Radiation Safety Management

Slides:



Advertisements
Similar presentations
ROBOTS IN RADIOACTIVE ENVIRONMENTS.
Advertisements

ACTIVE LEARNING PROCESS
All Rights Reserved, Copyright (C), MITSUBISHI HEAVY INDUSTRIES,LTD. NO.1 Application of cavitation jet technique to operating nuclear power plant September,12.
Copyright [insert date set by system] by [CH2M HILL Entity] Company Confidential Update on Fukushima Daiichi NPP 1 – Preparations for Core Debris Removal.
1 August 30-31,2010 Kyushu Electric Power Co.,Inc. Nuclear Power Operatio n Dept. Masahiro Yoshinaga Approach for dose reduction in Sendai NPS August 30-31,2010.
CCTV System for Radiation Work Management Yonggwang NPP Unit 5 & 6.
Yonggwang NPP Unit 5&6. Background Status & Problem Plan & Improvement Effects Future plan Contents.
Bapetco NORM Control Case Study IDENTIFY ASSESS CONTROL & RECOVERY.
Warm magnets and the remote handling system in the J-PARCν beam line E. Hirose, K. H. Tanaka, Beam Channel Group.
Main Requirements on Different Stages of the Licensing Process for New Nuclear Facilities Module 4.5/2 Design Geoff Vaughan University of Central Lancashire,
ALARA Programs & Occupational Dose Trend in Wolsong NPP Korea Hydro & Nuclear Power Co., Ltd Wolsong Nuclear Power Plant Unit 3&4.
1 AFPC Norm Decontamination Facility Plant (NDF) 1.Introduction - The passage of produced water through pipe work and plants leads to the built up of Norm.
RMS alarm under IHA decontamination Shin-Kori Nuclear Power Plant Korea Hydro & Nuclear Power.
ALARA Activities at Ohi NPP Ohi Nuclear Power Plant Kansai Electric Power Co., Inc.
ALOKRAJ. V - NA07B004. High Pressure Water Jet Blasting Machine  One Electric driven water blasting machine  2 water jet guns, hoses 400 feet each as.
1 OCCUPATIONAL EXPOSURE at JAPANESE NUCLEAR POWER PLANTS in 2005 October 12, 2006 Shigeyuki Wada Safety Information Division Japan Nuclear Energy Safety.
Radiation Safety Management KHNP Lee Eung-Il HANUL Unit4 Steam Generator Replacement.
+ STAR HFT Upgrade – Installation and Integration Rahul Sharma Brookhaven National Laboratory.
MODULE “PROJECT MANAGEMENT AND CONTROL” RADIATION PROTECTION SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP , Programme “Leonardo.
Government of Western Australia Department of Mines and Petroleum Please read this before using presentation This presentation is based on content presented.
IAEA International Atomic Energy Agency Radiation Protection Issues in Nuclear Installations (NPP & RR) Laszlo Sagi Radiation Safety and Monitoring Section.
MODULE “PROJECT MANAGEMENT AND CONTROL” SAFETY ASSESSMENT DURING DECOMMISSIONING SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP ,
1 Dose reduction actions in Tsuruga-2 NPP Hiroshi WADA, Yuuichi HAMANAKA, Masayuki FUKUDA Tomomi YOSHINAGA, Eiji SANEHIRA,Masahiro YANO, Yasuo UNI, Kazushige.
Table of Contents  General Description  Concept of RX Vessel and Location of Defect  Radiation Dose Control  Repair Schedule of Bottom Header Defected.
PARTNERS MAINT COMPANY LTD International Nuclear Forum "BULGARIAN NUCLEAR ENERGY - NATIONAL, REGIONAL AND WORLD ENERGY SAFETY “, Varna, 2-4 June 2011.
1 Target Station Design Dan Wilcox High Power Targets Group, Rutherford Appleton Laboratory EuroNu Annual Meeting 2012.
1 Target Station Design for Neutrino Superbeams Dan Wilcox High Power Targets Group, Rutherford Appleton Laboratory NBI 2012, CERN.
adiation safety management practices in 19th preventative maintenance of Kori unit 4 and future plans.
RICH1 Gas Enclosure Installation. Experimental Area Meeting at CERN on 21st June 2006 Bill Cameron (Imperial College London) on behalf of the RICH1 team.
