Pack Level (End Item Assembly) Testing

Slides:



Advertisements
Similar presentations
Lithium Batteries United Nations Transportation Regulations
Advertisements

attract circuit When two objects are pulled together.
attract When two objects are pulled together circuit.
1 Washington, Oct. 2nd 2013 Informal working group: Large Lithium batteries testing RECHARGE & SAFT.
Considerations About UN38
+ V (Volt) = W (work done, J) Q (charge, C)
UN 38.3 Lithium-ion Battery Testing
1 6th WRBRF 2015 Berlin, March Review of changes voted to Section 38.3 of the UN Manual of Tests & Criteria (INF 11.) UNSCETDG Geneva, Dec.
An illustration of EVS-GTR Battery System Test Project and Test Methods’ Adaption to Commercial Vehicles Peter Wu, BYD.
New cell technology spurs hybrid batteries: Testing of Lithium Batteries Containing Both Primary and Secondary Cells. Transportation of Lithium Batteries.
How Can the Confusion About the Battery Definition be Overcome?
UN Informal Working Group Meeting on Lithium Battery Tests Ideas to Address Problems Testing Large and Small Cells and Batteries George A. Kerchner Executive.
Electrical Circuits Objective: What is a simple circuit? How does electricity flow through a simple circuit to produce heat, light, and sound?
UN Transportation Tests and UL Lithium Battery Program
Objectives of Class Session Review of Voltage, Current, Power KCL KVL Conservation of Power Series and Parallel Connection of Elements.
Unit E Lesson 7 Study Guide. What is electrical energy? 1). A battery provides _____ energy. 2). The chemical reactions in a battery produce _________.
Shanghai Research Institute of Chemical Industry
UN Lithium Battery Tests George A. Kerchner PRBA – The Rechargeable Battery Association 1776 K Street, NW Washington, DC
Lithium Battery Definitions in UN Manual of Tests and Criteria George A. Kerchner PRBA – The Rechargeable Battery Association 1776 K Street, NW Washington,
Current Electricity.
PRBA – The Rechargeable Battery Association
ENERGY INSTITUTE Battery Research Group NiMH Battery Pack for HEV Cem Kaypmaz 2008 İstanbul.
Cells in Series and Parallel (page 310) Cells in Series and Parallel Dry cells can be connected together into two basic types of circuits: series.
10.7 Cells in Series and Parallel (page 310). A “dry cell” is another term for a battery. Dry cells can be put together in two ways to change the energy.
Volker Rothe, OICA October 23, 2012 Draft Global Technical Regulation Electric Vehicle Safety Outline of the OICA proposal.
Parts of An Electric Circuit Recall: a circuit is a closed path Electric circuit: closed path that flowing charge follows Constructing an electric circuit:
1 Washington, Sept 29th, 2014 Informal working group: Large Lithium batteries testing RECHARGE & SAFT.
TREADS Semester Review Dec. 14, Objectives Assess and Communicate Current Design Identify interfaces Approve the System Requirement Specification.
Lesson 2 How do electric circuits work?. Electric Circuits You know that electric circuits only work when the circuit is closed. OPEN.
Circuits : Series vs Parallel
Electric Current- A flow of electric charges is an electric current.
C ELLS IN S ERIES AND P ARALLEL Science 9. W HAT IS A CIRCUIT ? A circuit is when electrical current flows through a controlled path.
Power. Energy Transformation Electric energy can be transformed into other more useful forms Power is the rate of energy transformation P = ΔPE/t ΔPE.
There are two requirements that must be met in order to establish an electric circuit 1.There must be an energy source (battery) capable of doing work.
Rechargeable Energy Storage systems (REESS) requirements Gerd Kellermann, Germany Informal document GRSP (51 st GRSP, May 2012,
EMF and Potential Difference Animation of current flow.
Electricity Bingo. This remains constant throughout a series circuit.
Electric Circuits. Electric Current – the movement or flow of electric charges from one place to another. Electric Circuit – a controlled path in which.
Hybrid Lithium Batteries Containing Both Lithium Metal and Lithium Ion Cells and / or Batteries – Limits for Exemption & External Charging. Dr. Thomas.
Task Force 8: Heavy Duty Vehicles
Dry Cell Batteries Dry cell batteries are not actually dry
Batteries as Integral Part of Equipment
Task Force 3: Electrolyte leakage
Task Force 3: Electrolyte leakage
Advantages and Disadvantages of Series and Parallel Circuits
Electric Vehicles Safety Global Technical Regulation
Electricity How & where it’s used Review of the atom
Motorola Solutions Internal Information
A deeper look into different types of circuits
Electronics Revision Part 2
CURRENT ELECTRICITY.
Photovoltaic (PV) Systems
21.2 Parallel Circuits In parallel circuits the current can take more than one path.
Intro to Circuits Lab Before we begin, note the following safety rules: Handle wire ends with care as they may be sharp and could cause cuts. There is.
Topic H: Electrical circuits
Series and parallel circuits
New UN Regulation on electric vehicles of category L
Motorola Solutions Internal Information
Clarification testing assembled batteries
Forms of Energy Unit 3 Part 2 Vocabulary.
Current electricity Ch. 34
Considerations About UN38
Japan’s response to Action item 2 EVS-GTR IWG#17.
Electricity/Start & Charge systems
Energy and Circuits Energy
Basic Circuits.
Unit 1 Vocabulary (set #1)
Circuits _____________ ______________
Electricity/Start & Charge systems
Supplemental material on TF5 Japan comments
Presentation transcript:

Pack Level (End Item Assembly) Testing Start Have UN 38.3 Li+ cell level reqts been satisfied?   Supplier to satisfy cell testing N Has module assy passed applicable UN tests? N Y If applicable, have UN 38.3 module reqts been met? See module testing flow chart N Y Batteries that are electrically connected to form an assy must be equipped with a system capable of detecting and preventing short circuit, over charge, over discharge, and over heating when operational. Y or N/A Does DUT contain total energy > 6.2 kWhr? Has module assy passed applicable UN tests? Y N Y   N Y Meet? N Is DUT mass ≤ 12 kg? Obtain one DUT (@ 25 cycles & SOCfull) N Y Obtain 2 DUTs (@ 1 cycles & SOCfull) & Obtain 2 DUTs (@ 25 cycles & SOCfull) Obtain 4 DUTs (@ 1 cycles & SOCfull) & Obtain 4 DUTs (@ 50 cycles & SOCfull) Test all DUTs to T.1 (Altitude) then T.2 (Thermal) in sequence Test all DUTs to T.3 (Vibration) then T.4 (Shock) then T.5 (External Short Circuit) in sequence  Does DUT contain total energy > 6.2 kWhr>? Are DUTs equipped with overcharge protection? Y N N Y Test 4 small/2 large same (undamaged) or different DUTs (@ 1 cycles & SOCfull)* and Test 4 small/2 large same (undamaged) or different DUTs (@ 50 (small) or 25 (large) cycles & SOCfull)*; Or if ≤ 6.2 kWhr, test 1 same (undamaged) or different DUT (@ 25 cycles & SOCfull)* Test to T.7 (Overcharge) *Note: batteries may be run in parallel for T7; 2 or 4 additional batteries would be required (for < 6.2 kWhr, 1 additional battery required) Review test results to determine whether acceptance criteria has been met UN38.3 Flowchart

Module (Sub-assembly) Testing Start Have UN 38.3 Li+ cell level requirements been satisfied?   N Supplier to satisfy cell testing Y Are we testing something less than a full assembly? N See pack level testing flow chart Y Is DUT mass ≤ 12 kg? N Y   Test 2 DUTs (@ 1 cycles & SOCfull) & Test 2 DUTs (@ 25 cycles & SOCfull Test 4 DUTs (@ 1 cycles & SOCfull) & Test 4 DUTs (@ 50 cycles & SOCfull) Test same DUTs to T.1 (Altitude), T.2 (Thermal), T.3 (Vibration), T.4 (Shock) and T.5 (External Short Circuit)  Is DUT equipped with overcharge protection? N Y Test 4 small/2 large same or different DUTs (@ 1 cycles & SOCfull); Test 4 small/2 large same or different DUTs (@ 50 (small) or 25 (large) cycles & SOCfull); Test to T.7 (Overcharge) Review test results to determine whether acceptance criteria has been met UN38.3 Flowchart