Spoke Cavity Power Coupler for the European Spallation Source (ESS)

Slides:



Advertisements
Similar presentations
BEPCII RF POWER SYSTEM RF group, IHEP Sep ~ April 1.The 1 st transmitter had finished installing,commissioning and SAT (Site Acceptance Test).
Advertisements

CC2 Input Coupler Introduction, Installation, & Processing Tim Koeth November 16 th, 2005.
Safety Review: RF Issues Derun Li Absorber Safety Review December 9-10, 2003 Lawrence Berkeley National Laboratory Berkeley, CA
MuCool RF Status MICE Collaboration Meeting June 7-10, 2006, Fermilab A. Moretti June 9, 2006.
Automation of the 805MHz cavity conditioning procedure Ajit Kurup MuCool Test Area RF Workshop, Fermilab 22 nd August 2007.
DESIGN OF A HIGH POWER TEST STAND FOR ESS SPOKE CAVITIES
Possible Assembly and Test of the Crab cryomodule in SM18 at CERN P. Maesen LHC Crab Cav meeting, 17 Sep’ 09 LHC-CC09Cryomodule Assembly & Test Stand.
ANNEX. WP 1.04, Michael Ebert2MAC PETRA-III Review Meeting, DESY,29th November 2006 Sandblasted Center Conductor of a Cavity Input Coupler R a =
Status of 325MHz coupler S. Kazakov 11/29/ MHz coupler structure.
Front End Test Stand Klystron Commissioning Alan Letchford UKNF Plenary Meeting 22 nd April 2009.
Test Stands Roger Ruber Uppsala University ESS TAC4 16 Feb
1 Results from the 'S1-Global' cryomodule tests at KEK (8-cav. and DRFS operation) Shin MICHIZONO (KEK) LOLB-2 (June, 2011) Outline I. 8-cavity installation.
February 17-18, 2010 R&D ERL Alex Zaltsman R&D ERL High Power RF Systems Alex Zaltsman February 17-18, 2010 High Power RF Systems.
HT-7 HIGH POWER MICROWAVE TEST SYSTEM AND EXPERIMENTS WANG Mao, LIU Yue-xiu, SHAN Jia-fang, LIU Fu-kun, XU Han-dong, YU Jia-wen Institute of Plasma Physics,
RF Development for ESS Roger Ruber and Volker Ziemann Uppsala Universitet 4 Dec Dec-20091RR+VZ: ESS RF Development.
Anders Sunesson RF Group ESS Accelerator Division
Test plan for SPL short cryomodule O. Brunner, W. Weingarten WW 1SPL cryo-module meeting 19 October 2010.
Eric Montesinos - CERN - First SPL collaboration meeting - CERN December 11th 2008 First SPL collaboration meeting Experience with the LHC Main power Coupler.
High power RF tests places at CERN O. Brunner, CERN 4th SPL Collaboration Meeting jointly with ESS.
XBOX-2 Signals Ben Woolley. Signals minus Vacuum.
ALBA RF System Paco Sanchez - 13th ESLS RF - DESY, 30 September Paco Sanchez, RF Group, CELLS (Consortium for the Exploitation of the Synchrotron.
Pierre Bosland 4 TH OF FEBRUARY 2016 COORDINATION COMMITTEE FR-SW AGREEMENT STATUS OF THE FRENCH ACTIVITIES UNDER THE RESPONSIBILITY OF CEA.
C/S band RF deflector for post interaction longitudinal phase space optimization (D. Alesini)
June 16, 2015 CLIC WORKSHOP JANUARY 18 – 22, 2016 OPTIMIZED RF UNIT I 1 January 21, 2016 By: Mikael Lindholm.
RF Commissioning D. Jacquet and M. Gruwé. November 8 th 2007D. Jacquet and M. Gruwé2 RF systems in a few words (I) A transverse dampers system ACCELERATING.
Status of Vertical Test Stand at RRCAT P Shrivastava, P Mohania,D.Baxy, Vikas Rajput S C Joshi, S Raghavendra,S K Suhane RRCAT, Indore November 26, 2012.
Wish list from ESS Christine Darve H-ECCTD Kick-off meeting 16 March
Spoke section of the ESS linac: - the Spoke cryomodules - the cryogenic distribution system P. DUTHIL (CNRS-IN2P3 IPN Orsay / Division Accélérateurs) on.
ESS SC cavities development G. Devanz TTC meeting, march 1st 2011, Milano.
P. Bosland CEA-Saclay Collaboration Board meeting Copenhagen 14/04/ Status of the French activities under the responsibility of CEA Philippe CHOMAZ.
Areal RF Station A. Vardanyan
Status of the M-ECCTD F. Peauger - P. Bosland
Tongming Huang (IHEP) On behalf of the power coupler working group
RF cell Anders Sunesson RF group leader
Cryomodule test stand at ESS site
WP5 Elliptical cavities
Uppsala Commitment to ESS and FREIA Planning
An X-band system for phase space linearisation on CLARA
RF interlocks for higher intensities (LMC 15 June)
Chris Adolphsen Sergei Nagaitsev
Functional interfaces
Hosting Orsay Walid KAABI
Test plan of ESS HB elliptical cavity
Test plan of ESS HB elliptical cavity
The situation is far better than I had thought.
352MHz Klystron Control for the 3MeV Linac test stand
12 GHz High Power RF components requirements for CEA activities
Test plan of ESS HB elliptical cavity
RF Matching Network Description
Test plan of ESS HB elliptical cavity
Cryogenic C&C Scope of work
BEPCII RF POWER SOURCE AND INPUT COUPLER
Test plan of ESS HB elliptical cavity
UITF MPS system requirements
Test plan of ESS HB elliptical cavity
First High Power Test of the ESS Double Spoke Cavity package
RF Pulse Shaping.
An Optimal Procedure for RF Conditionning at the FREIA Laboratory
RF Local Protection System
FAIR pLinac RFQ Meeting pLinac RF Power Sources
Cryomodules Challenges for PERLE
RF systems introduction
The spoke CM tests at FREIA
Spoke section of the ESS linac: - Status of prototypes and CDS-SL
System tests at CEA O. Piquet 19/03/2019
UITF Conduct of Operations Review
Bonjour. Franck Peauger. Je suis Ingénieur RF accélérateurs au SACM
RF introduction Anders Sunesson RF group leader
Vacuum Control System for Monolith Vacuum
Burst Disc Review Closeout 21 May 2019 J.G. Weisend II, Chairman.
Presentation transcript:

Spoke Cavity Power Coupler for the European Spallation Source (ESS) RF Interfaces Meeting, November 22nd 2016 Emmanuel Rampnoux, IPN Orsay

Main Hardware Security Box RF Conditioning Test Stand RF Tests Main Hardware Security Box RF Power Meter RF Power Meter 50Ω Load RF High Power Circulator Bi-Directional Coupler RF Dividers + RF Attenuators G RFIN RFOUT Doorknobs G Dummy Load RF Signal Generator + Signal Pulse RF Switch RF Preamplifier RF Power Meter Power Couplers RF Short Circuit Klystron 2 MW RF Pulse 352,21 MHz Pin max= 0 dBm Heat Exchanger SAFETY INTERLOCKS RF Cut Off Vacuum Electron Activity Electric Arc Water Flow RF Power Level Air Pressurized RF Conditioning cavity + Plunger Pumping cart LabView Program RF Power Level vs. Vacuum Level E. Rampnoux | IPNO ESS | RF Interfaces Meeting | IPN Orsay | November 22nd 2016

RF Conditioning Test Stand RF Power Measures Safety Interlocks Water Flow Control System RF Short Circuit Arc Detectors Pumping Cart E. Rampnoux | IPNO ESS | RF Interfaces Meeting | IPN Orsay | November 22nd 2016

RF Conditioning Profile RF conditioning according to the vacuum values 3 vacuum thresholds deals with the conditioning RF levels adapted according to the SW or TW mode E. Rampnoux | IPNO ESS | RF Interfaces Meeting | IPN Orsay | November 22nd 2016

Safety Interlocks E. Rampnoux | IPNO ESS | RF Interfaces Meeting | IPN Orsay | November 22nd 2016

Safety Interlocks Arc Detector Arc Detectors Power coupler E. Rampnoux | IPNO ESS | RF Interfaces Meeting | IPN Orsay | November 22nd 2016

Safety Interlocks Electron Activity E. Rampnoux | IPNO ESS | RF Interfaces Meeting | IPN Orsay | November 22nd 2016