Oil and Gas Sidney Manning Chief Administrator/Inspector

Slides:



Advertisements
Similar presentations
COMPANY MAINTENANCE MANUAL
Advertisements

Underground Storage Tanks at Duke Duke Medical Center –8 permitted USTs located on medical campus –Range in size from 2,000 gallons to 30,000 gallons Proper.
BUILDING ENERGY CODES UNIVERSITYwww.energycodes.gov/BECU 1 BUILDING ENERGY CODES UNIVERSITY ANSI/ASHRAE/IES Standard Scope and Application April.
Fired And Unfired Pressure Vessels
First Class Power Engineer Industrial Mechanic
International Mechanical Codes Scald Protection. – Where a combination potable water-heating and space-heating system requires water for space.
Compressed Gases Slide Show Notes
Nationally Recognized Testing Laboratories
Railroad Commission of Texas Statewide Rule 32 and Flaring/Venting of Produced Gas Travis Baer, District 01 Engineering Specialist August 2014.
Student Book © 2004 Propane Education & Research CouncilPage Placing Appliances into Initial Operation Knowing the proper techniques and.
Sidney Manning Chief Administrator/Inspector Plumbing & Gas
Energy Efficiency Engineering Ltd. Jozef Jachniak, P.Eng. GAS FIRED EQUIPMENT FIELD APPROVALS PART2.
YOU ALWAYS GET WHAT YOU ALWAYS GOT. Roles and Responsibilities Arden Delisle Chief Inspector Al-Pac March 24 th 2014.
2012 Plumbing Codes International Plumbing Code Uniform Plumbing Code David McCarthy, P.E. City of Phoenix.
Compressed Gases. Stories of Compressed Gases Employee killed when cylinder turned into a rocket because its valve was knocked off Employee suffocated.
Statutes & Regulations State Board of Master Plumbers Continuing Education License renewal 2007.
ASME Nuclear Conformity Assessment
Hydrogen Workshop for Fleet Operators. Module 3, “Vehicle Operations and Maintenance Facilities”
Gas Transmission Pipelines
LOCKOUT/TAGOUT.
2012 International Fire Code Adopted as the minimum fire safety standard by the State of Wyoming City of Sheridan must adopt the minimum standard to retain.
CNG STATION & GARAGE MODIFICATION CODES & STANDARDS Graham Barker Business Development Manager.
Ontario Building Code Revision effective Jan 1, 2015
Liquefied Petroleum Gases. Hazards of LP gas v Flammable v Asphyxiant 1a.
HVACR311 – Electrical for Refrigeration International Mechanical Code Relating to Refrigeration.
Codes, Standards & Conformity Assessment GP Russ Chaney CEO, The IAPMO Group
2.5.3 Student Book © 2004 Propane Education & Research CouncilPage Verifying Proper ASME Tank Condition Prior to Loading For the safe and efficient.
Michigan’s Hydrogen Rules Department of Environmental Quality.
Process Safety Incidents- Discussion of Hub Oil 1999 Accident
NFPA 31 Standard for the installation of Oil- Burning Equipment
4.2.8 Student Book © 2004 Propane Education & Research CouncilPage Installing Aboveground ASME Tanks Installing aboveground tanks is an important.
1 1 OPW EMEA CLEAN ENERGY PRODUCT LINE. 2 OPW EMEA – CLEAN ENERGY PRODUCT LINE Eduardo De Angelis OPW EMEA – Western Europe Sales Manager.
Air Conditioning International Mechanical Code
AIFPA March 2011 Safety Codes Act and Alberta Fire Code Responsibilities.
Placing Vapor Distribution Systems and Appliances into Operation MODULE 1 Course Introduction.
5.1.9 Student Book © 2005 Propane Education & Research CouncilPage Installing Propane Dispensers Successful propane dispenser installations are.
Standards: Paving the way for innovation Glenn Tubrett Program Manager, Energy and Utilities Canadian Standards Association.
MODULE 6 Vehicle Parking, Servicing, and Security.
1 HVACR318 – Refrigeration II International Mechanical Code Relating to Refrigeration.
Workshop on the Implementation of the Pressure Equipment Directive In-Service Inspection Overview of UK Legislation Martin Yates Safety Assessment Federation.
Accident Prevention Manual for Business & Industry: Engineering & Technology 13th edition National Safety Council Compiled by Dr. S.D. Allen Iske, Associate.
3.1.8 Student Book © 2004 Propane Education & Research CouncilPage Identifying Procedures for Conducting Container Vapor Flaring Operations Before.
Cost effective while providing customer focused solutions.
Hot Work Permit Osan AB Fire Emergency Services.
Steve Griffith February 28th, 2017
Fire Protection Systems Chapter 9 IBC 9th Edition Amendments
How to have a successful Field Inspection / Approval
Alberta Development Officers Association
Infrastructure & Safety
CIHQ - All Rights Reserved 2017
Information to the Customer
THE IECEx SCHEME IN CANADA Canadian Regulations and Access to the Market Presented by : Dave Adams, Technical Advisor, CSA International Welcome to the.
Subsea 100 Global Services Products Presentation
Flammable and Combustible Liquids
Module 6: Confirming Compliance
In-Direct Steam Heat in Light Oil Process Applications
East Carolina University Compressed Gas Safety Training Program
Emergency Electrical Power Supply for Buildings
General Requirements of NFPA 101
The Cannabis Industry and the Fire Code
Understanding Construction Codes
Control of Hazardous Energy
Workshop on the Implementation of the Pressure Equipment Directive In-Service Inspection Overview of UK Legislation Martin Yates Safety Assessment Federation.
Council Orientation October 24, 2017
American Petroleum Institute Certification Programs
ABC Company ABC Chemical Complex Engineering Specification
CSA Medical gas Standard
Gas Transmission Pipelines
Presentation transcript:

