Plan for the installation of the TAMU screen
Area of work within the dome 4 meter Blanco
Equipment and tools in use Drills Cables Fiber Rope Wood Laser clamp Winches Cherry picker, electric articulated arm
Installation of the main beam This beam is located at the correct angle, using the clamp to hold it in the correct position. This is a work in height 15 m, and used the "Cherry picker" Beam clamp on three points
The beam is in the position shown in the figure but below the platform
Installation of the frame You have to lift the frame with winches to connect with the main beam. The connection of the frame with the beam in its three points using the Cherry picker. Frame While the frame connected to the beam, is to locate the position of the three arms that adjust the angle of the frame,
The frame with the screen connection The connection of the screen with the frame is on floor C, the crane is necessary to move the screen
Final connection and adjusting the screen The screen together with the frame for this operation are needed steel cables and winches. connect the three points of the beam and three adjustable points, needed for this operation the "Cherry picker"
Light modules
Socket head cap screw 5/16-18 thd
Modules North
Modules West
Modules south
Modules East