THEMIS INSTRUMENT SUITE FM4/FM5 PRE-ENVIRONMENTAL REVIEW

Slides:



Advertisements
Similar presentations
Tracker Subsystem1 GLAST LAT Project FM8/14 PSR, Oct. 5, 2005 GLAST LAT Tracker Towers 8/14 Pre-Ship Review INFN-Pisa.
Advertisements

Manufacturing Products
MPSRESA- 1 UCB, Oct 26, 2006 THEMIS MISSION PRE-SHIP REVIEW ESA C. Carlson, M. Ludlam, J. McFadden University of California - Berkeley.
Solar Cell Efficiency Flight Readiness Review Teddy Bounds Angela Dunn Joel Sasser.
MPSRThermal- 1 UCB, Oct 26, 2006 THEMIS MISSION PRE-SHIP REVIEW Thermal Christopher Smith University of California - Berkeley.
THEMIS INSTRUMENT PER 1 UCB, May, 2005 EMC / Mag Instrument Test Plan & Results Michael Ludlam University of California - Berkeley.
1 UCB, May 04, 2005 Magnetometer Booms Vibration Issues Berkeley Composites Laboratory Department of Mechanical Engineering University of California at.
STEREO IMPACT SEP Critical Design Review 2002-Nov-20 TvR IMPACT/SEP Thermal Design John Hawk, GSFC (301)
THEMIS F2/F3 IPSR and F4/F5 IPER 1 By Telecon, November 10, 2005 THEMIS INSTRUMENT SUITE FM2/FM3 PRE-SHIP REVIEW FM4/FM5 PRE-ENVIRONMENTAL REVIEW Thermal.
THEMIS Instrument Suite PERSuite T-V- 1 UCB, May 2, 2005 THEMIS Instrument Suite Thermal Vac Test Rick Sterling University of California, Berkeley.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW I-PER 21 January EFW Test Plan Michael Ludlam Space Sciences Laboratory.
THEMIS Instrument PDR 1 UCB, October 15-16, 2003 IDPU Mechanical / Thermal Preliminary Design Review Heath Bersch University of California - Berkeley.
THEMIS Instrument CDR 1 UCB, April , 2004 EFI Axial Booms Thermal Christopher Smith Thermal Engineer
THEMIS Instrument CDR(1) UCB, April 19 & 20, 2004 Mission Assurance Critical Design Review Ron Jackson University of California - Berkeley.
FM4/FM5 PSRSCM - 1UCB, May 5 th, 2006 THEMIS FM4/FM5 INSTRUMENT SUITE PRE-SHIP REVIEW (PSR) SEARCH COIL MAGNETOMETER (SCM) Michael Ludlam University of.
STEREO IMPACT Critical Design Review 2002 November 20,21,22 Presenter1 Thermal Control R.Eby Impact Boom Stowed and Deployed SWEA STE Magnetometer Bob.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW Boom PER 30 June RBSP EFW Spin Plane Booms Greg Dalton Space Sciences.
FM1 Instrument Suite Pre-Ship Review (PSR)Thermal-1UCB, September 21, 2005 THEMIS FM1 INSTRUMENT SUITE PRE-SHIP REVIEW (PSR) THERMAL Chris Smith University.
FM2 PPSRAGENDA 1 UCB, March ??, 2006 THEMIS PROBE FM2 PRE-ENVIRONMENTAL REVIEW INTRODUCTION Paul Turin LME University of California - Berkeley.
THEMIS Instrument FM2/FM3 PERSystems- 1 Teleconference 8/30/2005 THEMIS Instrument FM2/3 Pre-Environmental Review System Overview Ellen Taylor University.
MPSRQA- 1 UCB, Oct 26, 2006 THEMIS MISSION PRE-SHIP REVIEW Mission Assurance Manager Ron Jackson University of California - Berkeley.
Hybrid panel heated plate study Currently the curing of the ASIC glue for the hybrid panels are done at room temperature. This is a study to determine.
THEMIS Instrument FM2/FM3 PEREnvironments- 1 Teleconference 8/30/2005 THEMIS Instrument FM2/3 Pre-Environmental Review Environments Jeremy McCauley University.
THEMIS IDPU PDR I&T REQUIREMENTS- 1 UCB, October 16, 2003 I&T REQUIREMENTS Ellen Taylor University of California - Berkeley.
THEMIS INSTRUMENT CDR Peer ReviewSYSTEM- 1 UCB, April 19, 2004 TITLE: Test Flow RFA CODE: UCB-10 REQUESTED BY: Preble SPECIFIC REQUEST: We recommend that.