Oil and Gas Sidney Manning Chief Administrator/Inspector 3-Jun-18 Oil and Gas Sidney Manning Chief Administrator/Inspector Plumbing and Gas March 7, 2012

Topics Legislation / SCA Standata & Variances New Codes Concerns 3-Jun-18 Topics Legislation / SCA Standata & Variances New Codes CSA-B149’s 2010 NPC 2010 Concerns This presentation will discuss; Authority Having Jurisdiction and those “Accredited” to administer the Safety Codes Act and governing regulations, The more relevant changes to the B149 Natural Gas and Propane Installation, Storage and Handling Codes, Recent Standata’s, other concerns and issues.

Act & Regulations Safety Codes Act (Chapter S-1) 3-Jun-18 Act & Regulations Safety Codes Act (Chapter S-1) Gas Code Regulation (AR111/2010) adopts CSA gas codes & contains Alta amendments Plumbing Code Regulation (AR119/2007) - adopts NPC & contains Alta amendments; Permit Regulation (AR204/2007) Administration Items Regulation (AR16/2004) SCO may accept variance/ alternate solutions. Queens printer

3-Jun-18 Act & Regulations The Safety Codes Act & Regulations can be purchased from the Queen's Printer on-line at http://www.qp.gov.ab.ca/index.cfm Anyone with a code book that is bound should ask his neighbor how long the Plmb/gas code books have been in binders.

Authority having jurisdiction 3-Jun-18 Authority having jurisdiction 360 Number of Municipalities in Alberta Accredited Municipalities by discipline Building Electrical Fire Gas/Plbg 273 252 263 252 The unaccredited Municipalities fall under the jurisdiction of Municipal Affairs and permit services are provided by contracted authorized “Accredited Agencies”.

Not Acceptable - Report Unsafe Installations - AHJ 3-Jun-18 Not Acceptable - Report Unsafe Installations - AHJ Utilities, ABSA, environment, OH&S, ERCB Clause 6.2.16 - outdoor underground service only 31

New GAS Codes –2010 CAN/CSA-B149.1-2010 CAN/CSA-B149.2-2010 3-Jun-18 New GAS Codes –2010 CAN/CSA-B149.1-2010 CAN/CSA-B149.2-2010 CAN/CSA-B149.3-2010 (by reference) CAN/CSA-B149.5-2010 CSA publications available January 4, 2010 Adopted September 1, 2010 Additional codes adopted in Alberta B108-99 Natural Gas for Vehicle Installation Code B109-01 NGV Refueling Stations Installation Code ABC, alignment with ABC, Canadian electrical codes, clearance applications between natural gas or propane. 5.2.3.10 line pressure reg, refrigerators require vent, Fire, elevating, and boiler

Applicable Legislation 3-Jun-18 Applicable Legislation Does not contain any exemptions from the requirements for any structure based on its occupancy, industrial application or specific industry where “gas” is to be used for fuel purposes. All Pressures B149.1-05

The B149.1 - 2010 Definitions - “gas” 3-Jun-18 The B149.1 - 2010 Definitions - “gas” natural gas, manufactured gas, or mixtures of propane gas and air, methane, propane, propylene, butanes (normal butane or isobutane), and butylenes. (Hydrogen, digester gas and carbon monoxide) “container” means a tank or cylinder used to store or transport gas Odorization…..

Applicable Legislation 3-Jun-18 Applicable Legislation On a plant site as defined by Alberta Boilers Safety Association (ABSA) process pressure piping in excess of 15 psi falls under their jurisdiction. ABSA’s Web Site: www.albertaboilers.com Exempt fuel, ERCB and Flame arrestors

3-Jun-18 New Gas Code – CSA-B149.1 2010 1. Scope 1.2 This Code does not apply to (b) gas where used as a feedstock in petroleum refineries or chemical plants; 2005 –(b) petroleum refineries…….

