Plan for the installation of the TAMU screen

Slides:



Advertisements
Similar presentations
Unit 5 Steel Frame Construction
Advertisements

Health and Safety Executive Health and Safety Executive Dropped Objects Update September 2013 Donald Dobson Health & Safety Executive Offshore Division.
Heavy Concrete Construction Formwork
With the passage of the May 2009 NLISD Bond Election, campuses made improvements and repairs. New flooring in the elementary schools, updated kitchen.
Tools MVRT Season. Overview Design –Combination Square –Caliper Fabrication –Hacksaw –File –Drill –Sandpaper/Steel Wool –Shears Assembly –Allen.
A-dec 300 Dual Mount on 500 Installation. Agenda ► General Information ► Recommended tools ► Installation ► Follow through install guide ► Hands-on install.
Advanced Construction Technology By Professor Chris Gorse & Ian Dickinson – licensed under the Creative Commons Attribution – Non- Commercial – Share Alike.
Manual for Appliances, Tools, and Materials in the New Millennium Hall Auditorium.
Hand tools. Standard Head Screw Driver Used to tighten or loosen flat head screws.
CMS ZDC Crane Emergency Payload Removal Procedures This document proposes the viability of using a portable hydraulic actuator Hand crane (Davit crane)
Module 3: Marking out and Hand Tools
Reduced Bearing. Main Menu 1. Direction 2. Compass Points 3. Reduced Bearing.
TCC2-TDC2 working group Handling means for the TAX repairs JL GRENARD EN-HE 21th September 2011.
Today’s (12.7) Report LIU Qian. East EC is ready, we are going to install the EC TOF next Monday.
Selected Problems from Chapter o.
Rectangular framed structures
Don Lynch 9/15/05 HBD Safety Review 1 Mechanical Design And Installation Hadron Blind Detector (HBD) Don Lynch.
Theatre Safety and Tools
Electrical stations, switch rooms and server rooms
Mounting guide of G40 Camera VIDO Electronic Vertriebs GmbH.
RICE-II Engineering & Deployment Kenneth Ratzlaff, John Ledford Instrumentation Design Lab The University of Kansas.
Support and alignment of PXL box with MSC, operation steps
Percussion drilling By Batch -2. Percussion drilling Cable Tool Drilling Percussion drills have been used to drill thousands of feet, though they are.
Materials Lists Preparing to Build. Materials List  Complete list of all supplies needed to complete the project  Must be detailed  Dimensions of materials.
Statistics U.S. Department of Labor – Bureau of Labor Statistics Statistics.
Notes After TIG 17/7/08 HF+ Move out of garage: Aug 15* Platform+table+collars+racks+BP support (jack up for platform) = 3 days Controls for motors = 1.
Floor Jacks and Stands Harkness Career Center. Floor Jacks Parts Identification.
READING QUIZ A wedge is a __________. A) truss B) frame C) machine D) beam.
Velocity and Displacement Page 91. Velocity The rate of change of the position of an object. Tells us how fast an object is going AND in what direction.
Update on Module Mounting on Staves and Stavelets 25/8/11 1.
6.03 Tools in Agricultural Engineering Obj. 6.03: Remember tools and their safety practices related to the agricultural mechanics industry Images courtesy.
Objective 6.03 Remember tools and their safety practices related to the agricultural mechanics industry.
PRY Base - Contents l PRY Support/Base/Platform in the MICE Hall l Requirements l Environment l Design l Structural Integrity l Preparation l Installation.
RICH1 Gas Enclosure Installation. Experimental Area Meeting at CERN on 21st June 2006 Bill Cameron (Imperial College London) on behalf of the RICH1 team.
Section 9.1 Applications Involving Right Triangles.
½ ” steel plates 1/8 ” Steel C channels; 3 ½” inch wide each The Laser Holder Support Frame Geophone platforms (to characterize fixture motion) Stiffening.
By. Justin white. A gear is some thing that moves and it makes some thing else move (To see a gear Look at the picture below)
Additional muon stations for the Upgrade of the Elevator Regions in the ATLAS Muon Spectrometer. Installation scenario, status on the installation tools.
Bike Powered Water Purifier Concepts: Fluid Mechanics, Water Conservation Equations: Experimental Challenges: Create and test bike powered water purifier.
PSB DUMP REPLACEMENT: STRATEGY & STATUS LIU-PSB Meeting 90 A. Sarrió, F. Loprete, A. Perillo-Marcone 22 th November 2012 LIU-PSB.
C-shaped steel beam pulley cable pulley lifting and installation work status.
RAMI Paul Aden. RAMI Analysis Reliability Visual inspection during each shutdown Service schedule for necessary components Majority of components to have.
Onsite Work Summary RIKEN/RBRC Itaru NAKAGAWA. Completed Re-capacitation St-1, Gap-1 N&S Completed St-2 Terminators Install to South Oct.5 (except for.
Construction Methodology for Suramadu Main Bridge.
JLG E450AJ boomlift - Electric, 45ft (13.7 m) platform vertical height, AJ= basket jib capabilities. - horizontal span = 7m ton weight, for handling.
Kitakami Side AHCAL Assembly or anywhere in any detector.
VIEW SERIES with Sliding Door
Session 1: Common Hand Tools
BM&N STS ladders assembly in VLHEP
Annex 4 - Moving Frame and Whiffletree assembly
Remember tools and their safety practices related to the agricultural mechanics industry. Objective 6.03.
ProtoDUNE – DSS Installation, Alignment and QA
E450AJ BOOMLIFT for DECAM Tasks
Escalator Installation
NA62 LAV Anti1 REMOVAL & TESTS
Step IV PRY Preparation - Contents
Jack and Hoist Safety.
Module 6 Antenna Assembly and Look up Angles
The Steps for Basement Renovations
INDOOR BASEBALL / SOFTBALL FACILITY
Minuteman Vocational Technical Regional High School Progress
10.2 Work 1.
BASEPLATES SLIDE SHOW.
Table of Contents Name and picture of each appliance, material, and tool How to turn on the power How to install microphones Lobby Arrangement (during.
Tool ID Week 7 Clamps and Vises.
Industrial Technology Timber Stage 5
Ag Mechanics Tools.
Clamping and Boring Tools
Bunker Wall Design Wall ESS
Robot Deployment System
Presentation transcript:

Plan for the installation of the TAMU screen

Area of work within the dome 4 meter Blanco

Equipment and tools in use Drills Cables Fiber Rope Wood Laser clamp Winches Cherry picker, electric articulated arm

Installation of the main beam This beam is located at the correct angle, using the clamp to hold it in the correct position. This is a work in height 15 m, and used the "Cherry picker" Beam clamp on three points

The beam is in the position shown in the figure but below the platform

Installation of the frame You have to lift the frame with winches to connect with the main beam. The connection of the frame with the beam in its three points using the Cherry picker. Frame While the frame connected to the beam, is to locate the position of the three arms that adjust the angle of the frame,

The frame with the screen connection The connection of the screen with the frame is on floor C, the crane is necessary to move the screen

Final connection and adjusting the screen The screen together with the frame for this operation are needed steel cables and winches. connect the three points of the beam and three adjustable points, needed for this operation the "Cherry picker"

Light modules

Socket head cap screw 5/16-18 thd

Modules North

Modules West

Modules south

Modules East