Is not a crane Is not a jack or mechanical ladder Lifts are engineered to hoist and support vehicles….nothing else!  Before using lift make sure it.
The Improvement of ALARA for the Steam Generator Maintenance Radiation Safety Department The 3 rd Plant, Ulchin Nuclear Power Site.
CCTV System for Radiation Work Management Yonggwang NPP Unit 5 & 6.
1 ALARA at the Borssele nuclear power plant. 2 ALARA at the Borssele P Borssele  NPP Borssele  In the delta in the Southwest of the Netherlands  KWU.
Unit 2, Genkai Nuclear Power Plant
SECONDARY BEAM HANDLING AND INFRASTRUCTURE DESIGN STATUS BRUNO FERAL (CERN/EN) DIAMANTO SMARGIANAKI (CERN/EN) Project Leader: I.Efthymiopoulos (Cern/EN)
STORAGE AND MAINTENANCE OF LARGE FARM EQUIPMENT Prepared by : Von G. Peavy South Region Ag Mechanics.
&2 UNIT KORI NPP. 2 General Introduction Ⅰ Ⅲ GOOD PRACTICE FIELD APPLICATION CONCLUSION Ⅴ Ⅱ GOOD PRACTICES EFFECT ANALYSIS ⅳ.
1 PASSIVE DOSIMETER BENCHMARKING. 2 CONTEXT French regulations originally required film to be used as a passive dosimeter. The decision dated 23 rd March.
FULL SYSTEM DECONTAMINATION (FSD) OF THE PWR STADE PRIOR TO DECOMMISSIONING
Reduction of the collective doses in Almaraz Nuclear Power Plant through source term reduction and the work load reduction.
1 Activitiesfor Dose Reduction Hamaoka Nuclear Power Station Chubu Electric Power Co.,Inc. November 2005.
Control of occupational exposure when working within a reactor containment building at power Matthew Lunn British Energy Generation Ltd. Sizewell B Power.
The ESS Target Station Eric Pitcher Head of Target Division February 19, 2016.
Repair of MCWV magnets (TT84 – M2). Works on three magnets : MCWV 693, MCWV 697, and MCWV 701 and the associated XABS Cause of the repair : XABS jam into.
Nuclear power plant Performed by Zhuk A.D.. Purpose of this presentation is to show importance and danger of nuclear power plant. My opinion: I think.
Temperature Test Allows monitoring of temperature changes.
Environmental protection
Beam Dump Hall Volume Beam Dump Meeting at SLAC May S.Ban
02:21 Full System Decontamination at the Obrigheim Nuclear Power Plant Prior to Decommissioning Wilhelm Kukla, EnBW Kernkraft GmbH, Obrigheim NPP Christian.
ALARA Activities at Ohi NPP
Radiological Work Management Aspects influencing Dose Reduction at the Ignalina NPP during Outages and coming Decommissioning Radiation Protection Centre.
Radiation Protection Issues After 20 Years of LHC Operation
ALARA Programs & Occupational Dose Trend in Wolsong NPP
Replacement of a Leaking Beam Port Bellows
RESIDENTIAL PLUMBING SYSTEMS (WATER SUPPLY)
Lesson 24 NATURAL CIRCULATION
Pressurized Water Reactor
CN−242 03b–12/ID52 Exposure Scenario and Pathway
NRC Event Number – Event Date
Instructions for Wipe Testing for Radioactive Material Contamination
Power Plant Engineering. Boilers Boilers Boiler is an apparatus to produce steam. Thermal energy released by combustion of fuel is used to make steam.
Session Name: Lessons Learned from Mega Projects
CCTV System for Radiation Work Management
CCTV System for Radiation Work Management
The Improvement of ALARA for the Steam Generator Maintenance
Global Safety Standard Orientation Line and Equipment Opening
Radiation Protection Handbook
2019/7/9 Application of cavitation jet technique to operating nuclear power plant MITSUBISHI HEAVY INDUSTRIES, LTD.  Hironori Onitsuka KORYO ENGINEERING.
Full Service Plumbing Columbus, Ohio. plumbing The art and science of creating and maintaining sanitary conditions in a building used by humans. It is.
Effects of Cold on Military Vehicles
Presentation transcript:

Radiation Safety Management HANUL Unit4 Steam Generator Replacement Radiation Safety Management KHNP Lee Eung-Il

Hanul (#1,2,3,4,5,6)) Seoul Shin-hanul (#1,2) Shin-hanul (#3,4) In operation under construction planning 23 units (20,716 MW) 5 units (6,600MW) 4 units (5,600 MW) Hanul (#1,2,3,4,5,6)) Shin-hanul (#1,2) Shin-hanul (#3,4) Wolsong (#1,2,3,4) Shin-Wolsong (#1) Shin-Wolsong (#2) Hanbit(#1,2,3,4,5,6) Kori (#1,2,3,4) Shin-Kori (#1,2) Shin-Kori (#3,4) Shin-Kori (#5,6) Yonggwang (#1,2,3,4,5,6)

CONTENTS 1 2 3 4 Summary Main process Radiation safety management Radioactive waste management

1. SUMMARY Condition HANUL Unit 4 business operated day : 31, December, 1999 type : PWR(pressurized-water reactor) reactor shutdown day : 9th, September, 2011 Replacement Subject : two steam generators reason : excess of acceptance rate of steam generator tube plugging period of replacement : 2013. 5.10 ~ 8.14(97D)

2. MAIN PROCESS 2 3 4 5 1 AUGUST Work Item JUNE JULY MAY 5.10 ~ 5.31 Preparation work(22d) ㆍbringing equipment into RCB ㆍinstallation of refueling pool cover ㆍcutting pipes of MS & FW ㆍinstallation of SG lifting equipment(HLU/TLD) SG replacement work(37d) ㆍcutting RCS pipes ㆍtaking out OSG from RCB ㆍdecontamination of RCS end pipes and processing cutting plane ㆍbringing RSG into RCB and Fit-up ㆍwelding and NDE of RCS pipes Successive work & start-up(29d) ㆍSG ECT ㆍrefueling operation ㆍmaking a trial run ㆍsynchronization & connection AUGUST Work Item JUNE JULY 5.12 ~ 5.13 5.16 ~ 5.27 5.28 ~ 5.31 5.10 ~ 5.12 6.09 ~ 6.11 6.07~ 6.16 6.12 ~ 6.18 6.07 ~ 6.09 6.19 ~ 7.12 7.12 ~ 7.24 7.18 ~ 7.21 7.26 ~ 8.06 8.14 5.10 ~ 5.31 6.07 ~ 7.12 (RCS Critical Window) 7.12 ~ 8.09 MAY

2. MAIN PROCESS Installation of the temporary power supply cable 1 Installation of the refueling pool cover 2 Installation of the temporary auxiliary crane 3 Installation of the scaffold & removal of insulation 4 Installation of shielding materials & fixing device 5 cutting the main steam pipes 6

2. MAIN PROCESS 8 9 7 12 10 11 disassembling of disconnecting of the PWR 7 disconnecting of SG upper fixture 8 marking the cutting part of RCS pipes 9 Installation of the rail 10 Installation of the lifting equipment(HLU/TLD) 11 disconnecting of SG lower fixture 12

decontamination of the 2. MAIN PROCESS cutting the RCS pipes 13 coating the SG surface 14 preparation of taking out SG 15 Taking out the SG 16 preservation of the SG into OSGSF 17 decontamination of the inside RCS end pipes 18

2. MAIN PROCESS 19 20 21 22 23 24 RCS pipes processing the cutting plane 19 new SG transportation 20 bringing of the new SG into RCB 21 fitting up of the new SG on the RCS pipes 22 new SG and RCS pipes outside welding 23 RCS pipes inside welding 24

synchronization & connection 2. MAIN PROCESS Inspection & removal of foreign materials welding of the MS/FW pipes Installation of the insulation materials 25 26 27 loading the nuclear fuel reactor start-up 28 synchronization & connection 29 30