3-Jun-18 Tank Heater

Gas Code Regulation Gas Systems Equipment 3-Jun-18 Gas Code Regulation Gas Systems Equipment 3(1) No person may manufacture, install, sell or offer for sale any equipment related to gas systems for use in Alberta unless it has been:

Gas Code Regulation Gas Systems Equipment 3-Jun-18 Gas Code Regulation Gas Systems Equipment 3(1)(a) tested and certified by a certification body accredited by the Standards Council of Canada, or

Gas Code Regulation Gas Systems Equipment 3-Jun-18 Gas Code Regulation Gas Systems Equipment 3(1) (b) inspected and accepted by a certification body accredited by the Standards Council of Canada, and the equipment bears evidence of having been accepted in the manner authorized by the certification body. (See Standata #G-02-01a-IB)

CAN/CSA-B149.3 Requirements for Approval Uncertified equipment and components require approval Uncertified equipment and components are to meet the requirements of the B149.3 Code for the Field Approval of Fuel-Related Components on Appliances and Equipment

Third Option – Variance 3-Jun-18 Third Option – Variance VAR-GAS-05-05 [Rev3] This variance applies to gas-fired equipment used for process applications in petroleum refineries, petrochemical plants and upstream oil and gas sites only. This Variance was issued to offer a third option to Section 3(1) of the Gas Code Regulation that would permit the oil and gas industry to make use of gas-fired process equipment constructed to engineered designs, signed, sealed/stamped and dated by a Professional Engineer. In which case, the field approval by a third party such as a certification body accredited by the Standards Council of Canada would not be required.

Third Option – Variance 3-Jun-18 Third Option – Variance requires designs, signed, sealed/stamped and dated by a Professional Engineer, for gas-fired equipment that is used for process applications only. Covers new installations and upgrading, altering, or relocation of existing systems. Field approval / direct supervision / gasfitters

Third Option – Variance 3-Jun-18 Third Option – Variance The designs shall meet the intent of existing gas “Codes” and all components shall comply with the applicable standards or accepted test reports. Fuel gas piping CSA B149.1, CSA B51, ASME B31 or B31.3 and underground fuel gas piping CSA Z662 Valve trains CSA B149.3, NFPA 86 or equivalent Components listed by a Canadian Certification body ANSI, ASME,FM or API and rated for the application CSA-Z662 - Oil and Gas Pipeline Systems This Code applies to the design, construction, operation, and maintenance of oil and gas industry pipelines.

CAN/CSA-B149.3 Requirements for Approval 3-Jun-18 CAN/CSA-B149.3 Requirements for Approval Changes to an installation are to be brought up to current codes. Any gas-fired equipment that is being shut down for major repairs, upgrading or being rebuilt, or is being relocated requires an upgrade Routine service and maintenance does not require an upgrade Alterations extensions and additions B149.3 site specific…

CAN/CSA-B149.3 Gas Installation work is to be performed by a licensed gasfitter or under the supervision of a licensed gas fitter. New installations and replacements are to be installed to current codes. engineering or third party approvals are required at; battery treater sites steam generator sites refineries; and all other sites where gas is utilized (burned as a fuel), including propane, natural and wellhead (casing) gas Petroleum refineries or Chemical plants

CAN/CSA-B149.3 regulatory implications 3-Jun-18 CAN/CSA-B149.3 regulatory implications Existing equipment and installations prior to January 1, 2015 require an upgrade to current codes through a self initiated audit. An exception ! Installations considered hazardous in their current form. These would have to be brought up to current code. Is the industry moving in a fully compliant direction?

Standards Council of Canada New inspection body program for certification of testing Agencies that may complete: third party inspections, field approvals and Labeling of B149,3 applications. http://www.scc.ca/en/edocs/criteria-and-procedures/ib-accreditation

Adjacent Building - Explosion/Fire 3-Jun-18 Adjacent Building - Explosion/Fire 70 psi Regulator not vented to the exterior. The pressure upstream of this is 70 PSI No regulator vent - ? no relief device 34

Wellhead Gas - (1) Pressure ? 3-Jun-18 Wellhead Gas - (1) Pressure ? 26

Wellhead Gas - (2) Materials ? 3-Jun-18 Wellhead Gas - (2) Materials ? 27

Swing Joint !!! Underground Piping?? 3-Jun-18 Swing Joint !!! Underground Piping?? 28

Installation Problems - ? Materials 3-Jun-18 Installation Problems - ? Materials 35

Installation Problems - Hoses 3-Jun-18 Installation Problems - Hoses 36

3-Jun-18 Tank Heater

3-Jun-18 LPG System

Exhausted tank ! 1000 gallon tank. (rondo pet) tank was being heated with exhaust from generator. No vaporizer. Is an engine direct fired? I used 9.1.2 b149.2 to tell them to smarten up. Pressure relief was going off every 6 to 12 minutes.

3-Jun-18 LPG – Hoses ?

3-Jun-18 Operator Injury

3-Jun-18 Prevention

3-Jun-18 PEX Pipe – LP gas line ? XXX

Questions / Conclusion 3-Jun-18 Questions / Conclusion THANK YOU The End