F1, F3, F4, F5 PER 1 UCB, June 23, 2006 THEMIS MISSION PRE-ENVIRONMENTAL REVIEW Thermal Christopher Smith Thermal Engineer University of California - Berkeley.
FM1 Instrument Suite Pre-Ship Review (PSR)Magbooms- 1 UCB September 21, 2005 THEMIS FM1 INSTRUMENT SUITE PRE-SHIP REVIEW (PSR) MAGNETOMETER BOOMS Paul.
FM1 Instrument Suite Pre-Ship Review (PSR)INT- 1 UCB September 21, 2005 THEMIS FM1 INSTRUMENT SUITE PRE-SHIP REVIEW (PSR) INTEGRATION AND TEST PLANS Jeremy.
FM2/FM3 PSR FM4/FM5 PERSCM - 1UCB, November 10, 2005 THEMIS FM2/FM3 INSTRUMENT SUITE PRE-SHIP REVIEW (PSR) THEMIS FM4/FM5 INSTRUMENT SUITE PRE- ENVIRONMENTAL.
THEMIS Instrument CDR 1 UCB, April 19-20, 2004 EFI Preamp Sensor G.T. Delory, A. Hull, D. Schickele, J. Bonnell & The EFI Team University of California.
MPEREnvironmental Test OverviewUCB, June 23, 2006 THEMIS MISSION PRE-ENVIRONMENTAL REVIEW Environmental Test Overview and Logistics Rick Sterling University.
FM2/FM3 IPSR AND FM4/FM5 IPERSYS - 1 UCB, November 10, 2005 THEMIS INSTRUMENT SUITE FM2/FM3 PRE-SHIP REVIEW FM4/FM5 PRE-ENVIRONMENTAL REVIEW SYSTEM OVERVIEW.
FM1 Instrument Suite PSRSCM - 1UCB, September 21, 2005 THEMIS FM1 INSTRUMENT SUITE PRE-SHIP REVIEW (PSR) SEARCH COIL MAGNETOMETER (SCM) Michael Ludlam.
TRIO-CINEMA 1 UCB, 2/08/2010 End of Summer Review Kevin Jenkins Mechanical Engineering Space Sciences Laboratory University of California, Berkeley.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW CDR /30-10/1 Thermal Design Christopher Smith RBSP Thermal Engineer Space.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW I-PER 21 January EFW Systems Engineering Michael Ludlam Space Sciences.
FM4/FM5 IPSRSYS - 1 UCB, May 5, 2006 THEMIS INSTRUMENT SUITE FM4/FM5 PRE-SHIP REVIEW SYSTEM OVERVIEW Ellen Taylor University of California - Berkeley.
1 SWEA pre-CDR Peer Review Particles and Fields Package (PFP) SWEA pre-CDR Peer Review Integration with PFP, Qualification, ATLO 2011 March 28 Dave Curtis.
1 PFP IPDR 2010/6/ Particles and Fields Package (PFP) Instrument Preliminary Design Review Integration & Test David Curtis, PF Package Manager.
GLAST Large Area Telescope:
Solar Probe Plus FIELDS V1234 Mechanical Pre-Ship Review May 26, 2017
THEMIS INSTRUMENT SUITE
FIELDS MEP Thermal Vacuum Cycling iPER
Mission Critical Design Review (MCDR) June 14-18, 2004
Solar Probe Plus FIELDS V1234 Mechanical Pre-Ship Review May 26, 2017
Gayle K. Martin November 14, 2016
FIELDS Mission Assurance Manager University of California, Berkeley
(EFW Systems Engineer) University of California, Berkeley
Team S.H.I.E.L.D. Final Presentation
THEMIS MISSION PRE-SHIP REVIEW
SPP FIELDS V1234 Thermal PSR
THEMIS Mission Assurance
THEMIS INSTRUMENT SUITE
FIELDS SCM Thermal iPER
Rapid Tooling.
THEMIS Solid State Telescope Instrument (SST)
THEMIS FM4/FM5 INSTRUMENT SUITE
LAT Requirements Verification in TVAC
0.0 Instrument Suite Name Presenter’s name
Jason Link University of Hawaii
University of California, Berkeley
MICE Coupling Coil Update
CONTOUR NGIMS PRE-SHIP REVIEW
CRaTER Pre-Environmental Review (I-PER) Completed Verification Results Bob Goeke September 10-11, 2008.
CRaTER Pre-Ship Review (I-PSR) Instrument Configuration Bob Goeke
Thermal Vacuum Test: Plans and Procedures
Integration and Test Organization Chart
CRaTER Pre-Environmental Review (I-PER) Completed Verification Results Bob Goeke September 10-11, 2007.
GLAST Large Area Telescope
Fiber Reinforced Polymer Systems
Presentation transcript:

THEMIS INSTRUMENT SUITE FM4/FM5 PRE-ENVIRONMENTAL REVIEW FM2/FM3 PRE-SHIP REVIEW FM4/FM5 PRE-ENVIRONMENTAL REVIEW THERMAL Chris Smith Lead Thermal Engineer University of California - Berkeley

There are No Open Thermal Issues Open Issues There are No Open Thermal Issues The following RFAs were closed after or at the F1 PSR FM1 PER RFA 02: Thermal Verification Test Summary FM1 PER RFA 03: Provide Instrument Level Thermal Balance Test Plan MCDR RFA 05: Adhesive Temperature Limits One PFR closed since F1 PSR PFR 095: Thermal Radiator Tape Adhesive Failure

PFR 095 DATE OPENED: 09/16/05 TITLE: Thermal Radiator Tape Adhesive Failure UNITS AFFECTED : SST, ESA, FGB, SCB, AXB PROBES AFFECTED: F1, F2, F3, F4, F5 ORIGINATOR: Christopher Smith PROBLEM DESCRIPTION: The ITO coated silver Teflon tape samples with 3M 9703 adhesive failed to remain adhered to its substrate in its third thermal vacuum test. First a testing history is required to understand the development of this problem. Before deciding to use this tape and adhesive for THEMIS we tested a sample of similar tape that was being used for the STEREO project. The tape used on THEMIS differs from the STEREO sample by manufacture date, perforation pattern, and method of adhesive application. The STEREO tape sample was thermal cycled 5 times from –135 to +80 ºC and examined. All tape samples remained adhered to their substrate and the tape’s surface conductivity remained within specification. We then ordered the THEMIS specific tape from Dunmore Corp. The STEREO tape was also ordered from Dunmore but came without the adhesive. APL personnel applied the 9703 adhesive manually on site. For THEMIS we had Dunmore apply the adhesive in their factory.

PFR 095 (cont) When the adhesive arrived it was attached to the same sample of aluminum and thermal cycled 6 times from –60 to +65 ºC. In this test all five tape samples failed to remain adhered to their substrate. After consultation with 3M we modified our application method. The tape was applied as it was in the first test and then warmed to 50 ºC. While still warm it was re-rolled and placed back in the oven for 12 Hours @ +50 ºC. These samples were then thermal cycled 6 times from –65 to +75 ºC and all tape samples remained adhered to the substrate so the test was considered a success. However, after the tape sample sat on my desk for 21 days at room temperature, it was noticed that three of the tape edges, out of 24 edges on 6 tape samples, had pulled up. This tape is used on the AXB, FGB and SCB Hinge, ESA, and SST. Three flight AXB units have been delivered for spacecraft integration but they all used the STEREO tape which passed qualification. We have enough excess STEREO tape to complete the remaining AXBs and FGB/SCB hinges.

PFR 095 (cont) Analyses Performed to Determine Cause: A Second test was done using more flight like hardware. The test samples consisted of two SST shells with flight alodine, one cylindrical support piece from the ETU ESA with flight alodine, and the same bare aluminum u-channel used in all previous tests. For all samples, various sized pieces of ITO coated Silver Teflon tape with 9703 adhesive was applied using the same method used in Test #3 above. Tape was applied with finger pressure and a Brayer roller at room temperature. It was then warmed to 60 deg Celsius in an oven. After this initial warm up, it was removed and the tape was re-applied using finger pressure and a brayer roller while hot. The samples were then placed back in the oven for 24 hours at 60 degrees Celsius. In Test #3 this is all of the preparation done to the samples. In Test #4 we took the additional step of applying conductive silver epoxy to the edges and corners of the tape pieces. This epoxy was then cured in the oven at 60Deg C for another 24 hours. One of the SST shells received no epoxy for comparison. All samples were then thermal cycled in a thermal vac chamber from –75 to 75 Deg C. Upon removal all tape was adhered well to the aluminum. All samples were examined under a microscope. All of the epoxy sites were intact except one. One failed due to an error during application that caused the epoxy at that site to be too thin. All other epoxy sites were intact and adhered to both the tape and aluminum. The edge of each tape piece was examined under the scope and mechanically tested for adhesion. All edges, including those on the SST without epoxy, were well adhered. The samples were then cycled again as ride-a-longs for another test. As before, they received 6 cycles from –75 to +75. They were inspected under the scope and all tape remained well adhered.

PFR 095 (cont) Corrective Action/ Resolution: Tape was retested using flight aluminum alodine treated samples and with silver epoxy holding down corners and long edges. This technique has resulted in a well-adhered tape that satisfies THEMIS requirements.

Instrument Suite Thermal Testing Status Due to an error F1 Suite did not go to the cold survival temperature before turn on. All units have separately been turned on at their cold survival limit. F2-F3 tested to the –60 survival temperature