3. RADIATION SAFTY MANAGEMENT 1) Woker exposure dose management management goal collective dose goal : 210 man-mSv, result : 177 man-mSv individual dose : 16 mSv/yr unavoidable case of excess exposure: 20 mSv/yr legal requirement : 50 mSv/yr, 100 mSv/5year

3. RADIATION SAFTY MANAGEMENT ○ Exposure dose of the major work NO Major work goal result 1 RCS pipes cutting, grinding, welding 120 106.6 2 RCS pipes clamping, supporting 15 14 3 RCS pipes inside decontaminating 10 7.6 4 SG support fixture, platform removal and installation 7 4.9 5 Shielding materials installation and removal 3.9 6 Heat insulation materials of SG, RCS pipes removal and installation 4.4 others 48 36.3 total 210 177.7

3. RADIATION SAFTY MANAGEMENT 2) Method of reducing exposure radiation dose for worker delay the draining of SG primary and secondary coolant conducting pre-mock up training for major radiation work radiation shielding : installation of temporary lead shielding materials for RCS pipes and lead shielding structure for OSG installation of the movable air cleaning unit monitoring continually the air contamination level(movable continuous air contamination monitor) decontamination of the inside of RCS end pipes measurement of radiation and radioactivity for a day, of work

RCS and MS/MW pipes cutting machine 3. RADIATION SAFTY MANAGEMENT ○ Conducting pre-mock up training for major radiation tasks cutting welding RCS and MS/MW pipes cutting machine RCS pipes welding

pipe end decontamination(PED) 3. RADIATION SAFTY MANAGEMENT ○ Conducting pre-mock up training for major radiation tasks shielding decontamination shielding plug pipe end decontamination(PED)

3. RADIATION SAFTY MANAGEMENT ○ Conducting pre-mock up training for major radiation tasks transportation SG weight : 546 ton, total weight : 637 ton(included saddle, lashing) Mock up weight : 730 ton

3. RADIATION SAFTY MANAGEMENT ○ Radiation shielding(pipes and object)

3. RADIATION SAFTY MANAGEMENT ○ Radiation dose rate after shielding (mSv/h) location Installation place mSv/h before after RCB 86’ Reactor drain pipe 0.2 0.08 Refueling Pool drain pipe 12.5 5.5 RCB 100’ SG hot leg pipe 0.5 SG cold leg pipe 0.25 0.15 RTD pipe 0.1 RCB 116’ SG H/L→PZR Surge Line ※ total quantity needed of lead material : 1,150 sheets

3. RADIATION SAFTY MANAGEMENT ○ Radiation shielding(SG lead shielding structure)

SG transportation terms 3. RADIATION SAFTY MANAGEMENT SG transportation terms outside surface of transporting object : 2 mSv/h outside surface of transporting vehicle from 2m : 0.1 mSv/h surface contamination : below surface contamination control limits surface contamination control limits : 4 Bq/cm 2 Measured value outside surface of transport object : 3.1 uSv/h outside surface of transport vehicle from 2m : 2.84 uSv/h(→0.44 uSv/h) surface contamination : natural background radiation level

3. RADIATION SAFTY MANAGEMENT ○ Installation of the movable air cleaning unit capacity : 2,000cfm, 750cfm, 560cfm

3. RADIATION SAFTY MANAGEMENT ○ Monitoring continually air contamination Continual air monitor Grab sampler

3. RADIATION SAFTY MANAGEMENT ○ Pipe end decontamination(PED) of RCS

4. RADIOACTIVE WASTE MANAGEMENT ○ Generated amount of radioactive waste unit : kg type iron cotton paper vinyl plastic rubber insulation amount 9,416 1,094 937 1,543 163 1,073 2,100 ○ Method of reducing radioactive waste iron high level contamination : storage of 200 ℓ drum low level contamination : disposal after long term storage rest of radioactive waste : storage of 200 ℓ drum

Thank you for your attention Question? e-mail : aop123@khnp.co.kr