Instrumentation at Green Bank The NRAO is operated for.
M.P. RupenCorrelator Connectivity Scheme Review 31 July Correlator Specifications Michael P. Rupen.
DDRIII BASED GENERAL PURPOSE FIFO ON VIRTEX-6 FPGA ML605 BOARD PART B PRESENTATION STUDENTS: OLEG KORENEV EUGENE REZNIK SUPERVISOR: ROLF HILGENDORF 1 Semester:
High Speed Digitizers EVLA Advisory Committee Meeting March 19-20, 2009 Steven Durand & Mike Revnell.
Broadband Interfacing eMerlin-JIVE (1-10Gbps) Onsala-Jodrell Bank (
A Wide-Band VLBI Digital Backend System Alan Whitney Shep Doeleman Brian Fanous Hans Hinteregger Alan Rogers MIT Haystack Observatory 10 Jan 2006 IVS General.
SAGE meeting Socorro, May 22-23, 2007 WIDAR Correlator Overview Michael P. Rupen Project Scientist for WIDAR & Software.
FP7 Uniboard project Digital Receiver G. Comoretto, A. Russo, G. Tuccari, A Baudry, P. Camino, B. Quertier Dwingeloo, February 27, 2009.
WIDAR Correlator Options and Potential Craig Walker NRAO Socorro U.S. VLBI Technical Coordination Meeting May 14-15, 2007.
2007 / 5 / 141 VLBA Requirements, Plans & Status Jon Romney NRAO, Socorro Second US VLBI Technical Coordination Meeting Socorro 2007 / 5 / 14.
Future LBO Developments
Digital Down Converter (DDC)
Concepts for a Next-Generation VLBA
EVLA Availability - or - When Can I Use It?
VLA/VLBA INTEGRATION With appropriate outfitting, the VLA+NMA+VLBA could be one integrated instrument covering all resolutions from arcminutes to well.
JIVE UniBoard Correlator (JUC) Firmware
J D Romney, W F Brisken, S J Durand
EVLA Correlator New Connectivity Scheme Software Impact Sonja Vrcic
EVLA System PDR System Overview
Rick Perley National Radio Astronomy Observatory
Shared Risk Observing Claire Chandler EVLA SSS Review, June 5, 2009
VLBA Correlator Interfaces for VSOP-2
Shared Risk Science with the EVLA
UNIBOARD : VLBI APPLICATION CHARACTERIZATION
Progress on EXPreS at JBO Ralph Spencer
Project of Direct Sampling Digital Backend for Quasar VLBI-network
Correlator Growth Path
EVLA Construction Status
EVLA Advisory Panel Mtg. System Overview
DBBC Stutus Report November 2007
Presentation transcript:

Mark 5 / VLBA Correlator Topics 2006/2/23 VLBA 4-Gbps Upgrade Jon Romney NRAO, Socorro EVN DBBC CDR Bologna 2007 / 4 / 24 2007 / 4 / 24 J. D. Romney

VLBA 4-Gbps Upgrade Overview Replace All Equipment Downstream from IFs Wideband Sampler/Filter module. 2x 500-MHz inputs; 4-Gbps output. Replacing BBCs / Samplers / Formatter. Further details to follow. Wideband Recording system. Disk-based; 4-Gbps capacity; “Mark 5C”. Compatible with existing Mark 5 module pool. Wideband Correlator. Stand-alone mini-WIDAR – OR – software/cluster system. Wider bandwidth / higher spectral resolution / more flexible. 2007 / 4 / 24 – jdr EVN DBBC CDR

VLBA 4-Gbps Upgrade Funding & Schedule Funding Status Wideband Sampler/Filter module. Design development funded. Implementation funding requested*. Wideband Recording system. Design funding requested*. Wideband Correlator. Software correlator completion funded. Implementation funding requested* for intermediate cluster. * funds requested from GBT track warranty arbitration payment. Target Completion Date … for all 3 prototypes: 2007 / 12 / 31. 2007 / 4 / 24 – jdr EVN DBBC CDR

Wideband Sampler/Filter Basic VLBA Requirements IF Input Minimal: 2 x 500 MHz. Optional: 4 x 500 MHz for dual-band dual-polar (etc.) modes. Sampling Sample clock: 1024 MHz. Sample precision: 8 bits. Filtering: Two Selectable Modes Polyphase filter bank, spanning contiguous 500-MHz band. Tunable “digital BBC” filters: 8 (possibly 16). Bandwidths 62.5 kHz – 256 MHz / tunable to 1% of bandwidth. Output truncation: 1 – 8 bits/sample. 2007 / 4 / 24 – jdr EVN DBBC CDR

Wideband Sampler/Filter Concept History Original Exploit experience developed at NRAO from EVLA project. Adapt relevant portions of EVLA data transmission system & correlator designs. Haystack Collaboration Similarities to Haystack DBE recognized. Joint development of “DBE-2” selected as excellent opportunity for collaboration. … at first NRAO/Haystack Technical Meeting, 2006 / 10 / 25 – 26. 2007 / 4 / 24 – jdr EVN DBBC CDR

Wideband Sampler/Filter VLBA Concept History [2] Modification for VLBI-2010 Requirements Doubled input bandwidths to total 4 x 1 GHz. Doubled sampler clock to 2048 MHz. Added 10G Ethernet output, channel-packetized. Required largest Xilinx Virtex 5 chip & corner-turner memories. Required 2-board configuration for full capability. 2007 / 4 / 24 – jdr EVN DBBC CDR

Most Recent NRAO-Haystack “DBE-2” Block Diagram 2007 / 4 / 24 – jdr EVN DBBC CDR

Wideband Sampler/Filter VLBA Concept History [3] Impact of iBob-2 Discovered Casper group’s iBob-2 development recently. Recognized similarities to most recent NRAO-Haystack board. Development timescale a concern at NRAO. Had hoped to complete prototype board by 2007 / 9 / 30. Resolution currently not clear. 2007 / 4 / 24 – jdr EVN DBBC CDR

Compatibility & Collaboration Considerations Compatibility among DBBC/DBE Devices NOT nearly as critical as recording systems. No media to be interchanged. But identical filter profiles important for optimal baseline closure. Possible global agreement on filter characteristics. Would require all devices to support same minimum number of taps. Collaboration on Common Elements Possible sharing of FPGA code for filters. Would require all devices to use compatible FPGAs. 2007 / 4 / 24 – jdr EVN DBBC CDR

Thank you 2007 / 4 / 24 – jdr EVN DBBC CDR