Financing of LHC projects and CMS

Slides:



Advertisements
Similar presentations
BUDGETING Training Unit 13.2 Principles and financial rules of mobility.
Advertisements

FACE. What were the challenges of the FACE ? 1. UN system has run out of three letter acronyms – 17,576 combinations 2. We needed a name which reflected.
CLOUD Financial Review Committee meeting #3 1 October 2014 Financial plan for 2014 and beyond 1 Oct 2014, indico: rd FRC meeting, Antti Onnela,
ALICE © | RRB | 17 April 2013 | Catherine Decosse 24 th meeting of the ALICE Resources Review Board CERN-RRB
Managing an established facility: Scenarios for group work Kimmo Koski 26 October 2011.
Proposal for a Constitution for MICE A Plan for Discussion P Dornan G Gregoire Y Nagashima A Sessler.
PAD Seminar February Top Ten Reasons to Befriend Your Sponsored Program Administration Office SPA is the institutional office responsible for administrative.
12 Dec 2005 J. Schukraft1 ALICE USA ALICE position towards US participation EU participation in emcal Requirements Formal steps & schedule.
23 October 2001 RRB-131 Draft Budget for CMS M&O and C&I in 2002 Draft Budget for CMS Maintenance & Operation and Commissioning & Integration in the Year.
1 EUDET Status Preparation Annual Meeting Information Annual Report Joachim Mnich Extended Steering Committee Meeting September 11, 2006.
Financial Matters Ferdinand HAHN. Content Cost to completion (exceptional MOF 2014/15) MOF in 2013 (Budget – Contributions - Expenses) MOF in 2014 (Budget.
Region 5: RAB Meeting National Co-op Program 3/25/03 Region 5: RAB Meeting National Co-op Program 3/25/03.
HiLumi LHC is co-funded by the EU FP7 Capacities Programme, Grant Agreement Svet Stavrev (EU Projects Office, CERN) Administrative Manager 17.
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt CBM Collaboration meeting Status Interim MoU J. Eschke, GSI.
Joint Venture Agreements. Joint Ventures Joint Venture (JV) : Two or more construction contractors jointly competing for a particular project pooling.
December_2009 Partnership building. December_2009 Partnership building within the partnering process COREGROUPCOREGROUP FORMAL LAUNCH $ $ $ $ $ cost centre.
“Linear collider studies: This heading includes the total funding for CTF3, the CLIC study and the CLIC/ILC collaboration as well as the CERN’s participation.
G. Martellotti1CSN1 14 / 10 / 2002 LHCb Category A M&O status for 2002 and estimate for 2003 Report on Common Fund and CORE expenses for RRB Ott.
Draft Budget for M&O 2007 A. Petrilli, RRB-23, October 24, 2006 CERN-RRB Cf. CERN-RRB
Scrutiny Group Meeting, May 30, 2006 A. Petrilli, 24 May 2006.
Status of ATLAS Resources Presentation to RRB Markus Nordberg ATLAS Resources Coordination CERN-RRB
CERN Finance, Procurement and Knowledge Transfer Department / EDMS CERN-RRB CMS Resources Review Board 18 October 2011 Updates to Financial.
19/10/2001DJ for RRBs 22-23/10/ M&O MoUs - History so far 14 MarchIntent announced in RRB-D mid June - 12 JulyInitial draft formulation.
Most Common Fund spending now goes on infrastructure. In the course of next year, essentially all the remaining funds will be spent on finishing the sub-detectors.
Status of Contributions, Draft Budget Request for 2005 and Outlook for the Longer Term Future Martyn Davenport 8 TH October 2004 CAST FRC-D
Status of ATLAS Resources Presentation to RRB Markus Nordberg ATLAS Resources Coordination CERN-RRB
Collaboration Board 27/09/ Next RRB in October - Core and Common Funds in Projected M&O Cat. A budgets for the coming years - Received funds.
Implementing TAACCCT Round 2 Consortium Grants Management September 27, 2013.
Contract Compliance Training
USE OF ADMINISTRATIVE DATA
Large Synoptic Survey Telescope
Grant Fund Accounting Matt Wills F&A Institute November 4, 2016.
SUBRECEPIENTS POST-AWARD PROCEDURES
Global Solar Certification Network
Completion and Pre-Exploitation Costs for the Initial ATLAS Detector
Options for association and collaboration with CERN
Rafael De Andres Medina National Institute of Health Carlos III Spain
Ministry of Finance of the Republic of Azerbaijan
HCAL M&O-B Budget CMS Finance Board
30th meeting of the ALICE RRB C. Decosse
4th FRC meeting, Antti Onnela, CERN-PH-DT
Ways to industry participation in CLIC 24th October, 2017
Proposal Routing Overview
Status of ATLAS Resources
S4 will be a “big” Collaboration:
Contract Compliance Training
Status of ATLAS Resources
SCD Grants & Contracts Policy & Procedure 670.
Sponsored Programs at Penn
Project Charter I want to design a project
CMS Goal of the experiment
Effort Certification and Cost Sharing
INTRODUCTION TO PUBLIC FINANCE MANAGEMENT
Large International Collaborations
Overview of a typical grant budget
FACTORING bharath.
Overview of a typical grant budget
PCC Update 10/28/09 Planning Phase
Eligibility Rules Stefan Nyström, Managing Authority
Club Secretary-Treasurer-Designate
Durham and Orange Transit Plan Funding Needs
Institutions of Budget Execution: Rules and Roles
Funding instruments February 19, 2019 BRIEF.
Practical Aspects and Running of the Project
The Lodge at Snowbird 48th Annual Owners Meeting February 2, 2019
Government Funding CABC March 2019 Presented by: Samad Hosseini Thinker Technology Disclaimer: the information is.
Preliminary Project Execution Plan
Annex A1.6.2b RU access to OBI RNE General Assembly 16 May 2018.
Detector Proto-Technical board Sep 30, 2010
ESSA Transportation Claiming Supplemental Reporting Tool Training
Presentation transcript:

Financing of LHC projects and CMS LHC Days in Split Split, Croatia A. Petrilli, October 7, 2004 1

An LHC experiment All my experience is with the CMS experiment Most of the following is CMS specific While details may vary, there will be many similarities with other experiments CMS is the reference for what follows October 7, 2004 LHC Days in Split

Size and Complexity 12’000 tons 500 MCHF Over 2000 people 139 Institutes 37 Funding Agencies 36 Countries October 7, 2004 LHC Days in Split

Big and Small Contributions Contributions vary from as little as 106 kCHF to as much as 100 MCHF And all contributions are important October 7, 2004 LHC Days in Split

Funding The funding shown is only for deliverables Cost of Institutes’ personnel is not included Cost of R&D, prototyping is generally not included How can you fund and manage such a huge project? Centrally collecting funds and handling the whole project is not possible nor always optimal CMS case: divide responsibilities and delegate October 7, 2004 LHC Days in Split

CMS Organization October 7, 2004 LHC Days in Split

CMS Organization (2) The CMS Collaboration is organized as a federation of subsystems Each has its own financial and institutions boards Matters internal to the subsystems are directly dealt there The result is a more manageable structure which can follow more closely the needs and goals of everybody October 7, 2004 LHC Days in Split

Optimizing Funds Management The ratio of Common Funds to the total funding of CMS is around 12% Common Funds are managed centrally and globally funded by the Collaboration The remaining funding, 88%, is managed in a decentralized fashion inside the various CMS subsystems Biggest subsystems: Magnet 125 MCHF, ECAL 110 MCHF October 7, 2004 LHC Days in Split

How to Contribute Two main ways: Cash Transfer of funds and responsibility, e.g. Magnet Common Fund In-kind Responsibility for a particular item at an agreed value, e.g. support feet for the Magnet And payments to specific contracts October 7, 2004 LHC Days in Split

Formalities Memorandum of Understanding for CMS Construction Institutes and/or Funding Agencies sign a commitment to fund the experiment Annexes are included presenting the repartition of the funding and the cost estimates for the detector Not legally binding, but honor bound Resources Review Board Oversight committee for the CMS Construction, all MoU signatories are represented Meets twice a year (next one end of October, 19th meeting), approves budgets and expenditures October 7, 2004 LHC Days in Split

Matching Funds and Costs The MoU specified in 1998 an estimated total cost of 460 MCHF and matching funding Review of the cost estimates in 2001, Cost to Completion Cost increases for a total of 55 MCHF A few problems in the funding New cost estimate of 515 MCHF Additional funding promised, total of 500 MCHF Deficit covered with staging of less urgent and critical parts October 7, 2004 LHC Days in Split

After Construction Construction of the LHC experiments is scheduled to finish in 2007 Experiments will have to function for many years There is a need to Operate the detector and to Maintain it Estimates have been made in 2001 and are constantly updated for the Maintenance & Operation costs Memorandum of Understanding for M&O has been presented to the Resources Review Board in Spring 2002 and signatures have been collected October 7, 2004 LHC Days in Split

Maintenance & Operations M&O is divided in two categories, A and B A covers the common needs of the CMS experiment as a whole B covers the needs of each CMS subsystem Each subsystem has its own category B M&O M&O-A is shared amongst Institutes by number of participating scientists Each subsystem chooses independently the cost sharing for its own M&O-B October 7, 2004 LHC Days in Split

Maintenance & Operations (2) M&O-A contributions are handled like a Common Fund, centrally invoiced, collected, managed and reported in detail to the Resources Review Board. M&O-B is handled directly by the Institutes to maintain and operate the equipment under their responsibility. Only a small share of the M&O-B might need to be centrally handled under the supervision of the subsystem concerned October 7, 2004 LHC Days in Split

Some Facts for Croatia in CMS Participates in Magnet: Common Fund, cash contribution ECAL: Crystals and APDs, payments to contracts Total contribution 329 kCHF (280 MoU, 49 Cost to Completion) 0.2% of ECAL funding 0.3% of Magnet Common Fund 0.4% of CMS PhDs 2.1% of CMS ECAL PhDs October 7, 2004 LHC Days in Split

Some Facts for Croatia in CMS (2) Industry participation: Koncar Copper busbar October 7, 2004 LHC Days in Split

Draft Budget 2005 for Construction by FA October 7, 2004 LHC Days in Split

Commitment by Funding Agency 2003 October 7, 2004 LHC Days in Split

Payments 2003 October 7, 2004 LHC Days in Split

Scientists Participation in CMS October 7, 2004 LHC Days in Split

Draft Budget for M&O 2005 October 7, 2004 LHC Days in Split

M&O Costs 2002-2010 October 7, 2004 LHC Days in Split